• Title/Summary/Keyword: Work management system

Search Result 3,462, Processing Time 0.045 seconds

A Study on the Activities of Management Quality and Management Performance of Public and Private Organizations in the Metropolitan area (수도권 소재 공사기관의 경영품질활동과 경영성과에 관한 연구)

  • Chung, Young-Bae;Park, Hyung-Geun
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.4
    • /
    • pp.561-579
    • /
    • 2010
  • This study is to devide seven subject organs in the metropolitan area by the Malcolm Baldrige's basis which is global standard of management quality to grip the each activities of management quality, to conduct a survey of the management quality of each organ or persons in charge of similar works. Generally, those surveyed show to recognize on the management quality and to apply to real work. Those surveyed show to be able to improve positively quality and service level in case of appling to work of management quality, and to be positive reaction on the contribution about management performance. This study indicates the predominant view which the researcher have to establish the its vision clearly and to promote in a lump success factors of management quality, and the chief executive have to take a firm faith for it. This study also suggest that recognizing positively about its vision and strategy about present condition of management quality activities is one of the implements which not only judge but also establish a good system of an organization. And there has a significant difference between Public and Private Organizations that those evaluate management quality conducts better management performance. However management quality activities shows to mostly agree to be influencing positively to management performance.

Design of Information Application of Decreasing Safety Stock in the Logistics (물류업 안전재고 감축을 위한 정보시스템 설계)

  • Kim, Min-Jun;Park, In-Sul;Yun, Jun-Sub;Hong, Sang-Tae
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.194-198
    • /
    • 2005
  • Inventory information system is providing the benefits of smoother demand, lower inventories(work in process, safety stock) and reduced costs. This study focused on improvement of safety level inventory efficiency by inventory information system. The results indicated that inventory information system allowed the company to serve its customers more surely and efficiently.

  • PDF

Buffer System Design in the Flexible Manufacturing System Environments (유연생산(柔軟生産)시스템에서의 버퍼시스템 설계(設計))

  • Gang, Hui-Jeong;Kim, Hwan-Seong;Jo, Nam-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.2
    • /
    • pp.118-128
    • /
    • 1992
  • The determination of appropriate buffer capacity is an important issue in the design of the advanced manufacturing systems and closely related to the system efficiency and flexibility. Work-in-process is usually not desirable. However, in reality, maintaining some capacity of buffer storage is inevitable in compensation for the machine blocking and break down. The objective of this paper is to present analytical methods and tools for the buffer capacity planning in the Flexible Manufacturing System Environments. The effects when machine blocking is critical factor are also discussed.

  • PDF

A Study on BIM based the Establishment of Integrated Maintenance System for Government Office Building in Jeju (BIM기반 제주 공공청사 통합 유지관리 시스템 구축 방안)

  • Kim, Hanjoon;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.57-58
    • /
    • 2020
  • Recently, government office buildings have become important in reducing maintenance costs. However, the loss of information raised a problem for maintenance work that could not meet the needs of users. Therefore, this study proposed a BIM-based integrated maintenance system for public offices in Jeju to efficiently maintenance work. The system can be integrated with IoT sensors, big data and artificial intelligence technologies to integrate information that occurs throughout the building's entire life cycle to exchange information. This system is also scalable to buildings, plants, region and urban infrastructure facilities as well as single buildings. It is expected that the system will provide reliable, high-quality, real-time information for efficient maintenance work, thereby supporting decision making and appropriate budget planning.

  • PDF

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

Development of a Reflective Collaborative Work System for e-Learning Contents Development (e-Learning 콘텐츠 개발을 위한 성찰적 협력작업시스템 개발)

  • Cho Eun-Soon;Kim In-Sook
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.3
    • /
    • pp.108-115
    • /
    • 2006
  • e-Learning contents are composed of compounding multimedia data. It requires many professionals in contents development stage. The process of e-learning contents development can be seen as a collaborative work. In the perspective of a collaborative work process, the whole process of e-learning contents development would be regarded as collaborative work process for each participant as well as for whole group members. Most of collaborative works in contents development field are widely distributed. Members of work groups require workspaces for sharing information and communicating each other. In addition to workspaces, it also needs to support collaborative reflection such as planning for collaborative work and monitoring for work process. This paper is intended to develop the reflective collaborative work system for e-Learning contents development in order to support the systemic process of e-learning contents development. The reflective collaborative work system is composed of four supportive parts: work flow management, personal workspace, collaborative workspace, and collaborative reflection.

  • PDF

A Model for Construction Data Integration Based on Growth of Construction Object throughout the Overall Project Phases (프로젝트 단계별 건설객체의 성장에 근거한 건설데이터 통합 모델)

  • Kim Woo-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.143-150
    • /
    • 2003
  • Using integrated construction project data is necessary for efficient management of construction projects. Recently IFC(Industry Foundation Classes) are proposed as integration method based on interoperability and there have been several cases of system integration based on IFC. The concept of interoperability proposes the construction object as data sharing protocol between systems for system integration and independence of each system. This study proposes system development strategy by phases considering work scope and procedure of processes based on the concept of interoperability. This is proposed to overcome tendency of developing system which doesn't support real work processes as result of inclining to the format of IFC instead of properly using IFC's interoperability concept to real work scope and procedure.

  • PDF

User Task Management System based on Device Priority (기기 우선순위 기반 사용자 작업관리 시스템)

  • Jang, Kiman;Jeong, Dohyeong;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.3
    • /
    • pp.657-662
    • /
    • 2017
  • Recently, according to the development of the smart home field, it provides a service to install and keep the smart home appliance in a user's residential environment pleasantly. However, the conventional system method has a problem in that it is not convenient because the user selects a device or manually operates the device. In this paper, we propose a system to set the priority of the devices selected by the user and proceed with the work. When a user selects a device, it recommends a device associated with the device. Compare and set the priority of each device. And it is a system that carries out work according to the set priority. Therefore the proposed system is expected to provide users with increased convenience and efficiency of work management.

New System for Environmental Management Evaluation

  • Kametani, Tsuyoshi
    • International Journal of Quality Innovation
    • /
    • v.5 no.1
    • /
    • pp.23-33
    • /
    • 2004
  • In Japan, where ISO14001 certifications have passed the 10,000 mark, the need for environmental management has taken firm root among companies. However, in the small-and medium-enterprise sector, and among tiny businesses, there are firms not obtaining ISO certification due to their concern about human resources and increased work load. On the other hand, among businesses that have already succeeded in gaining ISO certification. one does not sense any growth with regard to the continual improvement. Voices from certain quarters indicate there is a lack of incentive to keep on improving. With this background, we herewith present a new system to evaluate the level of environmental management in a company by means of a 5-step system.

Study on Developing Simulator for Activating Company Risk Management System (위기관리 시스템 활성화를 위한 시뮬레이터 개발에 관한 연구)

  • Ki Jae-Sug
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.237-249
    • /
    • 2006
  • Critical incident can be happened at any time, any places without any pre-notification. For minimizing the loss of the life safety, financial and so on caused by the risk, most of company needs a system what can activate the critical incident management plan to prevent, plan for and respond to events that become critical incident. But a lot of company still don't have such a detailed system in our country and almost company has no effective training way for to boot. This paper shows the way to activate the risk management system to work efficiently the plan. The training way, proposed by this paper, is a incident command simulator based on virtual reality and scenario generation software.

  • PDF