• Title/Summary/Keyword: Transportation Project

Search Result 604, Processing Time 0.025 seconds

Development of Decision Model and Management System to minimize Pavement Utility Cut for Road Facility (도로시설 재굴착 방지를 위한 의사결정모델 및 관리시스템 개발)

  • Cho, Jin-Young;Jang, Oun-Sung;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.164-171
    • /
    • 2013
  • In urban planning, road facility is used not only for the transportation purpose but also for the utility line space purpose such as electrical, gas, tele communication, heating, water, sewer, and so on. However, since these utilities are built by many different groups, it becomes very difficult to communicate each other. Delay in one party can cause another party's schedule delay but they don't commuicate often. Also, some delay in utility work can cause frequent pavement cut. And, this will impact on construction cost, schedule delay, low quality, user complain and cost. This study developed spatiotemporal decision model to prevent prequent utility cut for mega project such as new urban development project. In addition, this study developed utility cut management system to manage utility cut schedule under pavement. Finally, developed system was applied to new urban development project and verified there effectiveness.

A Study on Actual Condition Analysis of Solar Thermal System Demonstrative Enterprise in the J City (J시 태양열 시범사업의 실태조사.분석에 관한 연구)

  • Yoo, Dong-Chul;Lee, Doo-Ho;Lee, Eung-Jik
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.80-85
    • /
    • 2011
  • As the instability of oil prices rose because of the situation in Libya, oil prices worldwide recorded the highest level due to the interference in supply. And so, in the 21st century, increasing efforts are being made to use clean new renewable energy centered on solar energy in accommodation of the cycle of nature instead of being reliant on the oil exporting nations. In order to reduce city energy internationally, the implementation of a low carbon city under the combined cooperation of industrial. construction, new renewable energy and transportation sectors with continuous development centered on low carbon green urban planning is now becoming established as the paradigm of the times. Recently, the government has begun carrying out the One Million Green Home Project, which is a project where the government with the goal of providing one million renewable energy homes by 2020 gives renewable energy subsidization for a partial amount of the standard unit price of installation when solar ray, solar heat, geothermal heat, small wind power or fuel cell energy is used. Thus, through this thesis which studies the state of and surveys the green village at Shingok-ri Songhak-myun Jaecheon-shi, it is the desire that the One Million Green Homes Project will be more efficiently developed and plans for improvement formed so that a high level of satisfaction in the product will be provided.

  • PDF

Effects of Hydrogen in SNG on Gas Turbine Combustion Characteristics (합성천연가스의 수소함량 변화에 따른 가스터빈 연소특성 평가)

  • Park, Se-Ik;Kim, Ui-Sik;Chung, Jae-Hwa;Hong, Jin-Pyo;Kim, Sung-Chul;Cha, Dong-Jin
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.23 no.4
    • /
    • pp.412-419
    • /
    • 2012
  • Increasing demand for natural gas and higher natural gas prices in the recent decades have led many people to pursue unconventional methods of natural gas production. POSCO-Gwangyang synthetic natural gas (SNG) project was launched in 2010. As the market price of natural gas goes up, the increase of its price gets more sensitive due to the high cost of transportation and liquefaction. This project can make the SNG economically viable. In parallel with this project, KEPCO (Korea Electric Power Corporation) joined in launching the SNG Quality Standard Bureau along with KOGAS (Korea Gas Corporation), POSCO and so on. KEPCO Research Institute is in charge of SNG fueled gas turbine combustion test. In this research, several combustion tests were conducted to find out the effect of hydrogen contents in SNG on gas turbine combustion. The hydrogen in synthetic natural gas did not affect on gas turbine combustion characteristics which are turbine inlet temperature including pattern factor and emission performance. However, flame stable region in ${\Phi}$-Air flow rate map was shifted to the lean condition due to autocatalytic effect of hydrogen.

Effects of Interdisciplinary R&D on Technology Commercialization (다학제적 연구개발이 기술사업화에 미치는 영향에 관한 연구)

  • Baek, Seung-Hee;Lee, Hokyu
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.1
    • /
    • pp.28-37
    • /
    • 2019
  • Various fields are being combined and developed for the development of the country and industry. The purpose of this study is to examine the effects of interdisciplinary research on the technology commercialization of researchers in the national R&D project. For the purpose of empirical analysis, major research and development have been reviewed. Major research and development projects conducted by government-funded research institution in which various technological fields are integrated in order to commercialize technology. The research data is based on the major R&D project data for railway/public transportation/logistics fields technology in 2015-17, and 149 project were selected for analysis. As a result, it was found that diversity of participants' experts had significant positive effect on technology commercialization when R&D expense, The number of research participants, The number of participating organizations, TRL before R&D were controlled. It is expected that the results of this study will be used meaningfully when the R&D program plan, analysing the academic convergence factor of research topic.

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.

Study on Improving Environmental Impact Assessment of Carbon Sink in the Greenhouse Gas Evaluation Criteria for Railway Construction Projects for Carbon Neutrality (탄소 중립을 위한 철도 건설 사업 온실가스 평가항목의 탄소흡수원 분야 환경영향평가 개선 방안 연구)

  • Hwang, Jin-hoo;Namuun, Tuvshinjargal;Won, Joo-hee;Kim, Min-jeong;Park, Da-hye;Jeon, Seong-woo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.26 no.3
    • /
    • pp.43-55
    • /
    • 2023
  • The railway project is an essential green transportation tool that is considered suitable for the domestic and foreign policy direction of carbon neutrality, but there are some limitations, such as damaging important carbon absorption sources during construction. This study analyzed the environmental impact assessment related to carbon absorption sources of greenhouse gas evaluation items conducted during the railway project, and limitations and implications were derived. The analysis of environmental impact assessment guidelines related to railway projects and carbon absorption sources dealt with prediction and reduction methods related to carbon absorption sources, but guidelines, including environmentally friendly railway construction guidelines, lacked descriptions. Since the greenhouse gas environmental impact assessment, 83 railway project environmental impact assessments have been reviewed, but in some cases, carbon absorption-related predictions have not been implemented, or carbon absorption-related reduction measures have been insufficient. In addition, there were cases where there was a limit to calculating emissions and reduction or where the reduction value was insignificant compared to emissions. In order to supplement the environmental impact assessment in the field of carbon absorption sources related to railway construction projects, alternatives such as quantitative emission and low reduction calculation, review of the no net loss system using the total environmental resource system, and linkage with climate change impact assessment are needed.

A Study on the Construction Demand for Network of Metro Railroad in Busan-Ulsan-Gyeongnam Area - In the place of National Road No.7 - (부울경 광역도시철도망 구축 필요성에 관한 연구 - 국도 7호선 중심으로 -)

  • Choi, Yang Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.6D
    • /
    • pp.771-778
    • /
    • 2011
  • Preliminary feasibility study on Busan metro line #1 in Yangsan line (Nopo-Bukjeong) depending on active volume of mass transportation between Yangsan city and Busan city was conducted. As the study concluded that it's valid, the necessity to establish the metro railroad network connecting to Busan, Ulsan and Gyeongnam Province is demanded to improve the transportation issues in Ungsang area vulnerable to metro service and to drive the balanced development between metropolitan cities. In addition, the volume of transportation depending on methods in target areas and road traffic assignment are surveyed to put a stress on the necessity to establish the metro railroad network. As the demand of transportation for alternative lines is predicted, the budget and benefits for construction for each alternative line set for the rough economic analysis depending on traffic volume for each method and traffic assignment results. The total project budget necessary for construction of proposal line #1 set as effective one among target three lines in this project is calculated in 794.32 billion won. Construction accounts for the most expensive in expenses for project and contingency allowances, purchases for vehicles and collateral expense are followed in orders. However, compensation for lands is not counted. In particular, according to economic analysis in proposal #1, ratio of benefit/cost (B/C) is 0.584, net present value (NPV) is -217.47 billion won, the internal rate of return (IRR) is analyzed in 0.604 %. At the current stage, it is not economically feasible, but the B/C is 0.737 in long-term upon construction of Yangsan line between Wolpheong and Yongdang which is proposal line #3. Therefore, when Busan metro basic plan is reorganized to aim the benefit of residents in Ungsang area vulnerable to the metro service, we think it must be necessary to establish the metro railroad network connecting to Busan-Yangsan-Ulsan which is proposal line #2 by extending the existing Sinjeong line and including this task line in high-ranked plan related to metro railroad.

Evaluations of Life Cycle Assessment on Indium-Tin-Oxide Electrochemical Recycling Process (디스플레이 투명전극용 인듐-주석-산화물의 전기화학적 재활용 공정에 관한 전과정 평가)

  • Kim, Raymund K.I.;Lee, Na-Ri;Lee, Soo-Sun;Lee, Young-Sang;Hong, Sung-Jei;Son, Young-Keun;Hong, Tae-Whan
    • Clean Technology
    • /
    • v.19 no.4
    • /
    • pp.388-392
    • /
    • 2013
  • Iindium-tin-oxide (ITO) material was had to use in display application as transparent electrode. However it would be problems comes up, the depletion of indium, tin and energy consumption of production process. Therefore recently trend was demanded alternative ITO material and recycling/reused ITO. In this conditions, the environmental impact have to express correct value about recycling/reused ITO process. The life cycle assessment was valuable method in this process. Thus first step was carried out separating in/out put (material) sources and then, exactive data base (DB) was applied. The result of environment impact was calculated by affect categories and recycling rate was set to 34% (This value was measured in previous project). The rate (g) of ITO material was calculated by chemical equivalent. In result, environmental impact were revealed acidification potential and abiotic depletion and if do not recycle/reuse ITO, $ 476 per 1 ton waste in land.

A Study on Practical Method of Utility Curve for Deciding Priority Order of the Improvements in Traffic Safety Audit (교통안전진단 개선방안들의 우선순위 산정 연구)

  • Choi, Ji Hye;Kang, Soon Yang;Hong, Ji Yeon;Lim, Joon Beom
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.3
    • /
    • pp.143-155
    • /
    • 2016
  • Recently, a massive loss of life and property is occurring in Korea due to traffic accidents, with the rapid increase in cars. For improvement of traffic safety, the Korea Transportation Safety Authority intensively analyzes accident data in local governments with low traffic safety index, performs a field investigation to extract problems and offers local governments improvements for problems, by conducting the 'Special Survey of Actual Conditions of Traffic Safety' each year, starting 2008. But local governments cannot strongly push forward the improvement projects due to the limited budget and the uncertainty of the improvement plan effects. Therefore, this study suggested a model which applied the Utility concept to the AHP theory, in order to efficiently decide a priority of the improvement plans in accident black spots in consideration of the limited budget of local governments. The number of accidents in each spot for improvement and accident severity, traffic volume, pedestrian volume, the improvement project cost and the accident reduction effect were chosen as evaluation factors for deciding a priority, and data about the improvement plan costs and the accident reduction effects, traffic accidents and traffic volume in the spots to undergo the special research on the real condition of traffic accident in the past were collected from the existing studies. Then, regression analysis was carried out and the Utility Curve of each evaluation factor was computed. Based on the AHP analysis findings, this study devised a priority decision method which calculated the weight and the utility function of each evaluation factor and compared the total utility values. The AHP analysis findings showed that among the evaluation factors, accident severity had the biggest importance and it was followed by the improvement plan cost, the number of accidents, the improvement effect, traffic volume and pedestrian volume. The calculated utility function shows a rise in utility, as the variables of the 5 evaluation factors; the number of accidents, accident severity, the improvement plan effect, traffic volume and pedestrian volume increase and a fall in utility, as the variables of the improvement plan cost increase, since the improvement plan cost is included in the budget spent by a local government.

A Study on the Socio-economic Direct Effects of the Opening of the Gyeongbu Expressway for 50 Years (경부고속도로 개통 50년의 사회경제적 직접효과 평가 연구)

  • Yoo, Dayoung;Park, Byeonghun;Hong, Jungyeol;Choi, Yoonhyuk;Shon, Euiyoung;Park, Dongjoo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.20 no.1
    • /
    • pp.119-131
    • /
    • 2021
  • This study quantitatively derived the direct socio-economic effects of the Gyeongbu Expressway, which opened in 1970, and suggested a methodological approach for more reliable results. The scenario was set when the Gyeongbu Expressway was not constructed in 1970, the opening of the Gyeongbu Expressway was delayed by 10 years, and the toll road between Seoul and Daejeon, or between Seoul and Gangneung was opened instead of the Gyeongbu Expressway as suggested by the World Bank. In addition, direct benefits were estimated by calculating and comparing the current vehicle operating costs, travel time costs, traffic accident costs, and environmental pollution costs. As a result, it was estimated that about 351 trillion won in direct benefits occurred, and it can be seen that the promotion of the construction project of the Gyeongbu Expressway at that time had a huge impact on South Korea's social economy.