• Title/Summary/Keyword: Up-down construction

Search Result 172, Processing Time 0.023 seconds

Analysis of the Amount of Construction and Demolition Waste Generated by Underground Vertical Extension Methods (지하수직증축공법 적용에 따른 건설폐기물 발생량 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.273-274
    • /
    • 2021
  • This paper proposes a process to calculate the amount of construction and demolition (C&D) of underground vertical extension methods through considering the characteristics of used construction and demolished materials. The underground vertical extension methods analyzed in this paper were the bottom-up, normal top-down, and top-down methods with multi-post downward (MPD). In order to check the applicability of the proposed process, 24 illustrative examples were generated. The amount of C&D waste of the illustrative examples were calculated and compared. As the results, the top-down method with MPD was the most efficient method to reduce the amount of C&D waste.

  • PDF

Development of Up-Down Turnout System of AGT for Reduction of Construction costs (건설비 절감을 위한 고무차륜 경량전철 상하식분기기 개발)

  • Cha, Kwon-Jung;Yoon, Il-Ro;Kim, Dong-Howal;Fukumoto, Yozo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.745-752
    • /
    • 2011
  • Light Rail Vehicle(LRT) is "New Transit System" that has transportation capacity as well as physical size of vehicle is in-between bus and subway. The demand of LRT system is increasing rapidly; both domestically and internationally. Reason being is that it is more economical and eco-friendly compare to existing heavy rail vehicle. Especially, Busan Subway Line 4 K-AGT (Rubber-tired LRT) being the first of its kind to start revenue service in Korea, it is very much likely that application of its demand will continue to increase. Considering its trend, study to reduce implementation cost of LRT is being pursued in many different aspects; reducing construction cost is one that aspect. In this study, on-site application of 'Up-Down Turnout System' implementation research has been carried out which can replace existing 'Left-Right Turnout System'. When safety of its type gets verified, application of this system to line which intends to use K-AGT, Shin-Lim Line and Dong-Book Line, expects to save its construction cost. This thesis paper reports ongoing research of AGT 'Up-Down Turnout System' development and main component design factors, fundamental principle, performance test result.

  • PDF

Evaluation of Field Application of Precast Concrete-panel Retaining Wall attached to In-Situ Ground Using Field Test and Numerical Analysis (현장시험 및 수치해석 분석을 통한 원지반 부착식 판넬옹벽의 현장 적용성 평가)

  • Kwon, Yong Kyu;Min, Kyoung-nam;Hwang, Young-cheol;Ban, Hoki;Lee, Minjae
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.12
    • /
    • pp.99-106
    • /
    • 2020
  • Man-made slope is inevitable to make a new road, which may result in environmental problems as well as collapse of slope. To prevent these problems, various methods such as geogrid reinforced retaining wall, precast concrete-panel retaining wall, and so on, have been introduced and developed. Among these methods, this paper presents the evaluation of field application of precast concrete-panel retaining wall attached to in-situ ground (so called top-down) compared to the conventional construction method of precast concrete-panel retaining wall (so called bottom-up) through the field test and numerical analysis. As a result, the safety factor of both methods in final stage is similar, however, top-down method guarantees the slope stability during the construction compared to bottom-up method.

A Top-down based Control Tree Construction Mechanism for Reliable Multicast Transport Protocols (신뢰적인 멀티캐스트 전송 프로토콜을 위한 Top-Down 기반의 제어 트리 구축 방안)

  • Kim, Eun-Sook;Koh, Seok-Joo;Kang, Shin-Gak;Choe, Jong-Won
    • Journal of KIISE:Information Networking
    • /
    • v.28 no.4
    • /
    • pp.611-620
    • /
    • 2001
  • To meet the requirements of reliable service for various applications, a Reliable Multicast Transport Protocol should be implemented over IP Multicast where currently best-effort service is provided. Among the current researches, hierarchical tree-based mechanism has been proposed and actively studied. This mechanism is known to provide high scalability as well as reliability, but needs an additional tree configuring mechanism for building an efficient logical tree in transport layer. Bottom-up approach has been used for creating such a tree. This method has benefits from parallel tree construction for receivers, while it has some drawbacks such that it does not guarantee a loop-free tree and brings heavy message overhead during tree creation process. Therefore, this paper proposes a top-down based mechanism for constructing a control tree, which can guarantee loop-freeness by step-wise mannered tree building. From experimental simulations, it shows that the proposed mechanism has less message overhead. It is recommended that the bottom-up and the proposed top-down will be selectively used in real networks, according to the requirements of the concerned multicast applications.

  • PDF

A Study on the Grouting Characteristics of Top-down Multi-step Pressure Grouting Method (하향식 다단 압력 그라우팅 방법의 주입특성에 대한 연구)

  • Lee, Hongsung;Lee, Seungho
    • The Journal of Engineering Geology
    • /
    • v.29 no.3
    • /
    • pp.201-209
    • /
    • 2019
  • Bottom-up multi-stage pressure grouting is widely applied to domestic slopes and tunnels. It involves injecting earth from the ground to the surface after drilling. Various reports of construction performance have demonstrated its wide applicability. However, little research has studied top-down multi-step pressure grouting in Korea, which involves injection from the surface. This paper compares the grouting effect of both the established bottom-up method and the top-down method in soil box and field tests. The soil box test showed that the bulb volume of the top-down method is ~24% less than that of the bottom-up method. The field test confirmed that the top-down method has a wider grouting range and a higher injection density per area than the bottom-up method.

The Experimental Study on Deflation of Air for Top-Down Joint area (역타기둥 이음부의 공기포 배출을 위한 실험적 연구)

  • 임형일;이동하;백민수;박병근;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.763-768
    • /
    • 2001
  • The purpose of this study is to research a specific material characteristics of top down concrete at column joint and to reduce column joint opening. Based on the established top down study, the experiment to apply an real construction case is performed. When the concrete placed into joint of top down column, raised air bubble is left as opening. This study is examined the incomplete packing reason in the top down column and found to air deflation method. The result of study is below (1) As the method to minimize column opening caused from confined air, it is required that an air exhaust port installation in joint column. (2) From air exhaust port installation, most of air bubble in column part is exhausted. As the concrete placing height is going up, air bubble size is going smaller.

  • PDF

Stress-transfer in concrete encased and filled tube square columns employed in top-down construction

  • Kim, Sun-Hee;Yom, Kyong-Soo;Choi, Sung-Mo
    • Steel and Composite Structures
    • /
    • v.22 no.1
    • /
    • pp.63-77
    • /
    • 2016
  • Top-down construction is a construction technique in which pit excavation and structure construction are conducted simultaneously. Reducing construction time and minimizing noise and vibration which affect neighboring structures, the technique is widely employed in constructing downtown structures. While H-steel columns have been commonly used as core columns, concrete filled steel tube (CFT) columns are at the center of attention because the latter have less axial directionality and greater cross-sectional efficiency than the former. When compared with circular CFT columns, square CFT columns are more easily connected to the floor structure and the area of percussion rotary drilling (PRD) is smaller. For this reason, square CFT columns are used as core columns of concrete encased and filled square (CET) columns in underground floors. However, studies on the structural behavior and concrete stress transfer of CET columns have not been conducted. Since concrete is cast according to construction sequence, checking the stress of concrete inside the core columns and the stress of covering concrete is essential. This paper presents the results of structural tests and analyses conducted to evaluate the usability and safety of CET columns in top-down construction where CFT columns are used as core columns. Parameters in the tests are loading condition, concrete strength and covering depth. The compressive load capacity and failure behavior of specimens are evaluated. In addition, 2 cases of field application of CET columns in underground floors are analyzed.

An Agent-Based Framework for Investigating Safety-Productivity Tradeoff of Construction Laborers Considering Risk-taking Behavioral Heterogeneity

  • Khodabandelu, Ali;Park, JeeWoong;Kheyrandish, Seyedmohsen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1114-1121
    • /
    • 2022
  • Construction laborers and crews play a critical role in achieving a safe and productive construction site. Many past research studies used top-down approaches/perspectives for studying the impact of laborers' performance on overall construction site outputs with limited flexibility in accounting for laborers' various characteristics. However, the recent reap in computational advances allowed applications of bottom-up architectures, which can potentially incorporate heterogeneous characteristics of laborers' individual behavioral and decision-making features effectively. Accordingly, agent-based modeling (ABM), as a tool to leverage a bottom-up methodological approach, has been widely adopted by recent research. Existing literature investigated the influence of changes in laborers' behaviors and interactions on either construction sites' safety performance or productivity performance individually, leaving the tradeoff between safety and productivity in this context relatively unexplored. Accordingly, this study aims to develop an agent-based framework to study the tradeoff between project safety and productivity performances resulting from changes in laborers' behaviors after attending safety trainings. Our findings via simulations indicate that proper safety trainings can improve safety performance without negatively impacting productivity performance.

  • PDF

A Study of Optimal Fuel-Mix Considering Power Generation Operation (발전기 출력특성을 고려한 최적전원구성 연구)

  • Jung, Young-Beom;Kim, Kil-Sin;Park, Chang-Ho;Yoon, Yong-Beom
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.10
    • /
    • pp.28-37
    • /
    • 2011
  • Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and $CO_2$ emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.

Evaluation of Drainage Capacity of Precast Concrete-panel Retaining Wall Attached to In-situ Ground Using Numerical Analysis (수치해석을 이용한 원지반 부착식 판넬옹벽의 투수성 평가)

  • Kwon, Youg Kyu;Lee, Jae Won;Hwang, Young-cheol;Ban, Hoki;Lee, Minjae
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.3
    • /
    • pp.43-50
    • /
    • 2021
  • On the construction of new roads, the cut slope is inevitable and thus has been widely applied in the mountainous area. Particularly, the retaining wall with the precast concrete panel is often selected for its higher stability and mostly constructed in bottom-up method. However, the bottom-up method results in steeper slope as 1:0.05 before constructiong retaining wall and thus causes poor compaction at backfill which may induce instability during or after the construction. To overcome this problem, precast concrete panel retaining wall was attached in-situ ground (so called top-down). This paper presents the evaluation of drainage capacity of top-down method which has impermeable layer between panel and mortar being used to increase the ability of attachment of the precast concrete panel.