• Title/Summary/Keyword: Unloading time

Search Result 205, Processing Time 0.032 seconds

A Study On Optimized Design of Decision Support Systems for Container Terminal Operations (컨테이너 터미널 운영을 위한 의사결정시스템 설계의 최적화에 관한 연구)

  • Hong, Dong-Hee;Chung, Tae-Choong
    • The KIPS Transactions:PartA
    • /
    • v.10A no.5
    • /
    • pp.519-528
    • /
    • 2003
  • Container terminals need decisions in the course of daily-24 hour and 365 day - operations, and all these decisions are inter-related. The ultimate goal of Decision Support System is to minimize ship loading/unloading time, resources used to handle the workload, and congestion on the roads inside the terminal. It is also to make the best possible use of the storage space available. Therefore, the necessity of decision support tools are emphasized to enhance the operational efficiency of container shipping terminals more, because of limits and complexity of these decisions. So, in thia paper, we draw evaluation items for Decision Support Systems and suggest optimization strategy of evaluation items which have the greatest influence on Decision Support system, that is, yard stacking allocation, RTGC deployment among blocks, and YT allocation to QCs. We also estimate the efficiency of Decision Support System design by simulation using G2 language, comparing ship loading/unloading time.

Computation of the Shortest Distance of Container Yard Tractor for Multi-Cycle System (다중 사이클 시스템을 위한 실시간 위치 기반 컨테이너 야드 트랙터 최단거리 계산)

  • Kim, Han-Soo;Park, Man-Gon
    • Journal of Korea Multimedia Society
    • /
    • v.13 no.1
    • /
    • pp.17-29
    • /
    • 2010
  • A container terminal productivity is maximized by a minimized time for processing containers. So, we have been elevated the container terminal productivity through an improvement of computing system, but there are a limitation because of problems for transportation management and method. A Y/T(Yard Tractor), which is a representative transportation, is able to do only one process, loading or unloading, at one time. So if the Y/T can do loading and unloading step by step at a same time, the processing time would be shortened. In this paper, we proposed an effective operating process of Y/T(Yard Tractor) Multi-Cycle System by applying RTLS(Real Time Location System) to Y/T(Yard Tractor) in order to improve the process of loading and unloading at the container terminal. For this, we described Multi-Cycle System. This system consists of a real time location of Y/T based on RTLS, an indicating of Y/T location in real time with GIS technology, and an algorithm(Dijkstra's algorithm) of the shortest distance. And we used the system in container terminal process and could improve the container terminal productivity. As the result of simulation for the proposed system in this paper, we could verify that 9% of driving distance was reduced compared with the existing rate and 19% of driving distance was reduced compared with the maximum rate. Consequently, we could find out the container performance is maximized.

Crane Scheduling Considering Tenant Service Time in a Rail-Road Transshipment Yard : Case of the Uiwang ICD (철도-육상트럭 환적지에서의 입주사 작업시간을 고려한 크레인 적하작업 스케줄링 : 의왕ICD 사례)

  • Kim, Kwang-Tae;Kim, Hyo-Jeong;Son, Dong-Hoon;Jang, Jin-Myeong;Kim, Hwa-Joong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.238-247
    • /
    • 2018
  • This paper considers the problem of scheduling loading and unloading operations of a crane in a railway terminal motivated from rail-road container transshipment operations at Uiwang Inland Container Depot (ICD). Unlike previous studies only considering the total handling time of containers, this paper considers a bi-criteria objective of minimizing the weighted sum of the total handling time and tenant service time. The tenant service time is an important criterion in terms of terminal tenants who are private logistics companies in charge of moving containers from/to the terminal using their trucks. In the rail-road container shipment yard, the tenant service time of a tenant can be defined by a time difference between beginning and finishing loading and unloading operations of a crane. Thus, finding a set of sequences and time of the crane operations becomes a crucial decision issue in the problem. The problem is formulated as a nonlinear program which is improved by linearizing a nonlinear constraint in the model. This paper develops a genetic algorithm to solve the problem and performs a case study on the Uiwang ICD terminal. Computational experiment results show that the genetic algorithm shows better performance than commercial optimization solvers. Operational implications in terms of tenants are drawn through sensitivity analyses.

Motion Analysis of Scissors Type Bucket and Schemes for Improving Ore Scooping Performance (가위형버킷의 운동해석 및 원료 불출능력 향상 방안)

  • Park, Sang-Deok;Kang, Min-Sung;Won, Dae-Heui;Kim, Tae-Ju
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.28 no.12
    • /
    • pp.1886-1896
    • /
    • 2004
  • Various types of buckets are used as unloading facilities for raw material at unloading wharfs. Scissors type buckets, among them, has been being used widely because of their short cycle time and structural simplicity. However, the scooping capacity, especially for hardened remainder ore, of some buckets are unsatisfactory because of poor design concept of the buckets. In this study, the effects of the design parameters on the scooping performance of the buckets are investigated under kinematic and dynamic analysis. Further, the schemes and design guidelines for designing new scissors type buckets are also presented to improve ore scooping capacity for hardened remainder ore.

Planning A Customer Transportation System Operation using Simulation (시뮬레이션을 이용한 고객 수송 시스템 운영 방안 수립)

  • Lee, Y.J.;Kong, M.C.;Yoon, S.Y.;Jeon, T.B.
    • Journal of Industrial Technology
    • /
    • v.37 no.1
    • /
    • pp.5-11
    • /
    • 2017
  • The purpose of this research is to propose an efficient loop line operation plan for customer transportation in a new theme park. Based on the expected customer arrivals, customer loading/unloading methods, and scheduled/non-scheduled departure schemes, movement time between stations etc., we have performed indepth analyses and derived the best optimal policy. Our results show that, over all, the operation with separate loading/unloading doors and scheduled departure is preferred to the other options. We then derived the optimal number of trains and cars meeting minimal customer unsatisfaction with low cost for each season.

Finite-element modeling and analysis of time-dependent thermomechanical distortion of optical sheets in a LCD module

  • Lee, Jae-Won;Hwang, Hak-Mo;Chung, In-Jae
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.1436-1441
    • /
    • 2006
  • Each type of optical sheets in a LCD module experiences a characteristic behavior for thermal loading and unloading. During thermal cycling, a polymeric behavior is reversible and recyclable, depending on a material stiffness critically affected by temperature and time. Some critical issues on temperature- and time-dependent themomechanical deformation of the polymeric sheet are addressed by finite-element thermal results, followed by structural simulation results in this study.

  • PDF

Significance of Ground Water Movements in the Numerical Modelling of Tunnelling (터널해석에 있어 지하수 거동의 중요성)

  • 신종호
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.257-264
    • /
    • 2003
  • Tunnelling in water bearing soils influences the ground water regime. It has been indicated in the literature that the existence of ground water above a tunnel influences tunnel stability and the settlement profile. Only limited research, however, has been done on ground water movements around tunnels and their influence on tunnel performance. Time dependent soil behaviour can be caused by the changes of pore water pressure and/or the viscous properties of soil(creep) under the stress change resulting from the advance of the tunnel face. De Moor(1989) demonstrated that the time dependent deformations due to tunnelling are mainly the results of pore pressure dissipation and should be interpreted in terms of effective stress changes. Drainage into tunnels is governed by the permeability of the soil, the length of the drainage path and the hydraulic boundary conditions. The potential effect of lime dependent settlement in a shallow tunnel is likely to occur rapidly due to the short drainage path and possibly high coefficient of consolidation. Existing 2D modelling methods are not applicable to these tunnelling problems, as it is difficult to define empirical parameters. In this paper the time-based 2D modelling method is adopted to account for the three dimensional effect and time dependent behaviour during tunnel construction. The effect of coupling between the unloading procedure and consolidation during excavation is profoundly investigated with the method. It is pointed out that realistic modelling can be achieved by defining a proper permeability at the excavation boundary and prescribing appropriate time for excavation Some guidelines for the numerical modelling of drained and undrained excavation has been suggested using characteristic time factor. It is highlighted that certain range of the factor shows combined effect between the unloading procedure due to excavation and consolidation during construction.

  • PDF

A Study on Container Monitoring System Using GPS (GPS를 이용한 컨테이너 모니터링 시스템에 관한 연구)

  • Choi Byoung Gil;Jin Sea il;Hong Sang Ki
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.22 no.4
    • /
    • pp.401-409
    • /
    • 2004
  • A monitoring system for container using CPS is the system for positioning and managing containers in real time. CPS is capable of positioning the container, promptly with a reasonable amount of accuracy. Facility managers of ports or airports should have loading, unloading, and keeping freight effectively. Transport companies or freight owners should allocate moving container properly and be able to prevent the loss or delay of freight. In this study, the position and pathways of container are monitored by real-time tracking method. The absolute and relative locations of container are monitored digitally and visually from TC_loading to TC_unloading yard. It has been tested the movement of the containers equiped with GPS, and its accuracy and efficiency were analyzed.

A Motion Analysis Study of Casers for Fish Boxes using Computer Simulation (컴퓨터 시뮬레이션을 이용한 어체 상자 제함기 동작 분석에 관한 연구)

  • Jung, Sung-Heon;Jun, Chul-Woong;Sohn, Jeong-Hyun
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.4
    • /
    • pp.56-61
    • /
    • 2019
  • In this country, mackerel landing, sorting, and packing are mostly performed manually, which is time consuming and labor intensive. An unloading automation system saves time and labor by automating the landing, sorting, and packing processes. Casers are devices for manufacturing packing boxes for fish used by unloading automation systems. The caser design in this study is for mackerel packing boxes. This caser makes a packing box based on a press using the caser's slide crank. When the caser makes a packing box, the manufacturing sequence is determined by the caser's production guide and assisting rod. The caser design in this study is simulated using a multi-body dynamics program. The simulation is used to analyze the caser and to visualize the box-making sequence.

A Study on the Stress History and Secondary Compression of Saturated Clays Subjected to Precompression (사전압밀된 포화점토의 응력이력과 2차압밀에 관한 연구)

  • 김형주
    • Geotechnical Engineering
    • /
    • v.10 no.4
    • /
    • pp.167-180
    • /
    • 1994
  • A series of long term consolidation tests were conducted under loading -unloading and loading(pc) -unloading(p.) -reloading(p,) conditions using reconstituted clay in order to investigate the effect of stress history on secondary consolidation characteristics and the applicability of the secondary consolidation model suggested by Bjerrum to overconsolidated clays. According to the test results, the secondary compression settlement affected by the stress history in the first half of experimental period and the coefficient of secondary compression, C‥‥ is dependent on overconsolidation ratio, OCR(p,1 p.), maBium OCR (p./p.), and unloading duration time. Moreover the coefficient of secondary consolidation in the latter half of experimental period Cn is mainly affected by OCR and it gradually reduces with OCR increment. Finally the comparison of the experimental results with the Bjerrum model indicates that the Bjerrum model can be applied beyond certain range of stress history in the overconsolidated clay.

  • PDF