• Title/Summary/Keyword: Tunnel Project

Search Result 282, Processing Time 0.026 seconds

Performance of Steel Fiber Reinforced Shotcrete using Alkali Free Based Accelerator (알칼리 프리계 급결제를 사용한 강섬유 보강 숏크리트의 성능 평가)

  • Baek, Chul-Woo;Park, Chan-Gi;Jun, Oun-Jung;Won, Jong-Pil
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.3
    • /
    • pp.65-72
    • /
    • 2004
  • Modern underground and tunnel works that the wet type shotcrete is getting widely designed and applied in a large scale project. Further to its applications, the needs of improving the performance of the shotcrete, such as new and developed additives and accelerators fur increasing the performance of shotcrete, become the most important issue in the field. The main objective of this study evaluated to performance of steel fiber reinforced shotcrete using alkali free based accelerator for the durability and high quality of shotcrete. The major test variables are accelerator type and its dosage. One type silicate based accelerator and one type aluminate based accelerator and one type alkali free based accelerator were used. The dosage of accelerators is determined by the manufactures and laboratory test condition. Compressive strength test results showed that the dosage of silicate and aluminate based accelerators caused reduction of mechanical properties of shotcrete. Compressive strength of alkali free based accelerator is more stable than of silicate and aluminate based accelerators. Also, according to the compressive strength and flexural test results, it was found that steel fiber reinforced shotcrete used alkali free based accelerator could attain significant improvement in the mechanical and flexural performance.

Vertical Z-vibration prediction model of ground building induced by subway operation

  • Zhou, Binghua;Xue, Yiguo;Zhang, Jun;Zhang, Dunfu;Huang, Jian;Qiu, Daohong;Yang, Lin;Zhang, Kai;Cui, Jiuhua
    • Geomechanics and Engineering
    • /
    • v.30 no.3
    • /
    • pp.273-280
    • /
    • 2022
  • A certain amount of random vibration excitation to subway track is caused by subway operation. This excitation is transmitted through track foundation, tunnel, soil medium, and ground building to the ground and ground structure, causing vibration. The vibration affects ground building. In this study, the results of ANSYS numerical simulation was used to establish back-propagation (BP) neural network model. Moreover, a back-propagation neural network model consisting of five input neurons, one hidden layer, 11 hidden-layer neurons, and three output neurons was used to analyze and calculate the vertical Z-vibration level of New Capital's ground buildings of Qingdao Metro phase I Project (Line M3). The Z-vibration level under different working conditions was calculated from monolithic roadbed, steel-spring floating slab roadbed, and rubber-pad floating slab roadbed under the working condition of center point of 0-100 m. The steel-spring floating slab roadbed was used in the New Capital area to monitor the subway operation vibration in this area. Comparing the monitoring and prediction results, it was found that the prediction results have a good linear relationship with lower error. The research results have good reference and guiding significance for predicting vibration caused by subway operation.

Mechanized tunnels lining prefabricated segments production methods

  • Elaheh Banihashemigargari;Amir H. Rezaeifarei
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.503-512
    • /
    • 2023
  • In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.

Mechanical behavior and simplified models for the post-tensioned prestressed concrete lining

  • Fan Yang;Kang Liu;Yan-qiao Wang;Ming Huang
    • Structural Engineering and Mechanics
    • /
    • v.86 no.1
    • /
    • pp.17-27
    • /
    • 2023
  • To investigate the mechanical behavior of the post-tensioned prestressed concrete lining (PPCL), the desilting tunnel of the Xiaolangdi Hydro Project in China is adopted as a case, and a detailed three-dimensional continuum model verified by the observation results is established for the PPCL. The radial stresses, longitudinal stresses, axial forces and bending moments of the PPCL under the completed cable tension condition (CCTC) and design water pressure condition (DWPC) are analyzed, respectively. The numerical results reveal that the PPCL concrete is significantly compressed in the circumferential direction by the prestress, while the prestress has a negligible influence on the radial stresses of the PPCL concrete. It should be noted that the concrete near the anchor slots has a complex and adverse stress state with stress concentration, longitudinal tensioning and large bending moment. In addition, a simplified shell model and a further simplified beam model which can take the influences of the prestress loss and the anchor slot into consideration are proposed for the PPCL. The results of the simplified models are in a good agreement with these of the three-dimensional continuum model, and they can be used as efficient approaches for the structural design and analysis of the PPCL.

Comparison of measured values and numerical analysis values for estimating smart tunnel based groundwater levels around vertical shaft excavation (수직구 굴착시 스마트 터널기반 지하수위 현장계측과 수치해석 비교 연구)

  • Donghyuk Lee;Sangho Jung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.153-167
    • /
    • 2024
  • Recently the ground settlement has been increasing in urban area according to development. And, this may attribute a groundwater level drawdown. This study presents an analysis of groundwater level drawdown for circular vertical shaft excavation of 「◯◯◯◯ double track railway build transfer operate project」. And, in-situ monitoring data and numerical analysis were compared. So, if we examine the groundwater level drawdown in design, ground conditions should be applied so that the site situation can be reflected. And, groundwater level should be considered a seasonal measurement in order to apply the appropriate groundwater level. It was confirmed a similar predicted value to groundwater level drawdown of in-situ monitoring data.

Case Study on Groß Schönebeck EGS Project Research in Germany (독일 그로스 쉐네벡 EGS 실증 프로젝트 연구사례)

  • Min, Ki-Bok;Park, Sehyeok;Zimmermann, Gunter
    • Tunnel and Underground Space
    • /
    • v.25 no.4
    • /
    • pp.320-331
    • /
    • 2015
  • This paper presents a case study of an enhanced geothermal system(EGS) demonstration project conducted in $Gro{\ss}$ $Sch{\ddot{o}}nebeck$, Northerm Germany, focusing on hydraulic stimulation. The project was conducted with doublet system in sandstone and volcanic formations at 4 - 4.4 km depth. Under normal faulting to strike-slip faulting stress regime, hydraulic stimulations were conducted at injection and production wells by massive waterfrac and gel-proppant fracturing. Injectivity index increased from $0.97m^3/(hr^*MPa)$ to $7.5m^3/(hr^*MPa)$ and productivity index increased from $2.4m^3/(hr^*MPa)$ to $10.1m^3/(hr^*MPa)$ by a series of hydraulic stimulations at both wells. After circulation tests through injection and production wells, however, productivity index decreased from $8.9m^3/(hr^*MPa)$ to $0.6m^3/(hr^*MPa)$ in two years. Slip tendency analysis for the stimulation in volcanic layer estimated the required pressure for shear slip and its preferred orientations and it showed reasonable match with actual stimulation results. Through the microseismicity observation for the stimulation of volcanic formation, only 80 seismic events with its moment magnitudes in -1.8<$M_W$<-1.0 were observed, which are unexpectedly low for EGS hydraulic stimulation.

A Study on the Evaluation of Environmental Load Based on LCA Using BIM - Focused on the Case of NATM Tunnel - (BIM을 활용한 LCA기반 환경부하평가에 관한 연구 - NATM 터널 사례 중심으로 -)

  • Lee, Yang-Kyoo;Han, Jung-Geun;Kwon, Suk-Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.3
    • /
    • pp.477-485
    • /
    • 2018
  • To control manage environmental load during construction work, it is required to ascertain an accurate quantity for materials those are using during the construction. In construction industrial nowadays, especially on design part, there are lots of mistakes occurred on quantity take-off between plan documents and actual work. That mistakes are caused by omission of design items, overcount because of interference each materials or simple calculate error. Besides, in case of a construction project, engineers are impossible to design perfectly due to a lot of invalid variable in a construction site. Thus, design errors and changes occur frequently in the process of construction work or design due to such unclear elements. And in case of LCA assessment based on 2D design, there is difficult for an engineer who is in charge to calculate the volume of materials manually using drawings and relevant specifications. This study is aimed for examining and verifying a high reliable method of evaluating environmental load which is useful in construction process through comparing LCA analysis. In addition, this study provides the method of calculating the volume of materials and LCA assessment in working on the basis of 2D design, using the specifications which is used for LCA evaluation, and possibility of utilizing the LCA assessment by introducing BIM design technic to improve the former problem through comparing and analyzing the previous method with 3D-based evaluation process.

Prediction of Ground Condition and Evaluation of its Uncertainty by Simulated Annealing (모의 담금질 기법을 이용한 지반 조건 추정 및 불확실성 평가에 관한 연구)

  • Ryu Dong-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.4 s.57
    • /
    • pp.275-287
    • /
    • 2005
  • At the planning and design stages of a development of underground space or tunneling project, the information regarding ground conditions is very important to enhance economical efficiency and overall safety In general, the information can be expressed using RMR or Q-system and with the geophysical exploration image. RMR or Q-system can provide direct information of rock mass in a local scale for the design scheme. Oppositely, the image of geophysical exploration can provide an exthaustive but indirect information. These two types of the information have inherent uncertainties from various sources and are given in different scales and with their own physical meanings. Recently, RMR has been estimated in unsampled areas based on given data using geostatistical methods like Kriging and conditional simulation. In this study, simulated annealing(SA) is applied to overcome the shortcomings of Kriging methods or conditional simulations just using a primary variable. Using this technique, RMR and the image of geophysical exploration can be integrated to construct the spatial distribution of RM and to evaluate its uncertainty. The SA method was applied to solve an optimization problem with constraints. We have suggested the practical procedure of the SA technique for the uncertainty evaluation of RMR and also demonstrated this technique through an application, where it was used to identify the spatial distribution of RMR and quantify the uncertainty. For a geotechnical application, the objective functions of SA are defined using statistical models of RMR and the correlations between RMR and the reference image. The applicability and validity of this application are examined and then the result of uncertainty evaluation can be used to optimize the tunnel layout.

Noise Prediction of Korea High Speed Train (KHST) and Specification of Sub-components (한국형 고속전철 차량소음 예측 및 부품 소음관리방안)

  • ;;;H.W. Thrane
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.12 no.10
    • /
    • pp.758-765
    • /
    • 2002
  • KITECH and ODS performed a study of internal and external noise prediction of the Korean high speed prototype test train(HSR 350X). The object of this study was 3 kinds of cars, trailer car(TT2), motorized car(TMI ) and power car(TPI) and the predicted noise was for the two different driving speeds in free field and tunnel conditions. Data of carbody design and noise sources were delivered from manufactures. Some of noise sources which were not available in the project team, were chosen by experiences of ODS. Internal noise level of each car was predicted for two cases i.e, at 300 km/h and 350 km/h. In addition sound transmission path and dominant noise sources were also investigated for each section of the car, which is circular shell typed part of whole carbody. In case of TT2, the dominating sound transmission path is the (floor in terms of structure-borne noise and air-borne noise. The main noise sources are structure-borne noise from the yaw-damper and air-borne noise from the wheel/rail contact, whereas the dominating sound transmission path of TMI are floor and sidewall below the window in terms of structure-borne noise. The main noise sources of TMI are structure-borne noise from motor/gear unit and the yaw-damper in the free field, and air-borne noise from the wheel/rail contact and structure-borne noise from motor/gear unit in the tunnel. Through the external noise prediction for the KHST test train formation, the noise form the wheel/rail contact is estimated as one of the major sources. In addition, the noise specification of sub-component was proposed for managing each sub-surpplier to reach the KHST noise requirement. The specification provide the sound power of machinery part and transmission loss of component of carbody structure. The predicted noise level in each case exceeded the required limit. Through this study, the noise characteristics of the test train were investigated by simulation, and then the actual test will be performed in near future. Both measured and calculated data will be compared and further work for noise reduction will be continued.

On-Land Seismic Survey of Korea (한국의 육상 탄성파탐사)

  • Kwon, Byung-Doo
    • Economic and Environmental Geology
    • /
    • v.39 no.4 s.179
    • /
    • pp.441-450
    • /
    • 2006
  • The on-land seismic survey in Korea was begun in mid-1960s. Kim et al.(1967) of Korea Geological Survey reported on the result of gravity and seismic reflection surveys conducted in the Pohang area for the period of 1963-64 to assess its possibility of oil entrapment. Hyun and Kim (1966) carried out a refraction survey on the tunnel wall. Since then, the KGS geophysicists had conducted seismic surveys on Kyungsang sedimentary basin as a main project for several years. In 1970s, on-land seismic surveys had been conducted for various purposes such as site investigation for the nuclear power plants and industrial complex, exploration for ground water, mineral resources and underground tunnel. The first reflection survey with CMP acquisition was attempted in 1978 by using a digital recording system. But most of on-land seismic surveys had employed the refraction method until 1980s. In 1990s, high resolution reflection and various borehole seismic surveys such as tomography, uphole, downhole, cross-hole methods have been attempted by universities and engineering companies. The applications of on-land seismic surveys have been enlarged for both academic and industrial purposes such as investigation of geologic structure of the fault and tidal flat area, construction of highway, railroad and dam, geothermal energy and mineral resource exploration, environmental assessment for waste disposal sites and archaeological investigations. In 2002, the first crustal seismic survey was carried out on the profile of 294km length across the whole peninsular. It is expected that the advanced technology and experience acquired through offshore seismic surveys, which have been conducted in continental shelf of Korea and foreign oil fields, will stimulate the more active on-land seismic explorations.