• Title/Summary/Keyword: Wind Generator

Search Result 913, Processing Time 0.024 seconds

Output Power Control of Wind Generation System using Estimated Wind Speed by Support Vector Regression

  • Abo-Khalil Ahmed G.;Lee Dong-Choon
    • Proceedings of the KIPE Conference
    • /
    • 2006.06a
    • /
    • pp.345-347
    • /
    • 2006
  • In this paper, a novel method for wind speed estimation in wind power generation systems is presented. The proposed algorithm is based on estimating the wind speed using Support-Vector-Machines for regression (SVR). The wind speed is estimated using the generator power-speed characteristics as a set of training vectors. SVR is trained off-line to predict a continuos-valued function between the system's inputs and wind speed value. The predicted off-line function as well as the instantaneous generator power and speed are then used to determine the unknown winds speed on-line. The simulation results show that SVR can define the corresponding wind speed rapidly and accurately to determine the optimum generator speed reference for maximum power point tracking.

  • PDF

Research about the Evaporative Cooling Sleeve of 3.6 MW Wind Generator Stator

  • Yu, Shunzhou;Yang, Jie;Yuan, Jiayi;Tian, Xindong
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.1
    • /
    • pp.61-66
    • /
    • 2014
  • The evaporative cooling technology used in Wind generator stator has unique advantages. Combined with the structure of motor stator and operating conditions, this report based on the research project for the evaporative cooling sleeve of the 3.6MW wind generator, introduces the material requirements and structural characteristics of the sleeve, simulates on the stress, displacement and stability by finite analysis method, and tests the products experimentally. The research results show that the epoxy resin-glass materials have a higher strength and better insulation properties, but the evaporative cooling of the wind generator stator sleeve, because of its thin-walled, and the external pressure, so it's the less rigid. Should make full use of the motor stator core structure, increase its stiffness and improve the stability of the epoxy resin-glass sleeve, which for thin-walled the epoxy resinglass sleeve on the successful application of wind turbines has played an important role.

Optimal Power Control of Wind Induction Generator System (풍력발전용 유도발전기 시스템의 최적제어)

  • Choi SunPill;Heo TaeWon;Park JeeHo;Noh TaeGyun;Jung JaeRoun;Woo JungIn
    • Proceedings of the KIPE Conference
    • /
    • 2002.07a
    • /
    • pp.69-72
    • /
    • 2002
  • In this study, We proposed high efficiency wind power generator system for induction generator used SVPWM swiching inverter. First, We propose Equivalient Circuit for Induction Generator, it's characteristics equation, and power equation of slip. In addition, we suggest Pick Power Traction Slip control methods, adapted variable wind power system. We study simulation result for the proposed system and output power by slip effect. and we identify SVPWM of suitable wind power system by comparison between SPWM and SVPWM Consequently, we show that the system control result from variable wind power is suitable.

  • PDF

Optimal Slip Control of Wind Induction Generator (풍력전용 유도 발전기 최적 슬립제어)

  • Choi, Sun-Pill;Park, Jee-Ho;Noh, Tae-Gyun;Kim, Dong-Wan;Woo, Jung-In
    • Proceedings of the KIEE Conference
    • /
    • 2002.11d
    • /
    • pp.317-319
    • /
    • 2002
  • In this study, We proposed high efficiency wind power generator system for induction generator used SVPWM swiching inverter. First, We propose Equivalient Circuit for Induction Generator, it's characteristics equation, and power equation of slip. In addition, we suggest Pick Power fraction Slip control methods, adapted variable wind power system. We study simulation result for the proposed system and output power by slip effect. and we identify SVPWM of suitable wind power system by comparison between SPWM and SVPWM. Consequently, we show that the system control result from variable wind power is suitable.

  • PDF

Power Management of Open Winding PM Synchronous Generator for Unbalanced Voltage Conditions

  • EL-Bardawil, Ashraf;Moussa, Mona Fouad
    • Journal of Power Electronics
    • /
    • v.16 no.6
    • /
    • pp.2192-2201
    • /
    • 2016
  • Wind energy is currently the fastest-growing electricity source worldwide. The cost efficiency of wind generators must be high because these generators have to compete with other energy sources. In this paper, a system that utilizes an open-winding permanent-magnet synchronous generator is studied for wind-energy generation. The proposed system controls generated power through an auxiliary voltage source inverter. The VA rating of the auxiliary inverter is only a fraction of the system-rated power. An adjusted control system, which consists of two main parts, is implemented to control the generator power and the grid-side converter. This paper introduces a study on the effect of unbalanced voltages for the wind-generation system. The proposed system is designed and simulated using MATLAB/Simulink software. Theoretical and experimental results verify the validity of the proposed system to achieve the power management requirements for balanced and unbalanced voltage conditions of the grid.

Study of Large Wind Power Generator with Evaporative Cooling System

  • Wang, Haifeng;Li, Wang;Guo, Hui;Yang, Jie;Gu, Guobiao
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • v.3 no.1
    • /
    • pp.93-97
    • /
    • 2014
  • Evaporative cooling system has the advantage of high cooling performance, good insulation properties, less electrical fault, easy to maintain and high reliability, can meet the requirements of the cooling system in wind power generators. Based on a large number of theoretical researches and engineering practices, we had a comprehensive study of evaporative cooling wind power generator. Studies show that evaporative cooling system has advantage as the cooling system of wind power generator.

Development of PSCAD Simulation Model for Doubly-fed Induction-type Wind Power Generation System (이중여자 유도형 풍력 발전기의 PSCAD 시뮬레이션 모델 개발)

  • Jeong, Byoung-Chang;Kim, Hee-Jung;Chung, Yong-Ho;Jeon, Young-Soo;Kwak, No-Hong;Song, Seung-Ho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.261-264
    • /
    • 2006
  • In this paper, doubly-fed induction-type wind power generation system simulation model for grid connection is developed. The simulation model is based on PSCAD/EMTDC and consists of rotor-blade, blade controller, generator power converter and generator controller Blade controller controls the blade pitch angle for starting, peak power limiting and emergency condition. Generator controller controls the generator output power to maximize the system efficiency. Simulation results are shown for the variable wind speed conditions. The simulation model can be utilized for study of actual interaction between wind turbine and grid for reliable operation and protection of power system.

  • PDF

Analysis of Dynamic Response of 1.5MW DFIG Wind Power Simulator with Real-grid Connection (실 계통 연계 1.5MW급 DFIG 풍력발전 시뮬레이터의 응동특성 분석)

  • Choy, Young-Do;Jeon, Young-Soo;Jeon, Dong-Hoon;Shin, Jeong-Hoon;Kim, Tae-Kyun;Jeong, Byung-Chang
    • New & Renewable Energy
    • /
    • v.5 no.3
    • /
    • pp.4-12
    • /
    • 2009
  • The effect of change in DFIG (doubly-fed wind power generator) rotating speed and active power on the grid was analyzed to understand the characteristics of wind power using the wind power simulator connected to the grid at Gochang Power Quality Test Center. Electric power quality improvement devices (DVR, STATCOM, SSTS) and electric power quality disturbance application devices for 22.9 kV grid are equipped at Gochang Power Quality Test Center. Induction motor and VVVF inverter were used to emulate the blade of a wind power generator, and a simulator for Cage wound induction generator and DFIG was developed. The trial line were assumed to be 20 km and 40 km in length, and variable wind speed pattern was set using wind speed data from Ducjeokdo to verify the power characteristics of the wind power generator according to rotating speed.

  • PDF

Analysis of effect on power system considering the maximum penetration limit of wind power (풍력발전 한계운전용량에 대한 계통영향 분석)

  • Myung, Ho-San;Kim, Bong-Eon;Kim, Hyeong-Taek;Kim, Se-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.19-25
    • /
    • 2012
  • About supply and demand to see that you need to match, the limitations of wind power capacity is low demand and the commitment of the general generator will exist between the minimum generation. if the turbine's output can be controlled, The limitation of wind power capacity will be adopted based on instant power generation. Namely, The minimum limits of wind power generation based load operation by calculating the amount that is higher than if the output should be restricted to highest operation. in this paper, we committed to the demand for low enough that the combination of the general generator of wind power capacity to accommodate the operation of determining whether the limit is intended to. For this, power system analysis program PSS/E was used, Jeju system by implementing the model simulations were performed.

The Research on the Yeonggwang Offshore Wind Farm Generated Energy Prediction (영광 해상풍력단지 발전량 예측에 관한 연구)

  • Jeong, Moon-Seon;Moon, Chae-Joo;Jeong, Gwan-Seong;Choi, Man-Soo;Jang, Yeong-Hak
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.33-41
    • /
    • 2012
  • As the wind farms in large scale demand enormous amount of construction cost, minimizing the economic burden is essential and also it is very important to measure the wind resources and forecast annual energy production correctly to judge the economic feasibility of the proposed site by way of installing a Met mast at or nearby the site. Wind resources were measured by installing a 80[m] high Met mast at WangdeungYeo Island to conduct the research incorporated in this paper and offshore wind farm was designed using WindPRO. Wind farm of 100[MW] was designed making use of 3 and 4.5[MW] wind generator at the place selected to compare their annual energy production and capacity factor applying the loss factor of 10[%] and 20[%] respectively to each farm. As a result, 336,599[MWh] was generated by applying 3[MW] wind generator while 358,565 [MWh] was produced by 4.5[MW] wind generator. Difference in the energy production by 3[MW] generator was 33,660 [MWh] according to the loss factor with the difference in its capacity factor by 3.8[%]. On the other hand, 23 units of 4.5 [MW] wind generators showed the difference of annual energy production by 35,857 [MWh] with 4.0[%] capacity factor difference.