• Title/Summary/Keyword: Tunnel view

Search Result 134, Processing Time 0.019 seconds

Rock Support Design of Bakun Tunnelling Project in Sarawak, Malaysia (바쿤 가배수로 터널의 최적지보설계)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.8 no.4
    • /
    • pp.296-306
    • /
    • 1998
  • Ongoing huge Bakun Hydropower project is including the construction of a 210 m height hydroelectric rockfill dam with an installed capacity of 2,520 MW and a power transmission system connecting to the existing networks between Sarawak and peninsula Malaysia. In order to allow the main dam construction during the dry season, the Ballui river will have to be detoured through 3 concrete lined diversion tunnels with an internal diameter of 12 m and a length of 1,400 m each. The geology of Bakun site belongs to the several thousand meters thick Belaga formation deposited from the late Cteteceous to the early Teriary in the Northwest Borneo geosyncline. The orientation of the bedding plane, strike at N55$^{\circ}$E to N70$^{\circ}$E and dip at 50$^{\circ}$SE to 70$^{\circ}$SE, is developed uniformly in Bakun sedimentary rocks. Rock mechanical characteristics of Bakun site have been classified into 4 rock mass types(RMT) depending on the degree of weathering and the occurrence of rock jointing with RMR. Graywacke(Sandstone) as well as Shale can take place together in the same rock mass type if their rock mass properties are similar. It was summarized the rock support type and support system design of underground diversion tunnels in view of rock mechanics.

  • PDF

Anatomic coracoclavicular ligament reconstruction with triple flip-buttons leads to good functional outcomes and low reduction loss: a case series

  • Raul Aguila;Gonzalo Gana;J Tomas Munoz;Diego Garcia de la Pastora;Andres Oyarzun;Gabriel Mansilla;Sebastian Coda;J Tomas Rojas
    • Clinics in Shoulder and Elbow
    • /
    • v.26 no.2
    • /
    • pp.140-147
    • /
    • 2023
  • Background: The management of acromioclavicular (AC) joint dislocation remains controversial. Recently, anatomic coracoclavicular (CC) fixation with a double clavicular tunnel and three flip-buttons has shown promising results. This study aimed to evaluate functional and radiological outcomes in patients with high-grade AC joint dislocation treated with anatomic CC fixation using double clavicular tunnels and three flip-buttons. Methods: A retrospective, unicentric study was performed. The study included patients with high-grade AC joint dislocation who underwent surgery with anatomic CC fixation using double clavicular tunnels and three flip-buttons. Demographic data were obtained from medical records. A functional evaluation using subjective shoulder value (SSV), visual analog scale (VAS), and disabilities of the arm, shoulder, and hand (DASH) questionnaires was performed, and an evaluation of preoperative and postoperative comparative Zanca view images was performed. Factors associated with functional outcomes and radiological AC reduction were analyzed. Results: A total of 83 patients completed follow-up and were included in the analysis. The mean SSV, VAS, and DASH scores were 92.8, 0.8, and 6.4, respectively. Patients who had complications experienced significantly worse functional outcomes (DASH: P=0.037). Suboptimal final AC reduction was observed in nine patients (11.1%), and significantly more frequently in patients older than 40 years (P=0.031) and in surgeries performed more than 7 days after injury (P=0.034). There were two reoperations (2.4%). Conclusions: Anatomic CC fixation with a double clavicular tunnel and three flip-buttons leads to good functional outcomes, low complication rates, and high rates of optimal AC reduction.

Femoral Tunnel Obliquity between the Transtibial and Anteromedial Portal Technique in Single Bundle Anterior Cruciate Ligament Reconstruction (전방십자인대 단일 다발 재건술에서 경경골 술기 및 전내측 삽입구를 이용한 대퇴골 터널의 기울기)

  • Lee, Ju-Hong;Park, Jong-Hyuk;Bae, Hyeon-Kyeong;Kim, Jong-Gil;Wang, Sung-Il
    • Journal of Korean Orthopaedic Sports Medicine
    • /
    • v.9 no.1
    • /
    • pp.41-47
    • /
    • 2010
  • Purpose: To compare the obliquity of femoral tunnels prepared with transtibial (TT) versus anteromedial portal technique (AM) using x-ray in single-bundle anterior cruciate ligament (ACL) reconstruction. Materials and Methods: Among one-hundred thirty two patients who were undergoing ACL reconstruction from January 2007 to December 2009, thirty patients using TT and twenty patients using AM, those who had single-bundle ACL reconstruction, were evaluated with plain radiographs including anteroposterior, intercondylar notch and lateral view to compare the obliquity of bone tunnels. Results: The mean coronal obliquity of femoral tunnel for TT was $71^{\circ}$ (range; $65^{\circ}{\sim}77^{\circ}$), while for AM was $51^{\circ}$ (range; $39^{\circ}{\sim}60^{\circ}$) and the mean sagittal obliquity of femoral tunnel for TT was $22.7^{\circ}{\pm}7.8$, while for AM was $30.2^{\circ}{\pm}6.9$, their differences between them were statistically significant (P<0.05). However, there were no differences between two techniques on the tibial tunnel obliquity in coronal and sagittal plane. Conclusion: Anterior cruciate ligament reconstruction using AM portal technique allows more horizontally oriented and divergent femoral tunnel compared to that of transtibial technique. This seems to enable the graft placement into the femoral footprint and preserve the posterior cortical wall.

  • PDF

Determination of Critical Slope Height for Large Open-pit Coal Mine and Analysis of Displacement for Slope failure Prediction (대규모 노천 석탄광산의 한계사면높이 결정과 사면파괴 예측을 위한 계측자료 해석)

  • Jung, Yong-Bok;SunWoo, Choon;Lee, Jong-Beom
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.447-456
    • /
    • 2008
  • Open-pit mine slope design must be carried out from the economical efficiency and stability point of view. The overall slope angle is the primary design variable because of limited support or reinforce options available. In this study, the slope angle and critical slope height of large coal mine located in Pasir, Kalimantan, Indonesia were determined from safety point of view. Failure time prediction based on the monitored displacement using inverse velocity was also conducted to make up fir the uncertainty of the slope design. From the study, critical slope height was calculated as $353{\sim}438m$ under safety factor guideline (SF>1.5) and $30^{\circ}$ overall slope angle but loom is recommended as a critical slope height considering the results of sensitivity analysis of strength parameters. The results of inverse velocity analysis also showed good agreement with field slope cases. Therefore, failure of unstable slope can be roughly detected before real slope failure.

Development of Spatial Information System for Regional Ground Stability Assessment near Dam area (댐 주변지역 광역적 지반 안정성 평가를 위한 공간 정보시스템 개발)

  • 장범수;이사호;최위찬;최재원;오영철
    • Spatial Information Research
    • /
    • v.9 no.1
    • /
    • pp.125-135
    • /
    • 2001
  • Ground failure such as landslide, rock fall land subsidence by heavy rainfall have damaged to people and property. Especially, the damage to important facility such as dam, bridge, tunnel and industrial complex may be possible. Therefore the ground failure must be assessed and counter plan must be prepared. So, the object of this study is to develop the spatial information system for regional ground stability assessment. For this, the topographic, geologic, soil, forest, land use, rainfall frequency map, and satellite image near 40 dams were collected and constructed to the spatial information system. The spatial information system was developed using Avenue in ArcView 3.2 environment and consists of pull down menus and icons. For application of the spatial information system, regional ground stability was assessed in Andong dam. The assessment was ground failure susceptibility and possibility. The spatial information can be used for regional ground stability assessment, prevention and mitigation of hazard, and management of ground as basic data.

  • PDF

Modified Submental Intubation in Panfacial Bone Fracture Patients (전안면골 골절에서의 변형된 아래턱밑 삽관)

  • Choi, Sang-Mun;Song, Seung-Han;Kang, Nak-Heon
    • Archives of Plastic Surgery
    • /
    • v.38 no.1
    • /
    • pp.127-129
    • /
    • 2011
  • Purpose: Nasotracheal or oral intubation procedure is widely used for facial bone fractures. However, during the operation intubated tube can interfere or obstruct the view of the operator. We authors used a modified submental intubation method in panfacial bone fracture patients for intact airway and the operation view. Methods: After intravenous induction of anaesthesia, traditional orotracheal tubation was done. A horizontal incision was made 2 cm from the midline, 2 cm medial to and parallel with the mandible in the submental region. 1 In order to approach to the floor of the oral cavity, a haemostat was pushed through the soft tissues. A chest tube front cover was applied to the intubation tube and the tube was inserted through the submental tunnel. Orotracheal tube was disconnected and pulled back through the soft tissue and secured with a suture. Results: The procedure took about 30 minutes and there were no problems during the intubation. Intraoral manipulation and occlusal checks were free without any interference. Extubation was also easily done without any complications such as lung aspiration, infection, hematoma, or fistula. Conclusion: Submental endotracheal intubation is fast, safe, easy to use and free from the concern about the tube being pull back again. Conventional submental intubations are being held without any coverage of the tip. We authors applied the modified method to the trauma patients and obtained satisfactory results. From the above advantages, modified submental intubation can be widely available not only in fractured patients, but also in aesthetic or orthognathic surgeries.

A Study on the Application of Real-time Environment Monitoring System in Underground Mines using Zigbee Technology (지그비 기술을 이용한 지하광산 내 실시간 환경 모니터링 시스템 현장 적용 연구)

  • Park, Yo Han;Lee, Hak Kyung;Seo, Man Keun;Kim, Jin
    • Tunnel and Underground Space
    • /
    • v.29 no.2
    • /
    • pp.108-123
    • /
    • 2019
  • In recent years, as safety management in underground mines has become more important in the worldwide, mine safety management technologies combining information communication technology such as real-time worker position tracking, monitoring system and equipment remote control have been developed. Wireless communication system is mainly applied to these technologies for the flexibility of network configuration. There are some cases the monitoring system was installed in domestic underground mines, but, it is necessary to develop the technology more suitable for domestic mining standard. In this study, we developed the real-time environmental monitoring system using ZigBee technology and examined the result of application to domestic limestone mine. Furthermore, applicability of the developed environment monitoring system to $VentSim^{TM}$ LiveView was checked. This study is expected to contribute to the related studies like the optimization of the ventilation system in underground mines.

PIV measurement of roof corner vortices

  • Kim, Kyung Chun;Ji, Ho Seong;Seong, Seung Hak
    • Wind and Structures
    • /
    • v.4 no.5
    • /
    • pp.441-454
    • /
    • 2001
  • Conical vortices on roof corners of a prismatic low-rise building have been investigated by using the PIV(Particle Image Velocimetry) technique. The Reynolds number based on the free stream velocity and model height was $5.3{\times}10^3$. Mean and instantaneous vector fields for velocity, vorticity, and turbulent kinetic energy were measured at two vertical planes and for two different flow angles of $30^{\circ}$ and $45^{\circ}$. The measurements provided a clear view of the complex flow structures on roof corners such as a pair of counter rotating conical vortices, secondary vortices, and tertiary vortices. They also enabled accurate and easy measurement of the size of vortices. Additionally, we could easily locate the centers of the vortices from the ensemble averaged velocity fields. It was observed that the flow angle of a $30^{\circ}$ produces a higher level of vorticity and turbulent kinetic energy in one of the pair of vortices than does the $45^{\circ}$ flow angle.

Mathematical modelling of wind turbine blades through volumetric view

  • Vardar, Ali;Eker, Bulent
    • Wind and Structures
    • /
    • v.9 no.6
    • /
    • pp.493-503
    • /
    • 2006
  • The demand for energy in the world increases everyday. Blade energy which is wind turbine is a significant resource which must be appreciated in this field. Especially, in places where wind potential is high, the usage of wind energy is a beneficial factor for every country's economy. In this study, first, 6 different miniature rotor were produced by using 6 different NACA profiles. Rotors were produced with three blades. The electrical performance and the speed of start of action values that are provided from each rotor form were established by measuring them in the wind tunnel. The calculation of area and volumetric values of each profile and wind surfaces were made with AutoCad technical drawing program. As a result, it was searched whether there is any relation between electrical performance values and speed of start of motion that rotors produced and volumetric values of rotors. The aim of this study is to find out whether rotor blade volume is one of factors that influences rotor performance. The general tendency observed here is that the increase in the volume of rotor blade leads to an increase in the speed of start of motion and to a decrease in the rotor performance.

Operational Vibration Experiment and Analysis of a Small Vertical-Axis Wind Turbine Considering the Effect of a Tower Stiffness (타워강성 효과를 고려한 소형 수직축 풍력발전기 운전 진동실험 및 해석)

  • Choo, Heon-Ho;Sim, Jae-Park;Oh, Min-Woo;Kim, Dong-Hyun
    • The KSFM Journal of Fluid Machinery
    • /
    • v.16 no.3
    • /
    • pp.5-9
    • /
    • 2013
  • In this study, operational vibration experiment and analysis have been conducted for the 4-blade small vertical-axis wind turbine (VAWT) including the effect of tower elastic behavior. Computational structural dynamics analysis method is applied to obtain Campbell diagram for the VAWT with elastic tower. An open type wind-tunnel is used to change and keep the wind velocity during the ground test. Equivalent elastic tower is used to support the VAWT so that the effect of elastic stiffness of the tower can be considered in the present vibration experiment. Various excitation conditions with wind loads are considered and the dominant operating vibration phenomena are physically investigated in detail.