Acknowledgement
본 연구는 2022년도 국토교통부(국토교통과학기술진흥원)의 'TBM 굴진향상을 위한 연속굴착 기술개발(RS-2022-00144188)' 사업을 통해 수행되었습니다.
References
- Choi, S.W., Lee, C.H., Kang, T.H., and Chang, S.H., 2020, Current Status of Technical Development for TBM Simulator, Tunnel and Underground Space, 30(5), 433-445. https://doi.org/10.7474/TUS.2020.30.5.433
- Jang, S.H., Kim, S.H., Lee, S.W., and Bae, G.J., 2010, Construction of Long Undersea Tunnel by Shield TBM, Magazine of Korean Tunnelling and Underground Space Association, 12(3), 9-22.
- Kim, Y.G., Moon, J.S., Shim, J.B., Lee, S.B., Choi, C.R., and Chun, Y.C., 2011, Comparative risk analysis of NATM and TBM for mixed-face large-diameter urban tunneling, Journal of Korean Tunnelling and Underground Space Association, 13(1), 19-32. https://doi.org/10.9711/KTAJ.2011.13.1.019
- Lee, H.S., Na, Y.M., Jang, H.S., Suk, I.H., Kang, S.H., Kim, H.T., and Park, J.K., 2019, A Study on the Stability of Shield TBM Thrust Jack in the Behavior of Operating Fluid According to Thrust Force, Journal of the Korean Society of Manufacturing Process Engineers, 18(1), 38-45. https://doi.org/10.14775/ksmpe.2019.18.1.038
- Lee, S.W., Jang, S.H., and Choe, S.U., 2011, Forecasting Future Demand for TBM Tunnels in Korea, Geotechnical Engineering, 27(2), 18-26.
- Park, J.S., 2021, Focusing on the comparison between Gripper TBM and Slurry Shield TBM, Magazine of Korean Tunnelling and Underground Space Association, 23(1), 44-60.
- Science & Technology Strategy Institute, 2021, Consecutive Excavation Technological Development Project of Tunnel Boring Machine,Ministry of Land, Infrastructure and Transport, 136-155.