• Title/Summary/Keyword: Web project management

Search Result 262, Processing Time 0.025 seconds

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF

USING WEB CAMERA TECHNOLOGY TO MONITOR STEEL CONSTRUCTION

  • Kerry T. Slattery;Amit Kharbanda
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.841-844
    • /
    • 2005
  • Computer vision technology can be used to interpret the images captured by web cameras installed on construction sites to automatically quantify the results. This information can be used for quality control, productivity measurement and to direct construction. Steel frame construction is particularly well suited for automatic monitoring as all structural members can be viewed from a small number of camera locations, and three-dimensional computer models of steel structures are frequently available in a standard electronic format. A system is being developed that interprets the 3-D model and directs a camera to look for individual members as regular intervals to determine when each is in place and report the results. Results from a simple lab-scale system are presented along with preliminary full-scale development.

  • PDF

DEVELOPING WEB-BASED 5D SYSTEM CONNECTING COST, SCHEDULE AND 3D MODEL

  • Hando Kim;Jaehong Kim;Junghoon Han;Yonghan Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.157-161
    • /
    • 2011
  • BIM having started from architecture is being used in civil structure, but there are very few examples despite its effectiveness. In this paper, based on BIM technology, it is presented the method and result of developing web-based 5D system connecting cost, schedule and 3D model from the cable-stayed bridge. Through the system, the user can understand easily schedule on specific time and during some period and extract cost directly. This system also can manage various data types such as drawings, 3D models, documents and photos, for enhanced communication between stakeholders.

  • PDF

Development and Application of a Web-based Expert System using Artificial Intelligence for Management of Mental Health by Korean Emigrants (해외 이민 한국인의 정신건강관리를 위한 웹기반 지능형 전문가시스템 개발 및 적용)

  • Bae, Jeongyee
    • Journal of Korean Academy of Nursing
    • /
    • v.43 no.2
    • /
    • pp.203-214
    • /
    • 2013
  • Purpose: The purpose of this project was to develop an international web-based expert system using principals of artificial intelligence and user-centered design for management of mental health by Korean emigrants. Using this system, anyone can access the system via computer access to the web. Methods: Our design process utilized principles of user-centered design with 4 phases: needs assessment, analysis, design/development/testing, and application release. A survey was done with 3,235 Korean emigrants. Focus group interviews were also conducted. Survey and analysis results guided the design of the web-based expert system. Results: With this system, anyone can check their mental health status by themselves using a personal computer. The system analyzes facts based on answers to automated questions, and suggests solutions accordingly. A history tracking mechanism enables monitoring and future analysis. In addition, this system will include intervention programs to promote mental health status. Conclusion: This system is interactive and accessible to anyone in the world. It is expected that this management system will contribute to Korean emigrants' mental health promotion and allow researchers and professionals to share information on mental health.

SUSTAINABLE DESIGN AUTOMATION AND MANAGEMENT USING XML

  • Byeong Cheol Lho;Jeong Hoon Kim;Ok Youn Yu;Julian Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.592-595
    • /
    • 2005
  • Concrete slab bridge is one of most common structures employed for local road constructions because of its simplicity in design and construction. Computer applications were developed to automate the repetitive computation for these simple structures. However, in most cases, managing the electronic documents produced by these applications has not been incorporated with design automation application yet. Resultant documents are often managed by individuals and disappear as time goes by due to lack of systemic management. This paper introduces a Web-based application developed to not only speed up the design process but also enhance the collection and manipulation of resultant electronic documents.

  • PDF

Construction Material Management Using Smart Mobile Computing (스마트 모바일 어플리케이션을 이용한 건설 자재 관리)

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moon-Seo;Kim, Eui-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.4
    • /
    • pp.59-69
    • /
    • 2011
  • Construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause reprocessing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. This will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible.

Impacts of Exploitation and Exploration on Performance of Open Collaboration: Focus on Open Source Software Development Project (지식의 탐색(Exploration)과 활용(Exploitation)이 개방형협업의 성과에 미치는 영향: 오픈소스 소프트웨어 개발 프로젝트를 중심으로)

  • Lee, Saerom;Baek, Hyeon-Mi;Jang, Jeong-Ju
    • Knowledge Management Research
    • /
    • v.18 no.2
    • /
    • pp.85-102
    • /
    • 2017
  • With rapid development of information and communication technologies, open collaboration can be eased through the Internet. Open source software, as a representative area of open collaboration, is developed and adopted to various fields. In this research, based on organizational learning theory, we examine the impacts of exploration and exploitation on innovation performance in open source software development projects. We define knowledge exploration as a number of developers from outside organization and knowledge exploitation as the ratio of member of an organization who participated in an open source software project managed by the organization. For analysis, we collect data of 4794 projects from github which is a representative open source software development platform using Web crawler developed by Python. As a result, we find that excessive exploration has curvilinear (invers U-shape) relationship on project performance. On the other hand, exploitation with enough external developers will positively impact on project performance.

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Design and Implementation of Project Learning Site by Using XML (XML을 이용한 프로젝트 학습사이트의 설계 및 구현)

  • Choe, Hyun-Kun;Ha, Tai-Hyun
    • Journal of Digital Convergence
    • /
    • v.5 no.2
    • /
    • pp.123-134
    • /
    • 2007
  • The purpose of this study is to design and implementation of project learning site by using XML. The development of the Internet site for project learning was planned as per preparation, development and test/application stages. The research shows that the elements used for the development of the Internet site for project learning are to give learners motivation, specification of learning goals, reminiscence of preceding knowledge, positive participation in teaching activities, learning-guide feedback, evaluation, reinforcement and correction. It is expected that many teachers apply this model to their classes and show realistic results to motivate their students.

  • PDF

Administrative Information Web-based Centre (AIC)

  • Ruiz, Vitor M.;Gallud, Jose A.;Lopez, Miguel
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.13-24
    • /
    • 2004
  • Administrative procedures are the heart of the activity in each Town Council. Citizens do transactions every day and, sometimes, they do not understand what they must do or the steps to follow. We are developing a Web-based system to help citizens with this task in an easy way. The application is integrated a four year project called Albacete[Digital] that began in 2002 with the purpose of building an e-government system in Albacete, a city with over 150.000 citizens. This Administrative Information Centre is the result of the Administration study in the first year of the project and it will continue with the on-line transaction in the following years.

  • PDF