• Title/Summary/Keyword: Urban disaster prevention

Search Result 285, Processing Time 0.032 seconds

Case Study on the Hazard Susceptibility Prediction of Debris Flows using Surface Water Concentration Analysis and the Distinct Element Method (수계 집중도 분석 및 개별요소법을 이용한 토석류 위험도 예측 사례 연구)

  • Lee, Jong-Hyun;Kim, Seung-Hyun;Ryu, Sang-Hoon;Koo, Ho-Bon;Kim, Sung-Wook
    • The Journal of Engineering Geology
    • /
    • v.22 no.3
    • /
    • pp.283-291
    • /
    • 2012
  • Various studies regarding the prediction of landslides are underway internationally. Research into disaster prevention with regard to debris flows is a particular focus of research because this type of landslide can cause enormous damage over a short period. The objective of this study is to determine the hazard susceptibility of debris flow via predictions of surface water concentrations based on the concept that a debris flow is similar to a surface water flow, as it is influenced by mountain topography. This study considered urban areas affected by large debris flows or landslides. Digital mapping (including the slope and upslope contributing areas) and the wetness index were used to determine the relevant topographic factors and the hydrology of the area. We determined the hazard susceptibility of debris flow by predicting the surface water concentration based on the topography of the surrounding mountainous terrain. Results obtained using the distinct element method were used to derive a correlation equation between the weight and the impact force of the debris flow. We consider that in using a correlation equation, this method could assist in the effective installation of debris-flow-prevention structures.

An Experimental Study on Ground Reinforcement Effect of Concrete and Expansion Mat for Prevention of Buried Pipe Damage (지중매설관 손상 방지를 위한 콘크리트매트와 팽창매트의 지반보강효과에 관한 실험적 연구)

  • Park, Jeong-Jun;Shin, Heesoo;Yuu, Jungjo;Hong, Gigwon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.18 no.1
    • /
    • pp.91-101
    • /
    • 2019
  • Recently, small-scale excavation like ground cavity restoration and buried pipe replacement works are being carried out in urban area, in order to improve living convenience. This paper describes experiment results on the ground reinforcement method that can reduce the buried pipe damage, when the differential settlement occurred due to poor compaction of ground below the buried pipe. Plate load tests were conducted to evaluate a reinforcement effect of ground using concrete mat and expansion mat in the ground below the buried pipe. The results showed that the stress reduction ratio by concrete mat and expansion mat according to the surcharge load was about 46%~48% and 39%~42%, respectively. Therefore, the differential settlement of the buried pipe and the ground deformation below the buried pipes were reduced by the reinforcement effect of the concrete mat and expansion mat. This means that it is possible to prevent a buried pipe damage due to underground cavity and ground subsidence, if concrete mat and expansion mat are reinforced in the ground below the buried pipe or on the ground between the buried pipes.

A Study of a Correlation Between Groundwater Level and Precipitation Using Statistical Time Series Analysis by Land Cover Types in Urban Areas (시계열 분석법을 이용한 도시지역 토지피복형태에 따른 지하수위와 강수량의 상관관계 분석)

  • Heo, Junyong;Kim, Taeyong;Park, Hyemin;Ha, Taejung;Kang, Hyungbin;Yang, Minjune
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.6_2
    • /
    • pp.1819-1827
    • /
    • 2021
  • Land-use/cover change caused by rapid urbanization in South Korea is one of the concerns in flood risk management because groundwater recharge by precipitation hardly occurs due to an increase in impermeable surfaces in urban areas. This study investigated the hydrologic effects of land-use/cover on groundwater recharge in the Yeonje-gu district of Busan, South Korea. A statistical time series analysis was conducted with temporal variations of precipitation and groundwater level to estimate lag-time based on correlation coefficients calculated from auto-correlation function (ACF), cross-correlation function (CCF), and moving average (MA) at five sites. Landform and land-use/cover within 250 m radius of the monitoring wells(GW01, GW02, GW03, GW04, and GW05) at five sites were identified by land cover and digital map using Arc-GIS software. Long lag-times (CCF: 42-71 days and MA: 148-161 days) were calculated at the sites covered by mainly impermeable surfaces(GW01, GW03, and GW05) while short lag-times(CCF: 4 days and MA: 67 days) were calculated at GW04 consisting of mainly permeable surfaces. The results suggest that lag-time would be one of the good indicators to evaluate the effects of land-use/cover on estimating groundwater recharge. The results of this study also provide guidance on the application of statistical time series analysis to environmentally important issues on creating an urban green space for natural groundwater recharge from precipitation in the city and developing a management plan for hydrological disaster prevention.

A Study on Determination of Capacity for Pump and Detention Pond in Small Basins for Flood Control (소유역에서 홍수조절용 펌프 및 유수지 규모의 결정에 관한 연구)

  • Ahn, Tae-Jin;Park, Jong-Yoon;Lyu, Heui-Jeong;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.3 s.134
    • /
    • pp.385-398
    • /
    • 2003
  • The concept of the effective storage ratio has been suggested to determine the size of detention pond by the previous researchers. The 11 pump - pond facilities in Dongdu-chun city were selected to analyze the critical duration for design rainfall and the storage ratio for each rainfall duration in this study It has been then found that the criteria of the maximum storage ratio is not reasonable for determining the size of detention pond because the difference of storage ratio with respect to each rainfall duration is too small. Moreover, since the size of pond compared with the pump capacity is not always big enough, the pump should be frequently operated, which may result in pump failure. Thus, the pond should be sufficiently sized to prevent the possibility of the pump failure due to frequent operation. According to the analyses for changing pump capacity, it has been found that if the function of the pond compared with the pump is concentrated, determining the size of pond based on the storage ratio is operationally feasible for even small basin. Thus, an improved procedure based on the storage ratio for determining the size of detention pond in small basin has been suggested. The results by the proposed procedure considering pump switching frequency may lead to reasonable pump operation. A simple linear programming model has been also adopted to figure out the relationship between pump capacity and pond size. It has been shown that the determination lot the size of detention pond based on conventional hydrologic flood routing in pond is feasible for only urban districts not rural areas.

Development and Assessment of Flow Nomograph for the Real-time Flood Forecasting in Cheonggye Stream (청계천 실시간 홍수예보를 위한 Flow Nomograph 개발 및 평가)

  • Bae, Deg-Hyo;Shim, Jae Bum;Yoon, Seong-Sim
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.11
    • /
    • pp.1107-1119
    • /
    • 2012
  • The objectives of this study are to develop the flow nomograph for real-time flood forecasting and to assess its applicability in restored Cheonggye stream. The Cheonggye stream basin has the high impermeability and short concentration time and complicated hydrological characteristics. Therefore, the flood prediction method using runoff model is ineffective due to the limit of forecast. Flow nomograph which is able to forecast flood only with rainfall information. To set the forecast criteria of flow nomograph at selected flood forecast points and calculated criterion flood water level for each point, and in order to reflect various flood events set up simulated rainfall scenario and calculated rainfall intensity and rainfall duration time for each condition of rainfall. Besides, using a rating curve, determined scope of flood discharge following criterion flood water level and using SWMM model calculated flood discharge for each forecasting point. Using rainfall information following rainfall scenario calculated above and flood discharge following criterion flood water level developed flow nomograph and evaluated it by applying it to real flood event. As a result of performing this study, the applicability of flow nomograph to the basin of Cheonggye stream appeared to be high. In the future, it is reckoned to have high applicability as a method of prediction of flood of urban stream basin like Cheonggye stream.

Comparison of IUHs obtained by the Derived and Simple Equation of GIUH on Third and Fourth-Order Streams (3, 4차 하천에서의 GIUH 유도식과 간략식에 의해 산정된 순간단위도의 비교연구)

  • Joo, Jin-Gul;Ham, Dae-Heon;Jun, Hwan-Don;Lee, Jung-Ho;Kim, Joong-Hoon
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.11
    • /
    • pp.1107-1121
    • /
    • 2008
  • The simple equation of GIUH are frequently used in many researches instead of the derived equation of GIUH. However it is still unknown whether the simple equation of GIUH is adaptable for estimating IUHs for basins with various geomorphologic conditions. To verify the applicability of the simple equation of GIUH, in this research, four basins which were Bangrim, Sanganmi, Museong, and Byeongcheon were selected and each basin was assumed as the third and fourth stream order basin according to variable resolutions. After than, IUHs were estimated using the derived and simple equations of GIUH. Eight to sixteen hydrographs were estimated from the each IUH, compared with observed graphs. In case of that the basin is assumed as a third order stream, the derived equation underestimated the peak flows while the simple equation overestimated them. When the basin is assumed as a fourth order stream, the simple equation generally overestimated the peak flows whereas the derived equation produced peak flows good agreement with the observed peak flow. Moreover, the simple equation showed various deviations in accuracy whereas the derived equation produced stable results. Based on the fact found from this research, it can be concluded that the derived equation of GIUH brings better results than the simple equation of GIUH to estimate IUHs for ungauged basins.

Mapping Inundation Areas Using SWMM (SWMM을 이용한 침수예상지도 작성 연구)

  • Don Gon, Choi;Jinmu, Choi
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.33 no.5
    • /
    • pp.335-342
    • /
    • 2015
  • In this study, data linking module called GeoSWMM was developed using a typical secondary flooding model SWMM in order to improve the accuracy of the input data of SWMM and to map hourly inundation estimation areas that were not represented in the conventional inundation map. GeoSWMM is a data linking module of GIS and SWMM, which can generate a SWMM project file directly from sewer network GIS data. Utilizing the GeoSWMM the project file of SWMM model was constructed in the study area, Seocho 2-dong, Seoul. The actual flooding has occurred September 21, 2010 and the actual rainfall data were used for flood simulation. As a result, the outflow started from 2 PM due to the lack of water flow capacity of the sewage system. Based on the results, hourly inundation estimation maps were produced and compared with flood train map in 2010. The comparison showed about 66% matching in the overlap of inundation areas. By utilizing GeoSWMM that was developed in this study, it is easy to build the sewer network data for SWMM. In addition, the creation of hourly inundation estimation map using SWMM will be much help to flood disaster prevention plan.

Mapping Technique for Flood Vulnerable Area Using Surface Runoff Mechanism (지표유출메커니즘을 활용한 홍수취약지구 표출 기법)

  • LEE, Jae-Yeong;HAN, Kun-Yeun;KIM, Hyun-Il
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.4
    • /
    • pp.181-196
    • /
    • 2019
  • Floods can be caused by a variety of factors, and the main cause of floods is the exceeding of urban drainage system or river capacity. In addition, rainfall frequently occurs that causes large watershed runoff. Since the existing methodology of preparing for flood risk map is based on hydraulic and hydrological modeling, it is difficult to analyse for a large area because it takes a long time due to the extensive data collection and complex analysis process. In order to overcome this problem, this study proposes a methodology of mapping for flood vulnerable area that considered the surface runoff mechanism. This makes it possible to reduce the time and effort required to estimate flood vulnerabilities and enable detailed analysis of large areas. The target area is Seoul, and it was confirmed that flood damage is likely to occur near selected vulnerable areas by verifying using 2×2 confusion matrix and ROC curve. By selecting and prioritizing flood vulnerable areas through the surface runoff mechanism proposed in this study, the establishment of systematic disaster prevention measures and efficient budget allocation will be possible.

Evaluation of the change in Geotechnical properties due to the Construction of Civil engineering Structure using HWAW Method (HWAW방법을 이용한 토목구조물 건설에 따른 하부 지반 물성 변화 평가)

  • Park, Hyung-Choon;Noh, Hee-Kwan;Park, Byeong-Cheol;Kim, Min-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.182-187
    • /
    • 2010
  • In the various fields of Civil Engineering, shear modulus is very important input parameters to design many constructions and to analyze ground behaviors. In general, a shear wave velocity profile is decided by various experiments before constructing a structure and, analysis and design are carried out by using decided shear wave velocity profile of the site. However, if civil structures are started to construct, the shear wave velocity will be increased more than before constructions because of confining pressure increase by the load of structure. The evaluation of the change in shear wave velocity profile is used very importantly when maintaining, managing, reinforcing and regenerating existing structures. In this study, a non-destructively geotechnical investigation method by using the HWAW method is applied to an evaluation of change in properties of the site according to construction. Generally, the space for experiments is narrow when underground of existing or on-going structures is evaluate, so a prompt non-destructive experiment is required. This prompt non-destructive experiment would be performed by various in-situ seismic methods. However, most of in-situ seismic methods need more space for experiments, so it is difficult to be applied. The HWAW method using the Harmonic wavelet transforms, which is based on time-frequency analysis, determines shear wave velocity profile. It consists of a source as well as short receiver spacing that is 1~3m, and is able to determine a shear wave velocity profile from surface to deep depth by one test on a space. As the HWAW method uses only the signal portion of the maximum local signal/noise ratio to determine a profile, it provides reliability shear modulus profile such as under construction or noisy situation by minimizing effects of noise from diverse vibration on a construction site or urban area. To estimate the applicability of the proposed method, field tests were performed in the change of geotechnical properties according to constructing a minimized modeling bent. Through this study, the change of geotechnical properties of the site was effectively evaluated according to construction of a structure.

  • PDF

The study on application of automatic monitor system for initial fire suppression in double-deck tunnel (대심도 복층터널 초기화재 진압을 위한 자동모니터 소화설비의 적용성 연구)

  • Yoo, Yong-Ho;Park, Sang-Heon;Han, Sang-Ju;Park, Jin-Ouk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.419-429
    • /
    • 2016
  • In a bid to avoid the economic loss resulting from traffic jam in urban area, a deep underground road at 40 m depth has been considered and the first class disaster prevention facilities shall be applied according to domestic guideline. Automatic-monitoring fire extinguishing system designed to use for fire fighting has been widely applied at home and abroad. Recently development and commercialization through theoretical and experimental research to apply to road/railroad sector have been underway. Based on such performance of automatic fire extinguishing system, technical/economic analysis of existing water spray systems was conducted and as a result, it has demonstrated the superiority in terms of fire suppression as well as in cost efficiency. Then to commercialize this system, more diverse studies that will incorporate the characteristics of domestic tunnels are needed and should the system be promoted through institutional improvement, it's expected to become one of the advanced nations with own original technology in a life safety system industry throughout the world.