• 제목/요약/키워드: Wind Energy System

검색결과 1,414건 처리시간 0.024초

2MW급 직접구동형 풍력터빈 제어시스템 개발 (Development of Control System for 2MW Direct Drive Wind Turbine)

  • 문준모;장정익;윤광용;조광명;이권희
    • 풍력에너지저널
    • /
    • 제2권1호
    • /
    • pp.90-96
    • /
    • 2011
  • The purpose of this paper is to describe the control system for optimal performance of 2MW gearless PMSG wind turbine system, and to afford some techniques of the algorithm selection and design optimization of the wind turbine control system through analysis of load calculation and control characteristic. Wind turbine control system is composed of the main control system and remote control and monitoring system. The main control system is industrial PC based controller, and the remote control and monitoring system is a server based computer system. The main control system has a supervisory control of the wind turbine with operation procedures and power-speed control through the torque control by pitch angle. There are some applications to optimize the wind turbine system at the starting mode with increasing of rotor speed, and cut-in operating mode to prevent trundling cut-in and cut-out, a gain scheduling of pitch PID controller, torque scheduling and limitation of generation power by temperature limitation or remote command by remote control and monitoring system. Also, the server operation program of the remote control and monitoring system and the design of graphical display are described in this paper.

국가바람지도 활용시스템 KIER-WindMap$^{TM}$ (Application System for National Wind Map KIER-WindMap$^{TM}$)

  • 김현구;강용혁;이화운;정우식
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 춘계학술대회 논문집
    • /
    • pp.532-533
    • /
    • 2009
  • The national wind map of South Korea has been established as a core data to support national strategy building and promotion of wind energy dissemination. The national wind map has been made by numerical wind simulation with the spatial resolution of 1 km horizontal, 10m vertical and temporal resolution of 1 hour interval for 5 years period (2003-2007). Therefore, an application system linked with the national wind map named KIER-WindMap$^{TM}$ is being developed to be used by the government, local government, developers and researchers. We introduce the current status of the application system and the future development plans.

  • PDF

변동 제주 SMP를 적용한 제주도 육상풍력단지의 경제성 재평가 (Reassessment of Economic Feasibility for a Wind Farm on Jeju Island Considering Variable Jeju SMP)

  • 김효정;고경남;허종철
    • 한국태양에너지학회 논문집
    • /
    • 제33권5호
    • /
    • pp.41-50
    • /
    • 2013
  • Economic feasibility study using weighted average variable Jeju System Marginal Price, SMP, was conducted for Gasiri wind farm of Jeju Island. To predict the variable Jeju SMP, generator share ratio for SMP was calculated from the real time wind power production and the power demand data for years. Also, sensitivity analysis on Net Present Value, NPV, and Benefit/Cost Ratio, B/C ratio, were performed to clarify which factors are more important in assessing economic feasibility. The result shows that the Gasiri wind farm has a minimum of 110 billion won and a maximum of 132 billion won difference between fixed and variable SMP. Also, Capacity Factor, C.F., had the highest sensitivity for NPV, followed by SMP. Accordingly, when economic analysis for a potential wind farm site is carried out, the variable SMP as well as C.F. should be considered for more accurate assessment of the wind farm.

독립형 풍력기반 Smart Microgrid 시스템의 현장 실증 시험을 위한 도서지역 전력 및 경제성 시뮬레이션 (Power and Economic Simulation of Island for the Field Demonstration Test of Smart Microgrid System Based on Stand-alone Wind power)

  • 강상균;이은규;이장호
    • 신재생에너지
    • /
    • 제10권3호
    • /
    • pp.22-30
    • /
    • 2014
  • The isolated self-generating electricity with diesel engine generator has been used in islands far away from main land. It costs high because of increasing oil price, and unsafe to have supplying oil and its related components by ship due to unexpectable marine conditions. Therefore there is the need for the hybrid system of renewable energy like wind or solar energy systems with oil engine generator, which can reduce oil use and extend oil supplying period. In this study, the feasibility of such hybrid system with smart micro grid on the eight islands of Jeon-nam province is surveyed to find good place for the demonstration test of the hybrid system. In each island, 3 wind turbine systems of 10 kW and photovoltaic of 20 kW are tested with already installed diesel engine. The performance and costs of the hybrid system in each island are compared in the given conditions of solar and wind energy potential. As a result of the study, Jung-ma island is recommended for the optimum place to make real field demonstration test of isolated hybrid generating and smart grid systems.

전압형 MMC-HVDC에 의한 제주계통의 풍력한계용량 증대 방안 (A Strategy of Increasing the Wind Power Penetration Limit with VSC Type MMC-HVDC in Jeju Power System)

  • 이승민;김일환;김호민;채상헌;왓나우덩
    • 전력전자학회논문지
    • /
    • 제20권6호
    • /
    • pp.550-557
    • /
    • 2015
  • The Jeju Special Self-Governing Province is currently promoting the "Carbon-free Island by 2030" policy, which requires the use of renewable energy instead of fossil fuel so that the island will have no carbon gases generated by 2030. To implement this policy, the island plans to build a wind power plant capacity of 1.09 GW in 2020; this wind power plant is currently ongoing. However, when wind power output is greater than the power demand of the island, the stability of Jeju Island power system must be prepared for it because it can be a problem. Therefore, this study proposes a voltage source-type MMC-HVDC system linked to mainland Korea to expand the wind power penetration limits of Jeju Island under the stable operation of the Jeju Island power system. To verify the effectiveness of the proposed scheme, computer simulations using the PSCAD/EMTDC program are conducted, and the results are demonstrated. The scenarios of the computer simulation consist of two cases. First, the MMC-HVDC system is operated under variable wind power in the Jeju Island power system. Second, it is operated under the predicted Jeju Island power system in 2020.

대형급 고효율 풍력 발전 시스템 블레이드 구조 설계 및 해석 연구 (A Study on Structural Design and Analysis of Large Scale and High Efficiency Blades for Wind Turbine System)

  • 공창덕;김민웅;박현범
    • 항공우주시스템공학회지
    • /
    • 제6권4호
    • /
    • pp.7-11
    • /
    • 2012
  • Recently, the renewable energy has been widely used as a wind energy and solar energy resource due to lack and environmental issues of the mostly used fossil fuel. In this situation, the interest in wind power has been risen as an important energy source. For this blade a high efficiency wind turbine blade was designed with the proposing aerodynamic design procedure, and a light and low cost composite structure blade was designed considering fatigue life. Structural analyses including load case study, stress, deformation, buckling, fatigue life and vibration analysis were performed using the Finite Element Method.

전압형 HVDC에 의한 제주계통의 풍력한계용량 증대 방안 (An Strategy of Increasing the Wind Power Penetration Limit with VSC-HVDC in Jeju Power System)

  • 이승민;채상헌;김호민;김일환
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2015년도 전력전자학술대회 논문집
    • /
    • pp.461-462
    • /
    • 2015
  • The government on Jeju Special Self-governing Province has a policy named 'Carbon Free Island Jeju by 2030'. The main purpose in this policy is to install wind power system with the total capacity of 1.35 GW by 2020. When the demand load on Jeju Island power system is lower than entire output power, a lot of dump power will be produced from the large-scale wind farms. It will be able to cause the wind power limit on Jeju Island. Consequently, the additional power facility must be installed to ensure stable power system operation in Jeju Island and increase wind power limit. From this point, this paper proposes the installation of MMC-HVDC, which can supply power in real time in the desired direction. The effectiveness of MMC-HVDC based on measured data of Jeju Island power system will be verified by using PSCAD/EMTDC simulation program.

  • PDF

Real-Time Peak Shaving Algorithm Using Fuzzy Wind Power Generation Curves for Large-Scale Battery Energy Storage Systems

  • Son, Subin;Song, Hwachang
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • 제14권4호
    • /
    • pp.305-312
    • /
    • 2014
  • This paper discusses real-time peak shaving algorithms for a large-scale battery energy storage system (BESS). Although several transmission and distribution functions could be implemented for diverse purposes in BESS applications, this paper focuses on a real-time peak shaving algorithm for an energy time shift, considering wind power generation. In a high wind penetration environment, the effective load levels obtained by subtracting the wind generation from the load time series at each long-term cycle time unit are needed for efficient peak shaving. However, errors can exist in the forecast load and wind generation levels, and the real-time peak shaving operation might require a method for wind generation that includes comparatively large forecasting errors. To effectively deal with the errors of wind generation forecasting, this paper proposes a real-time peak shaving algorithm for threshold value-based peak shaving that considers fuzzy wind power generation.

도시철도차량 주행풍을 이용한 터빈형 플라이휠 에너지 저장시스템 개발에 관한 연구 (Development of a Turbine Based Flywheel Energy Storage System Using Traveling Wind Power of an Urban Train)

  • 서용범;임재문;신광복
    • 한국생산제조학회지
    • /
    • 제23권5호
    • /
    • pp.443-449
    • /
    • 2014
  • This study aims to develop a Flywheel Energy Storage System (FESS) that uses wind power produced when an urban train is in motion, by utilizing a mounted turbine. This system was designed to generate and store electric power from wind power of a travelling urban train. The flywheel was designed to continue rotation using a one-way clutch bearing installed in the turbine shaft pulley, even in cases where the urban train decelerates or stops. This FESS can generate an additional 44% of electric power in comparison to a system not equipped with a flywheel. The generated power and operational features of the FESS were evaluated and verified through a wind tunnel test. The results show that the electric power stored in the FESS could supply auxiliary power for urban train components or service equipment, such as charging mobiles, Wi-Fi modules, and electric lights.

우크라이나 풍력발전 현황 및 전망 (Current Status and Prospects of Ukrainian Wind Energy)

  • 김현구;박희천
    • 신재생에너지
    • /
    • 제7권1호
    • /
    • pp.8-14
    • /
    • 2011
  • As is the case in Korea, the expansion of renewable energy dissemination is an essential matter in Ukraine when considering its energy consumption and dependence on energy import. While Korea has set about promoting the new and renewable energy industry on the back of the national policy on green growth, Ukraine expects a virtuous circle of renewable energy industry with green tariffs and the attraction of foreign capital in association with carbon emission trade. Utilizing its well-developed heavy industrial sector including the shipbuilding and automobile industries, Korea expects wind turbine manufacturing to become one of its next-generation growth engines. Ukraine is also trying to enter the wind turbine system or parts manufacturing industry based on its automobile industry and advanced aerospace technology. Although the Crimean region in Ukraine seems to have excellent wind resources, and thus shows great potential as a location for wind farm development, political instability has been a major obstacle to the attraction of foreign capital, leading to delayed investment.