• 제목/요약/키워드: Work Breakdown Structure(WBS)

검색결과 96건 처리시간 0.032초

건설 산업의 시설물 자산관리를 위한 분류체계 역량 (Breakdown Structures for Physical Asset Management in Built Environment)

  • 다금;문경필;이윤섭;정영수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.305-306
    • /
    • 2021
  • Breakdown structure (BS) is a tool used to allocate information packages for various management functions and drive computerized information systems. Although several BS exists, work breakdown structures (WBS) and cost breakdown structures (CBS) are the most widely studied and used in previous literature. Nevertheless, heterogeneity of BS and respective management capabilities in current practices are not adequately addressed. In this context, this paper compared the management capabilities of various BS in both building and plant industries through systematic literature. Management requirements and applications scope, in terms of life cycle and stakeholder, were analyzed, respectively. Finally, finding and lesson-learned are outlined.

  • PDF

FMEA를 통한 공중발사 로켓, 미리내II의 신뢰성 설계 (Design for Reliability of Air-Launching Rocket, MirinaeII Using FMEA(Failure Modes and Effects Analysis))

  • 김진호;배보영;이재우;변영환;김경미
    • 한국항공우주학회지
    • /
    • 제36권12호
    • /
    • pp.1193-1200
    • /
    • 2008
  • 신뢰성 분석과 고장형태 및 영향분석(FMEA)으로 구성된 신뢰성 설계 절차를 정립하고, 극소형 위성 발사를 위한 공중발사 로켓, 미리내 II의 신뢰도 분석을 수행하였다. 신뢰성 분석 결과를 이용하여 미리내 II가 주어진 운영환경 내에서 임무시간동안 목표 궤도 진입이 가능한지를 분석하였다. 신뢰성 분석 과정에서는 작업분류체계(WBS)를 이용하여 시스템을 목록화 하였으며, 시스템의 작동개념도를 바탕으로 신뢰도 블록 선도(RBD)를 정립하여 신뢰성 구조를 파악하였다. FMEA를 통하여 구성품 및 부품들의 위험 우선순위를 판단하였고 위험도가 높은 구성품 및 부품들을 설계 변경한 결과, 목표 신뢰도를 만족하였으며 위성이 목표 궤도에 안전하게 진입될 수 있는 신뢰성 설계를 수행하였다.

업무분할체계를 이용한 사업관리정보시스템 (Project Management Information System Using Work Breakdown Structure)

  • 이정구
    • 한국산업정보학회:학술대회논문집
    • /
    • 한국산업정보학회 1997년도 추계학술대회 발표논문집:21세기를 향한 정보통신 기술의 전망
    • /
    • pp.303-320
    • /
    • 1997
  • In A institute, project managers present quarterly project performance report according to institute's law. In quarterly project performance report, progress of project performance and budget expended should be written. Progress of project performance and progress of budget expended are key management factors in A institute. Because financial database system Is already constructed, progress of budget expended is got from information system. But the progress of project performance that project manager estimate subjectively can not be judged of its correctness because there is not project management information system that is able to calculate the progress of project performance systematically. In this study, we present the project management system assign all activities to every project participator according to their work share rate using WBS(Work Breakdown Structure) and calculate the progress of project performance systematically Also we construct project management information system for above project management system implementing.

  • PDF

무기체계 획득시 WBS를 활용한 운용시험평가 항목 도출방법 개발 (A Deriving methodologies for OT&E items using WBS when acquiring a weapon system)

  • 박종완;정희태
    • 시스템엔지니어링학술지
    • /
    • 제18권2호
    • /
    • pp.1-10
    • /
    • 2022
  • In general, similar or previous projects are mainly referred to in order to derive operational test and evaluation(OT&E) items after acquiring weapon system. The idea that a more systematic method is needed is spreading because some of OT&E items derived in this process are redundant or unnecessary. Therefore, in this topic, we plan to use WBS, a tool that classifies components into a hierarchical structure and manages development easily to achieve the weapon system development goal. In addition, the WBS tool is applied to the medium-sized standard vehicle project, which is currently being research and developed, to effectively derive OT&E items. As a result of deriving OT&E items by applying WBS to the vehicle development field and electric devices of the medium-sized standard vehicle project, the operability and relationship were judged early, and then contents of the evaluation items could be written substantially while working on environmental adaptability. In the future, it is judged that the efficiency will be increased if the method discussed in this paper is applied when deriving the OT&E items from the R&D development project.

3단형 위성발사체 작업분류체계 개발

  • 이준호;조미옥;서윤경
    • 항공우주기술
    • /
    • 제4권1호
    • /
    • pp.122-128
    • /
    • 2005
  • 소형위성발사체(KSLV-I) 개발사업의 발사체 예비설계 단계에서 3단형 위성발사체(예비안)의 작업분류체계(WBS)를 개발하였다. 본 논문에서는 작업분류체계 개발의 배경과 세부 항목 및 전체적인 구성 등을 기술하였다. 아울러 작업분류체계의 운영 계획도 수립하였다.

  • PDF

전산지원 시스템공학을 응용한 경량전철 시스템 개발 (Application of Computer-Aided Systems Engineering to Light Rail Transit System Development)

  • 박중용;박영원;이중윤;안장근;목재균;이우동
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.435-435
    • /
    • 2000
  • Light Rail Transit (LRT) system is a complex and large system in which there are many subsystems, interfaces, functions and demanding performance requirements. Because many contractors participate in the development, it is necessary to apply methods of sharing common objectives and communicating effectively among all of the stakeholders. This paper shows not only the methodology and the results of computer-aided systems engineering including requirement management, functional analysis and architecting LRT system, but also propose a tool to help manage a project by linking WBS (Work Breakdown Structure), work organization and PBS (Product Breakdown Structure). The application of computer-aided tool RDD-100 provides the capability to model product design knowledge and decisions about important issues such as architecting the top-level system. The product design knowledge will be essential in integrating the following life-cycle phase activities over the life of the LRT system. Additionally, when a new generation train system is required, the reuse of the database can increase the system design productivity and effectiveness significantly.

  • PDF

WBS 기반의 국책 건설사업 기록물 분류체계에 대한 연구 (A Study on the Classification System of National Construction Project based on WBS)

  • 정기애;정국환;김창하
    • 정보관리연구
    • /
    • 제41권1호
    • /
    • pp.173-200
    • /
    • 2010
  • 정부 주도하에 정책적으로 이루어지는 국책 건설사업은 국가의 사회간접자본시설에 주로 집중되며 상당한 국가예산이 투입되고 관련 분야의 전문적 역량이 총체적으로 투입되는 장기적 사업이다. 일반적으로 사회기반시설은 반영구 혹은 영구적 국가 자산으로 유지하게 되며 그에 따른 기록물 또한 해당 시설물의 수명기간 동안 보존 활용되어야 한다. 또한 국책사업 특성상 다양한 이해관계자 간의 유기적 협의체계를 지원하고 오랜 기간 동안 일관된 문서 및 기록관리체계를 유지하기 위해서는 기관별 특성을 최대한 배제한 사업 역무 위주의 표준화된 분류체계의 수립이 필요하다. 따라서 국책사업 기록물의 분류체계는 사업 자체 업무 분석을 근거로 사업 업무분류체계(WBS : Work Breakdown Structure)를 기반으로 수립되어야 한다. WBS는 프로젝트 관리(PM) 분야에서 통상적인 사업관리 기법으로 업무구분을 위해 사업초기에 수립되며, 프로젝트 목표를 달성하고 필요한 인도물을 산출하기 위하여 프로젝트 팀이 실행할 작업을 인도물 중심으로 분할한 계층 구조체계이다. 따라서 본 연구는 WBS에 기반한 국책사업 기록물 분류체계 수립에 대한 구체적인 사례와 방안을 제시함으로써 현 관리, 행정기록물 중심의 기록물 분류 체계에 대한 새로운 시각을 제시하는 데 목적이 있다.

SE, CM, EVM 통합을 통한 사업 관리 향상 방안

  • 석연숙;강성진;박인경;권용수
    • 한국경영정보학회:학술대회논문집
    • /
    • 한국경영정보학회 2007년도 International Conference
    • /
    • pp.1023-1029
    • /
    • 2007
  • 우리는 국가 경쟁력의 한 분야인 사업관리에 있어 계획, 수행, 성과관리, 개선에 최적의 프로세스 보유가 요구된다. 그러나 Project관리체계의 현 실태는 일정관리, 범위관리, 비용관리에 초점을 맞춘 일정관리체계, WBS(Work Breakdown Structure) 및 OBS(Organizational Breakdown Structure)관리, 비용관리체계의 부분 통합 혹은 서로의 연계 정도이다. 본 연구는 최적의 사업관리를 위하여 계약관리에 체계공학을 연계하여 계약 전에 WBS, IMP/IMS(Integrated Master Plan)/(Integratcd Master Schedule), TPM(Technical Performance Measurement) 등의 SEP(Systems Engineering Plan)와 계약 후의 이행을 검증 할 수 있는 과정의 Guideline을 제시하고, IEEE 1220, ANSI/EIA 632 순기 의거 개념설계부터 통합시험에 이르는 체계공학 순기에 따른 비용예측이 가능한 USC(University of Southern CalIfornia) 대학의 COSYSMO (Constructive Systems Engineering Cost ModeI)를 소개하고 적용 가능성을 고찰하며, Project의 전순기에 걸쳐 TPM 혹은 Quality를 비용과 일정에 통합하여 관리하는 PBEV(Performance Based Earned Value)모델을 소개하고 적용 가능성을 제시한다. Project 관리에 있어 System 차원을 강조한 SE(Systems Engineering), 비용예측의 CM(Cost Management), 성과관리를 위한 EVM(Earned Value Management)의 통합은 사업 관리에 역량을 강화하며 경쟁력을 향상 시킬 수 있는 적절한 접근으로 사료된다.

  • PDF

BIM기반의 WBS 구축을 위한 정보프레임워크 도입방안 연구 -토목사업의 적용을 중심으로- (A Study on Applying Information Framework for BIM Based WBS -Focusing on Civil Construction-)

  • 남정용;조찬원;박소현
    • 한국산학기술학회논문지
    • /
    • 제18권11호
    • /
    • pp.770-777
    • /
    • 2017
  • BIM(Building Information Modeling)은 2000년대 들어서면서 기존의 CAD를 대신하여 통합정보모델로서의 관심과 기대를 받아왔다. 건설산업 전체 중에서 건축분야에서 먼저 활용되기 시작한 BIM기술은 토목분야에서는 상대적으로 늦게 도입이 되기 시작하였다. 그러나 정부에서 2020년부터 모든 SOC사업의 20%를 적용계획을 발표하는 등 토목사업에서의 도입은 가속화 될 것으로 예상된다. BIM을 성공적으로 도입하기 위해서는 통합적 설계정보에 대한 체계적인 구조와 이를 구현하는 기술이 뒷받침되어야 한다. 또한 건설사업에서 정보화는 많은 복잡한 요소들이 얽혀 있어 정보체계간의 관계 정립이 무엇보다 중요하다. 본 연구에서는 토목사업에 BIM을 도입하기 위한 정보관계를 규명하여 통합정보를 구성하기 위한 프레임워크를 제시하고 이를 교량사업에 적용하여 그 효용성을 확인한다. 본 연구는앞으로 토목분야에서 WBS(Work Breakdown Structure)를 BIM에 도입하여 공정 및 공사비 관리를 통합적으로 수행하는데 활용될 수 있다. 또한 BIM을 도입하기 위한 정보체계의 표준화에 대한 방향제시를 통하여 앞으로 토목의 각 분야에서 BIM을 도입하는데 도움이 될 것이다.

세일링 요트 엔지니어링 통합 관리를 위한 Generic-YWBS 개발 (Development of a Generic-YWBS for Engineering Integrated Management of Sailing Yacht)

  • 이동건;남승훈;정용국;신종계
    • 대한조선학회논문집
    • /
    • 제51권1호
    • /
    • pp.16-25
    • /
    • 2014
  • To develop a sailing yacht successfully, systematic engineering information is required including technologies from various companies and know-how about sailing yacht. The engineering information about sailing yacht has a complex and extensive structure. Therefore, a robust and high-level of management system is needed to manage the information. In this paper, we design and propose Generic-YWBS (Generic-Yacht Work Breakdown Structure), a work breakdown structure for sailing yachts. The Generic-YWBS is aimed at constructing sailing yachts and contains contents about product- and process-oriented information of sailing yachts. In addition, the Generic-YWBS plays an important role in managing the engineering information as a basic schema of database and system architecture. The Generic-YWBS is derived from fundamental WBS design processes and various rules about sailing yachts, for example, ISAF (International Sailing Federation) equipment rule and IRC rating rule, and a generic structure concept is applied for flexibility. The Generic-YWBS is applicable for various purposes. We designed a detailed code system in order to apply the Generic-YWBS to contents management system. The series of activities are realized through a web-based RIA(Rich Internet Application) program. This program manages the YWBS structure in an XML schema, and the Generic-YWBS management application offers a customizing function to be adapted in the field.