• 제목/요약/키워드: Trial construction

검색결과 268건 처리시간 0.022초

국내 건설공사기준 분석을 통한 U-City의 건설-IT융합 기술기준 구성 체계 개발 (The Development of Structure of Construction-Information Converged Technology Criteria on U -City by analyzing Domestic Construction Criteria)

  • 김창한;한재구;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.137-141
    • /
    • 2009
  • Recently IT industry has its eyes on IT Converged Technology as its future growth engine. Now, local governments are busy with planning U-City Constructions to improve their competitiveness. While this shows the ripple effect of U-City Constructions, the related standards or laws don't still seem to be established. The existing Construction Criteria which comprehends only construction could not apply to U-City development. Therefore Construction-Information Converged Technology Criteria should be needed. And fundamental research of Criteria should be preceded. The objective of this research is to develop Structure of Construction-Information Converged Technology Criteria on U-City. The new comprehensive Criteria for Construction-Information Converged Technology would be fundamentally basic standard for U-city development. Thereafter local governments, the main body of the projects, could use Construction-Information Converged Technology Criteria so that there must be lest trial and error to Construction U-City Project.

  • PDF

압출식 적층제조 기술을 적용한 건축 3D 프린팅 운영절차의 설계 및 검증 (Construction 3D printing SoP Design and Verification Using Material Extrusion Additive Manufacturing Technology)

  • 박진수;김경택
    • 한국건설관리학회논문집
    • /
    • 제23권1호
    • /
    • pp.106-112
    • /
    • 2022
  • 적층제조(AM, 3D프린팅) 기술은 건설업계에서 다양한 효과로 주목받고 있다. 특히 시공자동화, 자원관리, 시공기간 정밀도 향상, 작업자 안전 등의 문제점을 해소하는 능력을 기대하고 있다. 하지만, 적층 시공 과정은 축적된 데이터가 많은 기존 시공기술과 달리 성숙하지 못한 절차 및 시공방법으로 인해 시행착오와 예측이 어려운 사고를 유발한다. 본 연구에서는 현장 시공형 건설 AM 프로세스를 설계하고 실증을 위한 실험이 진행된다. 또한, 정성적인 실험결과의 원인 분석이 진행되었다.

부산~거제간 연결도로 해상교량기초 그라우팅 시공사례 연구 (Application of Grouting of the Sea-Crossing Bridge Foundation in Busan-Geoje Fixed Link)

  • 박충환;정상균;정경환;신민식;박찬우;권진욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2007년 가을학술발표회
    • /
    • pp.665-678
    • /
    • 2007
  • It was applied the grouting method to fill densely the space between the bottom of the caisson and the ground with the grout mixture mixed with anti-washout admixture after locating accurately the precast caisson on three concrete landing pads but it is far different from a costly conventional method, which place concrete to build the foundation of reinforcement concrete on the spot after excavating inside of the temporary coffering wall for the bridge foundation in the sea. To verify the grouting method in advance, the full-scale trial test was performed twice on the land. After confirming the fluidity of material for the injection and some possible problems during construction and then enhancing the original design, the main process is ongoing and it has been finished 12 spots until now. The purpose of this study is to introduces for the first time in Korea the grouting method including the automatic and the manual monitoring process applied to, based on the main process of the caisson foundation finished already in the site. In a similar construction it is sincerely expected to be referred to in the future.

  • PDF

주기적(週基的)인 압축하중을 받는 원통(円筒) Panel의 동적(動的) 불안정(不安定) 특성(特性)에 관한 연구 (Parametric Instability of Cylinderical Panels)

  • 박승진;미카미 타카시
    • 한국강구조학회 논문집
    • /
    • 제12권6호
    • /
    • pp.737-748
    • /
    • 2000
  • 본 논문은 직선변이 단순지지, 원호변이 단순 또는 고정인 경계조건의 원통 Panel을 해석하였다. 해석방법은 Galerkin법을 사용하였고, 기초방정식은 Love-Timoshenko의 기초식을 이용한 진동 좌굴 및 동적문제에 관한 특성을 명확히 하였다. 특히, 고정지지를 포함한 Panel에 대해서는 시행함수로서 삼각함수만으로 나타나는 경우와 쌍곡선함수로 나타나는 보의 고유함수를 이용하여 해석하였으며 시행함수에 미치는 영향을 검토하였다.

  • PDF

현장시험시공을 통한 쐐기형 제거식 쏘일네일링 공법의 거동 평가 (An Estimation of Behavior for Wedge type Removable Soil Nailing System by Field Trial Construction)

  • 한연진;박시삼;권혁준;김홍택;박주석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.1360-1364
    • /
    • 2009
  • Necessity of removable soil nailing has been arisen in the soil nailing system because of problem such as civil petition for geotechnical environment and invasion of the ground boundary line and payments for use besides geotechnical engineering. Removable soil nailing system is improved soil nailing system that fixed socket arranged in boring hole for increasement of skin friction. In this study, field pull-out tests are carried out more 4 times considering installed distance of fixed socket and analyze skin friction behavior characteristics in fixed socket through analysis of measurements of strain gauge attached to fixed socket. Also, to evaluate application for wedge type removable soil nailing system analyzing displacement aspects through field pull-out tests by trial construction.

  • PDF

A Retrospection on Foundation Design of Taipei 101

  • Chin, Chung-Tien;Chao, Hsiao-Chou;Chang, Der-Wen
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.145-156
    • /
    • 2009
  • Large diameter bored pile was selected as the foundation type for Taipei 101. The pile construction method and specific construction procedures were determined based on the results of trial installation and pile load tests. The baseline for foundation design was established using the friction versus depth characteristics of each ground layer obtained from the pile load tests. As the ground profile and depth to the top of rock formation varied significantly on this site, the pile length, bearing capacity and settlement for single pile were analyzed using the information interpreted from adjacent boreholes. The post grouting at pile tip was mandatory for pile construction. Nevertheless, it was treated as a measure reducing the influence of construction uncertainties and providing extra safety for the foundation system.

  • PDF

울산대공원 조경공사의 각 세부공정이 전체공정율에 미치는 영향분석 (An Analysis of Influences on Partial Work Rates under the Whole Work Rates on the Landscape Constructions in the Ulsan Grand Park)

  • 성백진;이재근;최종희
    • 한국조경학회지
    • /
    • 제31권6호
    • /
    • pp.64-72
    • /
    • 2004
  • This study analyses influences on partial work rates under whole work rates on landscape constructions in Ulsan Grand Park. The schedule management is one of the factors that are very important to the process management of landscape construction. The time process of the whole construction is supposed to be affected by several kinds of work that organize the whole construction. First, this study divides the construction of Ulsan Grand Park into 10 kinds of works: earth work, rain and sanitary sewage water work, water-supplying work, planting work, paving work, water proofing work, fountain work, instituting work and temporary work. Then the time-process curves of all kinds of work are statistically compared to that of the whole construction. The trial methods of statistics are lineal regression, non-lineal regression, and principal analysis. In the result of the non-lineal regression, the rain and sanitary sewage water work, the water-supplying work and the earth work strongly affected the whole construction. The principal analysis results show that the whole construction is affected strongly by the water-supplying work, the rain and sanitary sewage water work and the earth work. However the lineal regression is shown to be senseless because of its high collinearity.