A study of diamond wire rock cutting process analysis by FEM

  • Kabir, Mohammed Ruhul;Sagong, Myung;Ahn, Sung-Kwon
    • 한국터널지하공간학회 논문집
    • /
    • 제17권6호
    • /
    • pp.615-621
    • /
    • 2015
  • In this paper diamond wire cutting method has been proposed to cut the rock in the tunnel face. Diamond wire saw method could cut the rock from tunnel face with very minor vibration and noise. In this study rock cutting process has been simulated with FEM method by using LS-DYNA explicit non-linear finite element code. Normal load act as an prime factor when cutting the rock surface. For observing the effect of normal load on bead, several experiments has been conducted by varying normal loads on the bead. From each experiment, cutting rate has been calculated to compare the cutting rate with different load conditions. By increasing the normal load on bead, cutting rate increases drastically.

시공단계의 진동레벨 단위적용에 관한 사례 연구 (A Case Study on the Application of Vibration Level Units in the Construction Phase)

  • 최형빈;김동연
    • 화약ㆍ발파
    • /
    • 제30권2호
    • /
    • pp.86-97
    • /
    • 2012
  • 건설현장의 노천발파로 발생되는 지반진동은 인체의 간접피해 및 구조물의 물적 피해를 동반하며, 인체는 진동레벨, 구조물은 진동속도 단위로 평가한다. 본 연구는 실시단계 진동기준 중 진동속도 외 누락된 진동레벨 단위를 추가, 진동속도 및 진동레벨을 동시 측정한 적용사례로서 추후 민원이 예상되는 현장관리에 도움이 될 것으로 여겨진다. 발파진동 및 진동레벨 추정식 도출을 위한 표본수는 총 232개가 사용되었으며, 진동속도 0.3 cm/s와 진동레벨 75 dB(V) 기준의 지발당장약량을 비교한 결과, 후자가 20.0~40.9% 여유가 있음을 입증하여 진동레벨 단위척도 추가는 전혀 문제되지 않음을 언급하였다. 소음 진동 관리법이 우선된다면 노천발파 시공비용은 훨씬 저감될 것으로 생각된다. 본 연구에서 사용된 계측기기는 국내에서 처음으로 진동속도 및 진동레벨을 동시 측정할 수 있는 특성을 지닌 SV-1모델을 사용하였다.

열차 하중조건을 고려한 마찰형 방진장치 성능시험 및 마찰특성 분석 (Analysis of Performance Tests and Friction Characteristics of a Friction Type Isolator Considering Train Load Conditions)

  • 고용성;이찬영;지용수;김재왕
    • 한국산학기술학회논문지
    • /
    • 제18권3호
    • /
    • pp.694-702
    • /
    • 2017
  • 선하역사의 경우 차량-궤도에서 발생하는 하중 및 진동이 직접적으로 전달되는 구조적 한계로 인하여 발생하는 구조체 전달 형태의 진동과 소음레벨이 다른 역사형식 대비 월등히 높음으로 인하여 역사 내 상업 및 업무시설 이용객과 종사자들의 불편과 민원이 증가하고 있다. 선하역사에 발생하는 소음 진동을 저감하기 위한 대책중 하나로 알려진 플로팅 궤도의 경우 궤도 하부에 고무 마운트나 패드 요소를 적용한 장치가 주로 설치되어 댐퍼 역할을 한다. 이러한 장치의 경우, 열차 운행 시 발생하는 비선형 하중에 대하여 정확한 강성 및 감쇠비를 설계하기 어렵다는 단점이 있다. 본 연구에서는 플로팅 궤도에 적용 가능하며 정확한 강성 설계가 가능한 마찰 쐐기형 방진장치를 소개한다. 또한, 방진장치 강성 설계값과 시험값을 비교 분석하고 마찰 쐐기형 블록 배치에 따른 감쇠비를 열차 하중조건에 따라 도출하였다. 방진장치의 성능시험은 DIN45673-7 규정에 의거하여 진행하였으며 시험항목인 정적 및 동적하중 시험을 모두 포함한다. 성능시험 하중조건은 DIN 규정에 따라 열차 및 궤도 중량을 고려하여 적용하였으며 수직 하중 및 수평 하중에 대한 시험을 진행하여 방진장치 적용에 따른 궤도의 구조안전성을 확보한다. 더불어, 하중재하속도에 따른 마찰재의 마찰계수 변화 양상을 확인함으로서 다양한 하중재하속도 조건에 대한 마찰쐐기형 방진장치의 진동저감 성능을 확인한다.

지반진동 규제기준에서 진동레벨과 진동속도의 상호관계에 대한 고찰 (Consideration on the Relation between Vibration Level and Peak Particle Velocity in Regulation of Ground Vibration)

  • 최병희;류창하
    • 화약ㆍ발파
    • /
    • 제30권2호
    • /
    • pp.1-8
    • /
    • 2012
  • 국내에서 발파풍과 지반진동을 취급하는 유일한 법규가 바로 환경부의 소음진동관리법이다. 하지만 이 법규는 생활소음과 생활진동을 주로 취급하고 있으므로 지반진동에 대한 안전기준을 dB(V) 단위의 진동레벨에 의해 규정하고 있다. 그러나 발파로 발생되는 지반진동은 충격진동에서 볼 수 있는 것과 같은 독특한 특성을 지니고 있으며, 그 지속시간도 기계류나 장비류, 시설물 등에서 발생하는 진동과 비교하여 매우 짧은 특성이 있다. 그러므로 발파작업에 대한 진동법규에서는 통상 구조물 손상에 대한 지반진동의 영향을 고려하여 안전기준을 최대입자속도(peak particle velocity; PPV)로 설정한다. 그럼에도 불구하고 진동파동의 주파수 스펙트럼에 대한 충분한 고려도 없이 PPV로부터 진동레벨(vibration level; VL)을 예측하거나 $m/kg^{1/2}$이나 $m/kg^{1/3}$ 단위의 환산거리에 따라 VL을 추정하려는 시도들이 있다. 이 시도들은 주로 발파공사 과정에서 소음진동관리법을 충족시키려는 목적으로 이루어지는 것으로 보인다. 그러나 원칙적으로 전체 주파수 스펙트럼 상에서는 속도나 가속도 피크치 사이에는 아무런 상관관계도 존재할 수 없다. 따라서 이러한 상관관계나 추정식의 유도작업은 반드시 동일하거나 매우 유사한 주파수 스펙트럼을 지니는 파동들에 한해서 수행되어야 한다.

Design of piezoelectric transducer arrays for passive and active modal control of thin plates

  • Zenz, Georg;Berger, Wolfgang;Gerstmayr, Johannes;Nader, Manfred;Krommer, Michael
    • Smart Structures and Systems
    • /
    • 제12권5호
    • /
    • pp.547-577
    • /
    • 2013
  • To suppress vibration and noise of mechanical structures piezoelectric ceramics play an increasing role as effective, simple and light-weighted damping devices as they are suitable for sensing and actuating. Out of the various piezoelectric damping methods this paper compares mode based active control strategies to passive shunt damping for thin plates. Therefore, a new approach for the optimal placement of the piezoelectric sensors/actuators, or more general transducers, is proposed after intense theoretical investigations based on the Kirchhoff kinematical hypotheses of plates; in particular, modal and nilpotent transducers are discussed in detail. Based on the proposed distribution a discrete design for modal transducers is implemented, tested and verified on an experimental setup. For active control the modal sensors clearly identify the eigenmodes, whereas the modal actuators impose distributed eigenstrains in order to reduce the transverse plate vibrations. In contrast to the modal control, passive shunt damping works without requiring additional actuators or auxiliary power and can therefore act as an autonomous system, but it is less effective compensating the flexible vibrations. Exemplarily, an acryl glass plate disturbed by an arbitrary force initialized by a loudspeaker is investigated. Comparing the different methods their specific advantages are highlighted and a significant broadband reduction of the vibrations of up to -20dB is obtained.

순환자원 활용 말뚝채움재의 실내모형시험을 통한 주면마찰력 비교 연구 (A Comparative Study of Skin Frictional Force through a Laboratory Model Test of Pile Filling Materials with Utilizing Circulating Resources)

  • 송상훤;정영순;서세관
    • 한국농촌건축학회논문집
    • /
    • 제23권3호
    • /
    • pp.1-8
    • /
    • 2021
  • Rural multi-purpose buildings needs to ensure their safety against various disasters. Therefore, a pile foundation, which is a foundation type that can transmit the load of the structure to the bedrock layer, has been designed. The pile foundation method is largely divided into driving piles method and pre-bored pile method. Recently, in order to respond to the Noise and Vibration Control Act and related environmental complaints, construction of pile foundation adopts pre-bored pile method. The bearing capacity of the pre-bored pile method is calculated through a load test in situ. However, a disadvantage stems in that it is difficult to measure the ultimate bearing capacity due to field conditions. Therefore, in this study, the skin frictional force of pre-bored pile was measured through a model test in laboratory for each pile filling material. In result, the pile filling material with using circulating resources shows superior skin frictional force than ordinary portland cement. This study also judged that the result can be applied in place of ordinary Portland cement in the field.

THE EFFICIENT ESTIMATE OF ENVIRONMENTAL MANAGEMENT COSTS IN THE CONSTRUCTION SITES

  • Hyuk Moon;Sung-Jin Kim;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.437-446
    • /
    • 2005
  • Recently as people's values are changing from development phase into running stage after quality of life, so that the needs of environmentally friendly construction are gradually increasing. Also populace discontent about the pollution during construction process such as the noise and vibration caused by construction machinery is increasing. Even though it is impossible to eliminate the construction pollution fully, it is necessary to make efforts to reduce construction pollution to a minimum. In terms of construction site operating, the first possible step for solving these matters directly is that the necessary sum of expenses must be secured as the environmental management costs in the conceptual phase. However, in fact, the environmental management costs have not been secured in the budget. Generally it is the major reason not arising proper activities to prevent the pollution in the construction site. The purpose of this research is to suggest the efficient budgeting method regarding Environmental management costs to ensure the necessary sum of environmental management expenses. To provide an efficient budgeting method, interviews with the person in charge of environment management was conducted. 78 construction sites was surveyed and environmental management costs were analyzed through their historical data from the survey. According to the results of analysis, the ratio of environmental management costs is revealed 0.45% of construction cost as average comparing 0.2% of legal limit. And usually the environmental management cost was appropriated into the safety management budget. So it is needed to isolate environmental management budget securely and modify the ratio of Environmental conservation Costs in Construction Technology Management Act.

  • PDF

ILO어선원노동협약과 어선법의 어선거주설비에 대한 고찰 (A study on the work in fishing convention, 2007 and the fishing vessel's accommodation facilities standards in national fishing vessel act)

  • 김욱성;박문갑
    • 수산해양기술연구
    • /
    • 제46권4호
    • /
    • pp.466-475
    • /
    • 2010
  • This study intends to present a direction for the better reforming of fishers'onboard living conditions and proposals for preparing for ratification of the Work in Fishing Convention by means of making a comparison between standards on recent national fishing vessel accommodation facilities and standards on the Work in Fishing Convention and Its Recommendation, 2007, ILO. For the most part of standards on national fishing vessel accommodation facilities are somewhat insufficient to satisfy the provisions in Annex III of the Convention. Considering by items on fishing vessel accommodation facilities, the standards on insect protector, noise and vibration, heating and air conditioning, lighting, persons per sleeping room, recreational facility are not provided in national law. Headroom, separation of accommodation, sleeping room floor area, mattress size, mess room, galley and food storage are partially sufficient for the Convention. In case of sanitary facilities, national standards are not sufficient for the Convention. The other side, facilities related safety of ship and crew such as emergency escape etc., are fully sufficient for the Convention. These insufficiencies caused by different types of fishing vessel depend on originality of fishing method and practices. In the comparison between equivalent tonnage about vessel's length on convention and calculated tonnage of national existing fishing vessel, the difference are 226tons about length 24m and 501tons about length 45m. For that reason, headroom, persons per sleeping room, cabin of sicker and injured, sanitary facilities may decide to use gross tonnage in place of length (L) and the alleviating measure basis of convention. But in case of standards on sanitary facilities which are unsufficient for the Convention, specially in coastal fishing vessel length basis should be adopted with alleviating basis for less than length 24m.

건설현장에서 발생하는 산화규소분진의 유해성 및 작업환경 개선대책에 관한 연구 (A Study on the Harmfulness of Silicon Oxide Dust and Measures for the Work Environment Improvement in Construction Sites)

  • 황정숙
    • 한국재난정보학회 논문집
    • /
    • 제18권3호
    • /
    • pp.478-486
    • /
    • 2022
  • 연구목적: 건설현장에서 작업환경측정을 하고 있으나 노출되고 있는 유해인자를 세분화하여 작업환경 측정을 하지 않고 공정별 대표적으로 노출되는 소음, 진동 등 몇 가지만 실시하고 있다. 이에 건설현장에서 가장 많이 노출되는 산화규소분진의 유해성과 현재 건설현장에서 하고있는 개선대책의 보완점을 찾고자 한다. 연구방법: 안전보건공단과 산업보건협회에서 발행하는 실태조사 보고서 및 작업환경측정 기관의 자료를 활용하여 현황을 분석하였고 산업안전보건법의 작업환경측정에 관한 규칙과 비교분석 하였다. 연구결과: 산화규소분진의 유해성을 파악하고 개선책을 보완도출하였다. 결론: 건설현장의 산화규소분진의 유해성을 도출하고 이에 따른 개선대책을 제시함으로써 현장에서 적극적으로 적용한다면 산화규소분진에 대한 직업병을 줄일 수 있을 것으로 기대된다.

TBM 굴진향상을 위한 연속굴착형 TBM 부품개조 및 제어기술 소개 (Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance)

  • 최영태;이동건;김문규;오주영;조정우
    • 터널과지하공간
    • /
    • 제32권6호
    • /
    • pp.345-352
    • /
    • 2022
  • 도심지 터널 건설에서 발파공법은 민원이 제기되는 문제점이 있어 적용에 제약받고 있다. 이에 대한 대안으로 TBM 및 기계굴착 공법 적용이 필수적으로 검토되고 있다. 이 중 쉴드 TBM(Tunnel Boring Machine)은 굴진과 세그먼트 체결이 번갈아 반복되며 굴진하는 공정을 가지고 있는데, 세그먼트 체결 동안 굴진을 멈추게 된다. 이러한 가동 정지시간을 최소화하고자 세그먼트 체결 중에도 가동할 수 있는 연속굴착형 TBM 기술이 개발되고 있다. 나선형 세그먼트의 굴진 반력을 확보하기 위해 추진잭을 개조하고 신뢰성을 확보하는 연구가 진행 중이다. 또한 체결 중 세그먼트를 제외한 나머지 부분의 추진잭을 가동하는 유압제어 및 유압시스템 설계기술이 개발될 예정이다. 본 보고는 연속굴착형 TBM 과제 중 부품개조 및 유압제어 기술에 대한 일부 내용을 소개한다.