• Title/Summary/Keyword: Traffic opening time

Search Result 52, Processing Time 0.027 seconds

A Development of Strength Prediction Model of Epoxy Asphalt Concrete for Traffic Opening (교통개방을 위한 에폭시 아스팔트 콘크리트의 강도 예측모델 개발)

  • Baek, Yu Jin;Jo, Shin Haeng;Park, Chang Woo;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.599-605
    • /
    • 2012
  • It is important to decide traffic opening time for construction plan of epoxy asphalt pavement. For this purpose, strength prediction model of epoxy asphalt concrete is required. In this study, Marshall stability was measured according to temperature and time for making strength properties equation. Strength prediction model was developed using chemical kinetics considering temperature variation. The traffic opening time of epoxy asphalt pavement on bridge deck has been predicted using the developed model. The prediction and actual traffic opening times were different by 17-days, because weathers of year 2009-2011 used in prediction model were different from weather of year 2012. When the prediction model used the actually measured temperatures of pavement, the difference between real opening time and prediction opening time was two days. The correlation analysis result between measured strength and prediction strength revealed that the $R^2$ using accurate temperature of pavement was 0.95. An improved precise prediction result is to be obtained if the prediction model uses accurate temperature data of pavement.

Opening to traffic 3 annual after KTX train interior noise quality analysis (개통 3주년 이후 KTX 열차 차내 소음 특성 분석)

  • Lee, Chan-Woo;Kim, Jae-Chul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.899-902
    • /
    • 2007
  • The KTX train which brings April 2004 high-speed railroad commerce operation time is operated currently Kyungbu line Seoul-Gwangmyeong-Daejeon-Dongdaegu-Pusan and Honam line Youngsan-Gwangmyeong-Seodaejeon-Kwangju/Mokpo. The high-speed railroad opening to traffic after KTX train interior noise follows in railway line quality change and it is changing together. From the research which it sees until opening to traffic after present time of the KTX vehicle it executed an interior noise quality change from Kyungbu line.

  • PDF

Early Traffic Opening-Capable Continuous Multi-Layer Asphalt Pavement Maintenance Method Using Electric Arc Furnace Slag Aggregate and Emulsified Asphalt (전기로슬래그 혼합골재를 이용한 조기교통개방이 가능한 연속 적층식 상온 아스팔트포장 유지보수 공법)

  • Kim, Wan-Sang;Lee, Suck-Hong;Kwon, Mun-Hyun;Choi, Do-Sun
    • 한국방재학회:학술대회논문집
    • /
    • 2007.02a
    • /
    • pp.117-120
    • /
    • 2007
  • The main purpose of this paper is to introduce the early traffic opening-capable continuous multi-layer asphalt pavement maintenance method using electric arc furnace slag aggregate and emulsified asphalt to the actual construction sites. As well known, the previous surface treatment method of emulsified asphalt mixture have various shortcomings such as long work-time, traffic congestions, plastic deformation and poor evenness. Thus, the proposed method has enabled tile early traffic opening by utilizing the optimized emulsified asphalt after consideration of the climate and road conditions in Korea. The application of the electric furnace slag with $6\;{\sim}\;18\;mm$ thickness is helpful to become a environment-friendly construction method. And also, it has been improved enough to accommodate night-time works of mechanized construction activities for wearing course and control course.

  • PDF

A Development of Prediction Model for Traffic Opening Time of Epoxy Asphalt Pavement Using Nonlinear Curve Fitting (비선형 커브피팅을 이용한 에폭시 아스팔트 포장의 교통개방 예측 모델 개발)

  • Jo, Shin Haeng;Kim, Nakseok
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.3
    • /
    • pp.324-331
    • /
    • 2013
  • Epoxy asphalt concrete is used to reduce dead load and to increase durability on long-span steel bridge overlay. The strength development properties of epoxy asphalt concrete are affected by time and temperature because epoxy asphalt is two-phase reactive materials. The strength development of epoxy asphalt concrete should be predicted precisely to decide traffic opening time. Based on this background in mind, the prediction model for traffic opening time for epoxy asphalt pavement was proposed in this research. The developed model using nonlinear curve fitting revealed R2 value of 0.943 while the R2 value of the existing model using chemical kinetics was 0.806. An improved precise prediction result is to be obtained when the prediction model uses accurate temperature data of pavement.

Evaluation of the Traffic Congestion in the Passage I of Pusan Harbour due to the Opening of the Extended Terminal adjacent to the Gamman Terminal and Other Port Developments (감만부두 확장구역 개장과 기타 항만개발이 장래 부산 북항에 미치는 해상교통 혼잡도 평가에 관하여)

  • 구자윤;여기태
    • Journal of Korean Port Research
    • /
    • v.14 no.1
    • /
    • pp.27-35
    • /
    • 2000
  • In Pusan Harbour, new port development projects are implemented such as the Extended Terminal adjacent to the Gamman Terminal, Pusan New Port, the Navy $\bigcirc$$\bigcirc$ piers, etc. which will require new marine traffic environments in the Passage I of Pusan Harbour. Specially, the turning basin of the Extended Terminal adjacent to the Gamman Terminal has been designed to overlay the Passage I of Pusan Harbour, which will interrupt the inbound traffic flow and the results will be worried to decrease the efficiency of port operation. Therefore, this paper will be aimed to evaluate the traffic congestion in the Pusan Passage I due to the opening of new ports within Pusan Harbour in 2006 and 2011 by using computer simulation based the queueing theory.

  • PDF

A Study on Scale Analysis of the Induced Traffic by Survey (이용자 설문을 통한 유발수요 규모 분석 - 광명역 고속철도 이용자를 중심으로 -)

  • Jo, Chang-Hee;Yu, Bo-Kuen
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.769-774
    • /
    • 2010
  • KTX Introduced in korea have occurred enhanced services and reduced regional travel time. "Induced traffic" is defined in the traffic demand generated in new project. 'Induced traffic' compared to the Diversion Demand Survey and research on ways to quantify the situation, insufficient analysis of constant and long-term observations are needed to estimate the changes in demand. In this study, Induced traffic effects due to the opening of KTX for analysis survey to passengers by Railway and the scale factor induced traffic review.

  • PDF

Field Application of High Strength Concrete by Cement Types Using Maturity (적산온도를 이용한 시멘트 종류별 고강도 콘크리트의 현장 적용성)

  • Kim, Dong Baek
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.472-478
    • /
    • 2020
  • Purpose: The purpose of the study is to help economic and safe construction by accurately predicting the initial strength of high-strength concrete (70MPa) for each type of cement, securing reliability of concrete quality, and drawing accurately the timing of form deformed, tensioning time of PS concrete, and openning of traffic after road repair with maturity. Method: Calculate the maturity by measuring the hydration heat with cement type for each age, and measure the strength of concrete with age to predict the strength corresponding to the any maturity. Result: In estimating the time required for traffic opening in road repair, ASTM C1074 was theoretically estimated at 16.4 hours for high-strength concrete, but in this study, maturity was calculated at 307, 14.4 hours for OPC and maturity at 2700, 34 hours for LHPC and maturity 200, 8 hours for ESPC. Conclusion: The timing of form deformed of structures using high-strength concrete and the opening of traffic of road repair may be much faster than in the case of concrete using OPC below the design basis strength 40MPa applied by ACI Committee 347.

A Study on Curing Level Prediction Model for Varying Chemical Composition of Epoxy Asphalt Mixture (에폭시 아스팔트 혼합물의 에폭시 화학 조성에 따른 양생수준 예측)

  • Jo, Shin Haeng;Kim, Nakseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.2
    • /
    • pp.465-470
    • /
    • 2015
  • The curing of epoxy asphalt mixture depends on the chemical reaction of epoxy resin and the curing agent. The curing level of epoxy asphalt mixture needs to be predicted in order to decide traffic opening time and to establish further construction plans. In this study, chemical analysis of the prediction model was executed to expand the applicability of the previous prediction model. Consequently, the curing level prediction model of epoxy asphalt concrete mixture was proposed using the concentration ratio and the acid value ratio. According to the results of outdoor curing experiments, the final prediction model showed that the correlation coefficient is greater than 0.971. Precise prediction results of different composition epoxy asphalt were obtained by reflecting the chemical composition ratios in the curing level prediction model.

Study of Kaesung Industrial Complex rail traffic increment (개성공단 철도운송 활성화 방안연구)

  • Cho, Chi-Hyun;Yoon, Dong-Hee
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.732-741
    • /
    • 2008
  • After freight train line opening between Munsan of South Korea and Bongdong of North Korea last December 2007, people's expectation and interest about trans North-South and continental railways have been increasing. However, the commercial traffic of freight by train has not been increased as much as we expected in the mean time road traffic is more increased. This study examined the Kaesong industrial complex which has a high rail accessibility. Especially, we interviewed the owners of enterprises in Kaesong to integrate their opinions for deriving the problems and improving the business conditions. Also, this study embodied the methods for improving rail freight traffic between North and South Korea. Based on this study, we expect more research will carry out on this field to reform the operation system of trans Korea railways by Kaesong industrial complex development project and the commercial reconversion from road to rail.

  • PDF