• Title/Summary/Keyword: Tree Management

Search Result 1,819, Processing Time 0.039 seconds

Resolving the Funneling Effect in the Node Mobility Management of Infrastructure-based Mobile Ad Hoc Networks (인프라구조 기반 이동 애드혹 네트워크의 이동성 관리에서 깔때기 효과의 해결 방안)

  • Lee, Sung-Uk;Ngo, Chi-Trung;Kim, Je-Wook;Oh, Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.12A
    • /
    • pp.984-993
    • /
    • 2011
  • In this paper, we present a new method for efficient mobility management in infrastructure-based ad hoc networks. This type of network inherently takes the tree topology model in which an Internet gateway (IG) becomes a root. Accordingly, the nodes near the IG process get much more number of messages, thereby causing a bottleneck phenomenon that degrades network performance. This problem is known as a funneling effect. We present a method to maximize message aggregation in which the nodes in the networks form tree topology and perform skewed time synchronization according to the depths of the nodes during the tree construction process. We proved by resorting to simulation that the funneling effect is alleviated and network performance is improved greatly.

A Study on the Development of Construction Dispute Predictive Analytics Model - Based on Decision Tree - (PA기법을 활용한 건설분쟁 예측모델 개발에 관한 연구 - 의사결정나무를 중심으로 -)

  • Jang, Se Rim;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.76-86
    • /
    • 2021
  • Construction projects have high potentials of claims and disputes due to inherent risks where a variety of stakeholders are involved. Since disputes could cause losses in terms of cost and time, it is a critical issue for contractors to forecast and pro-actively manage disputes in advance in order to secure project efficiency and higher profits. The objective of the study is to develop a decision tree-based predictive analytics model for forecasting dispute types and their probabilities according to construction project conditions. It can be a useful tool to forecast potential disputes and thus provide opportunities for proactive management.

Factors Affecting Acer mono Sap Exudation : (II) Hamyang Region in Korea (고로쇠나무 수액의 출수에 미치는 영향 인자 분석 : (II) 함양 지역)

  • Choi, Won-Sil;Park, Mi-Jin;Kim, Ho-Yong;Choi, In-Gyu;Lee, Hak-Ju;Kang, Ha-Young
    • Journal of the Korean Wood Science and Technology
    • /
    • v.38 no.4
    • /
    • pp.349-358
    • /
    • 2010
  • This study was carried out to investigate the optimum condition for sap exudation of Acer mono Max. tree in a site of Mt. Jiri, Hamyang-gun, Korea. Amount of sap exudation, air temperature, relative air humidity, tree diameter at breast height (DBH) and sugar content in sap were monitored during the early springtime, and correlation analysis of several factors was carried out to explain tree-to-tree and date-to-date variations in sap exudation. The correlation, linearlyassociated between DBH and sap amount, was strengthened as daily amount of sap increased, but there was no significant tree-to-tree variation in time and period for sap exudation. When amount of sap exudation was above 10 liter/day, the mean air-temperature was averaged at $1.2{\pm}1.6^{\circ}C$, the minimum at $-4.3{\pm}1.5^{\circ}C$ and the maximum at $11.8{\pm}1.9^{\circ}C$. The maximum air temperature and mean air temperature were significant (p < 0.05) factors for amount of sap in correlation analysis to explain date-to-date variation in sap exudation. Sucrose content in sap was in the range of 1.5 and 1.7% during exudation days, but sharply reduced to 0.6% level at the end of exudation period.

The Application of Fuzzy Logic to Assess the Performance of Participants and Components of Building Information Modeling

  • Wang, Bohan;Yang, Jin;Tan, Adrian;Tan, Fabian Hadipriono;Parke, Michael
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.4
    • /
    • pp.1-24
    • /
    • 2018
  • In the last decade, the use of Building Information Modeling (BIM) as a new technology has been applied with traditional Computer-aided design implementations in an increasing number of architecture, engineering, and construction projects and applications. Its employment alongside construction management, can be a valuable tool in helping move these activities and projects forward in a more efficient and time-effective manner. The traditional stakeholders, i.e., Owner, A/E and the Contractor are involved in this BIM system that is used in almost every activity of construction projects, such as design, cost estimate and scheduling. This article extracts major features of the application of BIM from perspective of participating BIM components, along with the different phrases, and applies to them a logistic analysis using a fuzzy performance tree, quantifying these phrases to judge the effectiveness of the BIM techniques employed. That is to say, these fuzzy performance trees with fuzzy logic concepts can properly translate the linguistic rating into numeric expressions, and are thus employed in evaluating the influence of BIM applications as a mathematical process. The rotational fuzzy models are used to represent the membership functions of the performance values and their corresponding weights. Illustrations of the use of this fuzzy BIM performance tree are presented in the study for the uninitiated users. The results of these processes are an evaluation of BIM project performance as highly positive. The quantification of the performance ratings for the individual factors is a significant contributor to this assessment, capable of parsing vernacular language into numerical data for a more accurate and precise use in performance analysis. It is hoped that fuzzy performance trees and fuzzy set analysis can be used as a tool for the quality and risk analysis for other construction techniques in the future. Baldwin's rotational models are used to represent the membership functions of the fuzzy sets. Three scenarios are presented using fuzzy MEAN, AND and OR gates from the lowest to intermediate levels of the tree, and fuzzy SUM gate to relate the intermediate level to the top component of the tree, i.e., BIM application final performance. The use of fuzzy MEAN for lower levels and fuzzy SUM gates to reach the top level suggests the most realistic and accurate results. The methodology (fuzzy performance tree) described in this paper is appropriate to implement in today's construction industry when limited objective data is presented and it is heavily relied on experts' subjective judgment.

The Forest Landscape Management of Therapeutic Forests by Visual Preference on the Simulation of Tree Density (임목밀도 시뮬레이션의 시각적 선호도를 통한 치유의 숲 산림경관 관리)

  • Lee, Yeon Hee;Kim, Ki Weon
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.4
    • /
    • pp.648-655
    • /
    • 2012
  • This research is aimed at suggesting the reasonable guideline for managing tree density of a therapeutic forest to enhance the therapeutic efficiency. To obtain visually preferable tree density for 4 coniferous tree species; Pinus koraiensis, Chamaecyparis obtusa, Pinus densiflora, Larix kaempferi, the simulations of tree density according to the 3 diameter classes are used. 250 people participated in questionnaire and 239 people of them were analyzed. The tree density preferences of 4 tree species are as follows; Pinus koraiensis forest; tree density for trees with Diameter (DBH=D)<25 cm about 816/ha, tree density for trees with 25=D<40 about 400/ha and tree density for trees with 40=D about 277/ha. Chamaecyparis obtusa forest; tree density for trees with D<25 about 625/ha, tree density for trees with 25=D<40 about 625/ha and tree density for trees with 40=D about 400/ha. Pinus densiflora forest; tree density for trees with D<25 about 816/ha, tree density for trees with 25=D<40 about 625/ha and tree density for trees with 40=D about 400/ha. Larix kaempferi forest; tree density for trees with D<25 about 625/ha, tree density for trees with 25=D<40 about 625/ha and tree density for trees with 40=D about 277/ha.

A Development of a Tailored Follow up Management Model Using the Data Mining Technique on Hypertension (데이터마이닝 기법을 활용한 맞춤형 고혈압 사후관리 모형 개발)

  • Park, Il-Su;Yong, Wang-Sik;Kim, Yu-Mi;Kang, Sung-Hong;Han, Jun-Tae
    • The Korean Journal of Applied Statistics
    • /
    • v.21 no.4
    • /
    • pp.639-647
    • /
    • 2008
  • This study used the characteristics of the knowledge discovery and data mining algorithms to develop tailored hypertension follow up management model - hypertension care predictive model and hypertension care compliance segmentation model - for hypertension management using the Korea National Health Insurance Corporation database(the insureds’ screening and health care benefit data). This study validated the predictive power of data mining algorithms by comparing the performance of logistic regression, decision tree, and ensemble technique. On the basis of internal and external validation, it was found that the model performance of logistic regression method was the best among the above three techniques on hypertension care predictive model and hypertension care compliance segmentation model was developed by Decision tree analysis. This study produced several factors affecting the outbreak of hypertension using screening. It is considered to be a contributing factor towards the nation’s building of a Hypertension follow up Management System in the near future by bringing forth representative results on the rise and care of hypertension.

A Study on the Hydrologic Decision-Making for Drought Management : 2. Decision-Making Method for Drought Management (가뭄관리를 위한 수문학적 의사결정에 관한 연구 : 2. 가뭄관리를 위한 의사결정 방법)

  • Kang, In-Joo;Yoon, Yong-Nam
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.5
    • /
    • pp.597-609
    • /
    • 2002
  • This study suggests a methodology of hydrologic decision making for the establishment of a standard of drought management from the drought analysis by the past drought history and for the drought monitoring and management according to drought processing. The construction and analysis of a decision tree diagram are performed and the step by step plan according to drought severity is suggested. Say, the decision tree diagram is constructed by the transition probability and quantity of monthly precipitation. Then the drought processing is investigated by the analysis of diagram and the 3-step of drought notice, drought warning, and emergency plan are established. The suggested methology in this study can be used for the other area and the decision tree diagram be used by changing the diagram according to the utilization purposes. Also, the choice of monthly PDSI class and precipitation analysis can be performed by the continuous data supplement. And so, a new standard value by the modified diagram is provided and the continuous drought management will be possible.

A Study on the Transplantation Methods of Large Trees - The Case of Celtis Sinensis in Chonan and Ginkgo biloba in Andong - (대형 수목의 이식공법 - 천안시 팽나무와 안동시 은행나무 사례 -)

  • 임재홍;이재근;김학범
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.4
    • /
    • pp.92-104
    • /
    • 2002
  • This study investigates, analyzes, and summarizes Dansplantation techniques and methods through practical methodology centering on fieldwork in order to present effective planting methods for large trees that have important significance. The conclusions are as follows : 1. The transplantation process of a large tree generally consists of the stages of digging up a tree, manufacturing a carrier frame, loading the tee on a vehicle, transporting, transplanting the tree, installing a strut and maintaining and managing the new transplant. In addition, planting a tree on a mounted place includes the primary procedures of trimming out the root, and preparing for transplanting the tree on a mounted place, as well as the secondary work of trimming out the root, transplanting a tree on a mounted place, maintenance and management. 2. In order to decide on a transplantation method for a large-sized tree, a structure calculation has to be performed first. That is, one must calculate the weight of the tree and the allowable stress of the strut (H-beam, etc.) fhst and then decide on the upper method through computer modeling based upon this structural calculation. 3. As a result of the analysis of a transplanted tree using the life soil method, it was confirmed that large quantities of feeder roots had developed around the root within a short time after the transplantation. The life soil method has proven to be very effective for transplantation of large-sized trees. 4. As for the production method of an H-beam strut frame, it was found that the manufacturing process and disassembly process were simple and proper; therefore, the H-beam frame is an appropriate structure to be used in the transplantation of large trees. 5. The concavo-convex method, which consists of filling the life soil in the concavo-convex area around the root, was found to be a method that promotes the growth of feeder roots within a short period of time and saves the supply of water at the same time.