• 제목/요약/키워드: UP-SET

검색결과 8,115건 처리시간 0.035초

열간 마무리압연 설정의 정도향상을 위한 동적 설정법 (A Dynamic Set-up Technique for High Accuracy set-up of Continuous Hot Strip Finishing Mill)

  • 문영훈;이준정
    • 소성∙가공
    • /
    • 제5권3호
    • /
    • pp.232-238
    • /
    • 1996
  • A dynamic mill set-up technique was developed to achieva a more precise roll gap set-up of the finishing mill stands for steel strip rolling. In the conventional mill set-up model the set-up values such as roll gap and roll speed are determined before the sheet bar reached the entry side of the finishing mill train and maintained constant until the strip top end passes through the last stand. In the way however a dynamic set-up logic that gives a way to adjust the roll gap value of the final mill stand for the strip ingoing from the ahead of the front stand was developed and attached to the existing set-up model. The roll gap modification is based on the analysis of the observation in the third stand of the finishing mill train. The dynamic set-up model was proved very effective for the more precise mill set-up and for operational stability in the hot strip finishing mill train.

  • PDF

동적로트크기결정모형과 EOQ모형에 있어서 가동준비비용의 감소효과 (The Effects of Set-up Cost Reduction in the Dynamic Lot Size Model and the EOQ model)

  • 이상범
    • 한국경영과학회지
    • /
    • 제17권3호
    • /
    • pp.13-26
    • /
    • 1992
  • Set-up reduction is an important aspect of the Japanese Just-In-Time (JIT) and Zero Inventory (ZI) concepts. In this paper, we first analyze the effects of set-up cost reduction on tatal inventory, average lot size and forecast horizon in the dynamic lot size model. We also examine the various effects of set-up cost reduction in the EOQ model and explain why many Japanese firms try to cut set-up cost and/or set-up time greatly.

  • PDF

연속압연기에서 OFF GAUGE 저감을 위한 DYNAMIC SET-UP 제어기술 (DYNAMIC SET-UP CONTROL OF TANDEM COLD MILL)

  • 노호섭;최병조;조뇌하;이재훈;김익준;진철제;박기영
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 1999년도 제3회 압연심포지엄 논문집 압연기술의 미래개척 (Exploitation of Future Rolling Technologies)
    • /
    • pp.126-131
    • /
    • 1999
  • In order to reduce the length of off-gauge at FGC(Flying gauge change) point, We adopted dynamic set up in No. 4 cold rolling mill. The conventional set-up of FGC(Flying gauge change) was calculated on the basis of preset values in the process control computer, so the difference between actual strip thickness and preset thickness cause long off-gauge. The dynamic SET-UP control was calculated on the basis of actual strip thickness of FGC(Flying gauge change) point from X-ray gauge of mill entry and No.i stand. We applied dynamic SET-UP control in September last year. Compare to the previous result, the length of off-gauge is reduced by about 36%.

  • PDF

타입 말뚝의 지지력 증가효과 특성 (The Characteristics of the Set-up Effect of Driven Piles)

  • 조천환
    • 한국지반공학회논문집
    • /
    • 제19권4호
    • /
    • pp.235-246
    • /
    • 2003
  • 국내의 경우 이 등(1994)의 연구를 시작으로 국지 현장별로 타입말뚝의 지지력 증가효과에 대한 사례연구들이 있었다. 그러나 충분한 시험자료를 바탕으로 한 지지력 증가효과에 대한 전반적인 검토는 아직 미흡한 실정이고, 또한 지지력 증가효과에 지반조건 및 말뚝의 형상이 미치는 영향에 대해서는 아직 보고 된 바 없다. 타입말뚝의 지지력 증가효과를 실무적으로 이용하기 위해서는 현장에서 실구조물에 적용된 말뚝에 대한 시험자료의 분석을 실시하는 것이 필요하다. 본 연구에서는 말뚝기초의 설계 및 향후 사질토에서의 지지력 증가효과 등의 연구를 위한 기본 자료로 활용하기 위해 실구조물에 적용되는 다양한 시험말뚝의 시공과 동재하시험 자료 분석을 통해 지지력 증가효과에 대한 현상을 알아보았다. 말뚝의 동재하시험의 분석 결과, 말뚝지지력의 증가는 토질별로도 영향을 받지만 조성이력에도 영향을 받는 것으로 분석되었으며, 특히 사질토에도 상당한 지지력 증가효과가 나타났다. 이러한 말뚝의 지지력의 증가는 주로 주면부에서 발생하였으며, 선단형상에 따른 지지력 증가효과는 점성토에서는 폐단말뚝이 크고, 사질토에서는 개단말뚝이 큰 것으로 나타났다.

Effect of Difference in Warm-Up Intensity During 75%1RM Bench Press Exercise on Number of Repetitions, Total Work, and RPP

  • Jeong, Hwan Jong;Kim, Ki Hong
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권3호
    • /
    • pp.130-136
    • /
    • 2021
  • The purpose of this study was to investigate the effect of the intensity of warm-up exercise on the physiological response and exercise performance during resistance exercise. For this purpose, 8 male college students with at least 1 year of experience in resistance movement were selected. The warm-up condition was set to NON condition (preparatory exercise not performed), 3 set condition, 6 set condition, and 9 set condition, and the intensity was different for each set. After warm-up, 75% 1RM of main exercise was performed, and blood pressure and heart rate were measured immediately after exercise to measure RPP. The number of repetitions and total work for each condition were measured as the number of repetitions and momentum during the main exercise. The measured data were analyzed by repeated measures two-way ANOVA. As a result, although there was no difference in Rate Pressure Product according to the warm-up conditions, the number of repetitions and total amount of exercise showed the highest in the 3-set condition. Therefore, it is thought that the number and intensity of warm-up exercises should be set appropriately during resistance exercise, and warm-up of 3 sets or more during resistance exercise is thought to decrease exercise performance.

유한요소해석을 이용한 후판 압연공정의 선단부 롤갭 설정연구 (A Study on the roll gap set-up at top-end in plate rolling using finite element analysis)

  • 임홍섭;장정환;최민규;서재형;문영훈
    • 한국소성가공학회:학술대회논문집
    • /
    • 한국소성가공학회 2009년도 춘계학술대회 논문집
    • /
    • pp.252-255
    • /
    • 2009
  • The roll gap set-up in the finishing mill is one of the most important technologies in the hot plate rolling process. As the target thickness can be obtained by the correct set-up of the roll gap, improving the roll gap set-up technology is very critical for plate thickness accuracy. The main cause of thickness variation in hot plate mills is the non-uniform temperature distribution along the length of the slab. The objective of this study is to adjust the roll gap set-up for the thickness accuracy of plate in hot rolling process considering top-end temperature drop. Therefore this study has concentrated on determining the correct amounts of roll gap to compensate thickness variation due to top-end temperature drop. The off-line simulation of compensated roil gap significantly decreases top-end thickness variation.

  • PDF

신경망을 이용한 용해로 최적 SET-UP 예측시스템 (Furnace Set-up Prediction System Using Neural Network)

  • 한부학
    • 지능정보연구
    • /
    • 제2권1호
    • /
    • pp.109-120
    • /
    • 1996
  • TV 부라운관 유리를 생산하기 위한 용해 공정은 원료의 투입에서부터 유리물이 생성될 때 까지 고온의 화확적 작용을 거친다. 유리몰을 생성하기 위한 여러 가지 조건중에서 용해로 내부에서의 유리몰의 온도 변화 및 이에 따른 제반 공정변수의 조정 설정치(Set-up)는 불량률에 밀접한 영향을 미친다. 그러나 고온의 밀폐된 환경에서 반응이 진행되므로 공정의 운전 요원들은 그들의 경험을 바탕으로 용해로의 운전상태를 파악하고 운전해 나간다. 본 연구에서는 이러한 경험적 판단에 따른 위험성을 가능한 한 줄이고 용해로의 안정적인 운영을 통하여 불량률을 감소시키기 위하여 용해로 최적 Set-up 예측 시스템을 개발하였다. 이 시스템은 일정 기간 동안의 용해로서 운전 상태와 불량률간의 관계를 신경망 기법을 이용하여 학습한 후에, 이를 이용하여 불량률을 유지하기 위한 Set-up 값을 예측하여 준다.

  • PDF

Set-up 효과를 반영한 타입말뚝의 파동이론해석 (Consideration of Set-up Effect in Wave Equation Analysis of Pile Driving.)

  • 천병식;조천환
    • 한국지반공학회논문집
    • /
    • 제15권2호
    • /
    • pp.95-104
    • /
    • 1999
  • Set-up현상이 나타나는 지반에 항타된 말뚝의 지지력은 시간경과에 따라 지지력이 증가하게 된다. 파동이론해석법(WEAP해석법)은 말뚝의 항타관입성을 평가하는데 매우 유용한 것으로 평가되고 있다. 그러나 기존의 WEAP해석법은 항타후 변화하는 지반의 강도특성을 고려할 수 없다는 측면에서 재항타시의 신뢰도 있는 지지력을 예측하는데 한계가 있다고 평가된다. WEAP에 의한 항타말뚝의 지지력 평가가 신뢰성 있기 위해서는 set-up효과가 반영되어야만 한다. 그러나 아직까지 이를 고려할 수 있는 만족할 만한 방법이 없다. 본 논문에서는 항타시와 재항타시의 동재하시험 결과들을 통계분석하여 WEAP해석시 set-up효과를 반영할 수 있는 방안을 제시하였다. 또한 현장 시험결과와의 비교를 통해서, 제안된 변수(quake, damping)를 적용한 파동이론해석 결과는 기존의 방법보다 신뢰성이 있음을 알 수 있었다.

  • PDF

후판 압연시 선단부 두께편차 보상을 위한 롤갭 설정에 관한 연구 (A Study on the Roll Gap Set-up to Compensate Thickness Variation at Top-end in Plate Rolling)

  • 임홍섭;주병돈;이건엽;서재형;문영훈
    • 소성∙가공
    • /
    • 제18권4호
    • /
    • pp.290-295
    • /
    • 2009
  • The roll gap set-up in the finishing mill is one of the most important technologies in the hot plate rolling process. As the target thickness can be obtained by the correct set-up of the roll gap, improving the roll gap set-up technology is very critical for plate thickness accuracy. The main cause of thickness variation in hot plate mills is the non-uniform temperature distribution along the length of the slab. The objective of this study is to adjust the roll gap set-up for the thickness accuracy of plate in hot rolling process considering top-end temperature drop. Therefore this study has concentrated on determining the correct amounts of thickness variation according to top-end temperature drop and roll gap to compensate thickness variation. The control method of roll gap set-up which can improve the thickness accuracy was proposed. The off-line simulation of compensated roll gap significantly decreases top-end thickness variation.

폐암 환자의 전신 정위적 방사선 수술시 정확한 SET UP에 대한 고찰 (The consideration about exact set-up with stereotactic radiosurgery for lung cancer.)

  • 서동린;홍동기;권경태;박광호;김정만
    • 대한방사선치료학회지
    • /
    • 제16권2호
    • /
    • pp.1-8
    • /
    • 2004
  • 목적 : 전신 정위적 방사선 수술환자 치료 시 환자의 set up을 정확히 확인하고 평가하는 것은 치료 성적을 좌우 하는데 중요한 요소이다. 특히 폐암 환자의 경우 호흡 등에 의한 종양의 움직임으로 인해서 L-gram이나 EPID를 이용하여 정확한 위치를 확인하는데는 여러 가지 어려움이 있다. 이러한 문제점들에 대하여 verification system(exactrac)을 이용하여 set up의 정확성을 확인해 보고자 한다. 대상 및 방법 : Body frame(elekta, sweden)을 이용하여 전신 정위적 방사선 수술을 받는 폐암 환자 6명을 대상으로 (ABC tool을 사용한 환자 5명과 사용 안한 환자1명) 기존의 L-gram과 EPIDs로 image를 획득하여 Ant, Lat image를 비교하여 환자의 set-up을 확인하고 CT에서 얻은 DRR image와 Verification system(exactrac)의 X-ray image를 얻어서 두image를 3차원적으로 fusion하여 그 좌표 값(vertical, longitudinal, lateral)을 분석하고 기존의 방법과의 차이를 확인하였다. 결과 : L-gram과 EPIDs로는 정확한 좌표 값보다는 주관적으로 Set up의 정확성 여부를 판단하여 치료할 수 있었지만 Verification system(exactrac)을 이용하여 확인한 결과 치료환자의 Set up 전, 후의 좌표 값(vertical, longitudinal, lateral)이 0.5cm이내에 포함되는 것을 볼 수 있었고 좌표 값의 차이를 시각적이고 객관적으로 평가할 수 있어서 Set up의 정확성을 판단하는 데 유용했다. 결론 : Verification system(exactrac)을 사용하면 환자의 Set up이 정확한 지 치료 전 또는 중간에도 시각적인 확인이 가능한 장점이 있지만 기존의 방법보단 확인과정이 조금 복잡하고 CT scan 시 3mm 이내로 해야 하며 X-ray image가 선명하게 나타나야 된다는 단점이 있다. 이러한 문제점만 해결된다면 Set up의 정확성을 쉽게 확인할 수 있어서 치료 시 많은 도움이 되리라고 생각된다.

  • PDF