While large-sized facilities (type I II) have been managed systematically after the establishment of the Special Law for Safety Management on Facility, the management of small-sized facilities is relatively poor. The small-sized facilities have been managed by The Basic Law for Disaster and Safety Management, however, it is hard to manage them systematically as related standards are not established. Therefore, this study proposed the management plans for including the facilities such as some road tunnels and utility tunnels, which have the definite manager and a high possibility to harm the public, into type I and II facilities. In addition, it proposed the reinforcement plans of safety management for small-sized and vulnerable facilities such as breast wall and cut slopes, traditional markets and pedestrian bridges, which are fundamental facilities closely related to people's life, although a budget and a man-power are not enough.
Journal of The Institute of Information and Telecommunication Facilities Engineering
/
v.4
no.2
/
pp.37-43
/
2005
A simple scheduler satisfying the proportional fairness (PF) was introduced in wireless access networks and revealed that it can achieve a good compromise between total throughput and user fairness. Though it has received much attention for some time, its application was mainly restricted to the single channel systems. In this paper, we study how to implement the PF scheduler in the multi-channel environments such as OFDMA/TDMA. Besides the traditional PF-SC scheme, we propose a new PF-OPT scheme that is the genuine PF scheduler in a sense of maximizing the total log-utility of users. The simulation results show that PF-OPT gives large throughput under the heterogeneous subchannel statistics.
The cogeneration facilities (COGN) into the power distribution system can cause operational problems - reenergization of distribution feeders under repair by utility personnel, voltage variation and regulation because of output power of COGN, and lost of coordination at emergency state - on an electrical utility system. This paper deals with momentary voltage dips as the parallel interconnection operation of COGN in the power distribution system. PSCAD/EMTDC simulation tool is used to show the behavior of momentary voltage dips. In addition, restraint solution for momentary voltage variation is presented.
For two decades and more, a lot of research work on the biological effects of EMF(Electromagnetic Fields) on Human hearth have been reported. Power-frequency magnetic fields are a natural consequence of the flow of electricity. This paper deals with the modeling of electric utility facilities taking into account the line geometries. The magnetic fields profiles obtained from the computer simulation arc compared to those from measurements.
Proceedings of the Korea Society for Energy Engineering kosee Conference
/
1999.11a
/
pp.119-124
/
1999
A selection methodology of liquid levelmeters, especially, level sensors in non-nuclear category, to be installed in nuclear energy facilities is developed using linguistic fuzzy approaches such as fully-linguistic and semi-linguistic methods. Depending on defuzzification techniques, the linguistic fuzzy methodology leads to either linguistic (exactly, fully-linguistic) or cardinal (i.e., semi-linguistic) evaluation. For the linguistic method, for each alternative, fuzzy preference index is converted to linguistic utility value by means of a similarity measure determining the degree of similarity between fuzzy index and linguistic ratings. For the cardinal method, the index is translated to cardinal overall utility value. According to these values, alternatives of interest are linguistically or numerically evaluated and a suitable alternative can be selected. Under given selection criteria, the suitable selections out of some liquid levelmeters for nuclear facilities are dealt with using the linguistic fuzzy methodology proposed. Then, linguistic fuzzy evaluation results are compared with qualitative result available in the literature. It is found that as to a suitable option the linguistic fuzzy selection is in agreement with the qualitative selection. Additionally, the comparative study shows that the fully-linguistic method using adequate scale system facilitates linguistic interpretation regarding evaluation results.
International conference on construction engineering and project management
/
2005.10a
/
pp.855-861
/
2005
Every public agency governing infrastructure has to plan effectively for rehabilitation of existing facilities within the constraints of the capital program. Numerous technical, social, political, financial, and management constraints govern the decision to rehabilitate a facility. However, without a systematic procedure for selecting facilities for rehabilitation, within the prevailing constraints, it is possible that the funds available for rehabilitation might be suboptimized. Therefore, a decision support system that assists the user in selecting facilities for rehabilitation while considering the technical, social, financial, and political and management constraints will be useful in the decision-making process. This paper compares the Analytical Hierarchy Process (AHP) with the Swing Weight method used to prioritize functional criteria for suburban station rehabilitation. This paper also contains a brief discussion about the relevance of the Multi Attribute utility theory in developing a decision model for the problem at hand. The results of this paper provides the user with a decision support system that would prioritize the stations in order of their weights obtained by a systematic evaluation of various criteria and sub-criteria involved in the decision making process
This investigation aims to provide basic data for rural village planning and rehabilitation planning. Public infrastructures of forty selected villages have been surveyed. Provision of facilities, user satisfaction, perceived problems, and conditions of maintenance have been surveyed for three classified types of infrastructures; 1) public utility spaces such as community hall, and parking lots, 2) public production infrastructures such as warehouses, and irrigation facilities, and 3) public infrastructures for living environments such as roads, water supply, and sewage system. All twenty smaller villages (ki-cho-ma-ul) had problems of poor conditions and insufficient spaces with community halls. Most of the smaller villages suffered from lack of public production infrastructures, or had problems of insufficient spaces and poor maintenance conditions. They also lacked good access roads with adequate right of ways. Only three villages were provided with sewage systems. In the twenty larger villages (myun-bo-ma-ul), though public utility spaces were provided for most of them (as an example, sixteen villages had welfare centers), they were not large enough and they were maintained in poor condition too. On the one hand twelve of the larger villages had farm machine service centers, only a few villages were equipped with warehouses. Many more public infrastructures for living environments were found in larger villages. However, only a few villages had pollution control facilities. Multidimensional scaling revealed groups of distinctive characteristics, in terms of public infrastructures, among smaller villages. It did not show any noticeable distinctions among larger villages.
Journal of Korean Tunnelling and Underground Space Association
/
v.20
no.2
/
pp.317-329
/
2018
The study on the existing multi-utility tunnel has examined the general aspects related to the installation of multi-utility tunnel rather than the optimal design and feasibility analysis of accommodation facility in multi-utility tunnel. In the basic planning stage related to the introduction of multi-utility tunnel, it is difficult to determine accommodation facility due to lack of relevant indicators and data. In this paper, VE/LCC analysis method is suggested for the optimal alternative decision of accommodation facilities in multi-utility tunnel. The analysis of the items of individual accommodation facility and the value index for LCC costs were applied to the kind alternatives, and the priorities of each kind were analyzed. In addition, the domestic multi-utility tunnel and analysis result are compared. The result of this study will be helpful to shorten the time and convenience of the user in the process of determining accommodation facility including the first designers when introducing multi-utility tunnel.
Recently reclamation land is largely developed to utilize the land according to economic growth. The soil of landfill is soft, low shear strength, which makes it difficult to use the equipment. A large movement is occurred on the utility tunnel under construction. The inclined land with high water level and underground facilities are widely distributed and the excess pore water pressure may occur under construction similarly to this study. Some different conditions are made to design result, such as 4m of soil piling near the construction area, heavy rainfall during 2nd excavation that may cause flow liquefaction. To analyze the cause of transverse lateral movement, Three dimensional analysis are performed to four load cases, which is original design condition, flow liquefaction by heavy rainfall, unsymmetric lateral soil pressure, and both of them simultaneously. Ten steps of full construction stage, 1st excavation for utility tunnel, construction of utility tunnel, 1st refill, piling soil from 1m to 4 m, 2nd excavation for drainage culvert, liquefaction around the utility tunnel, construction of drainage culvert and 2nd refill, are take into account to investigate the cause of movement.
The small-scaled onsite generators such as photovoltaic power, wind power, biomass and fuel cell belong to decarbonization techniques. In general, these generators tend to be connected to utility systems, and they are called distributed generations (DGs) compared with conventional centralized power plants. However, DGs may impact on stabilization of utility systems, which gets utility into trouble. In order to reduce utility's burdens (e.g., investment for facilities reinforcement) and accelerate DG introduction, the advanced operation algorithms under the existing utility systems are urgently needed. This paper presents the advanced voltage regulation method in power systems since the sending voltage of voltage regulators has been played a decisive role restricting maximum installable DG capacity (MaxC_DG). For the proposed voltage regulation method, the difference from existing voltage regulation method is explained and the detailed concept is introduced in this paper. MaxC_DG estimation through case studies based on Korean model network verifies the superiority of the proposed method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.