• Title/Summary/Keyword: Track Quality

Search Result 335, Processing Time 0.033 seconds

Introduction of Track Quality Index(TQI) Methods using Track Induction Data (궤도검측데이터를 활용한 궤도품질지수 산출 방법론 고찰)

  • Kim, Nam-Hong;Lee, Syeung-Yeol;Won, Yong-Hoan;Kim, Kwan-Hyung;Lee, Sung-Uk
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.66-72
    • /
    • 2009
  • In order to forecast the progress of the track irregularity, we should observe the long-term track quality and divide a track into some separated divisions which have homogeneous property. For this, we define the division of track which has homogeneous property as a 'Segment' and manage the 'TQI(Track Quality Index)' using track induction data based on each segment. In this study, we introduce some methods of estimating track quality and figure out the TQIs of sample section using new FRA TQI method. In addition, we conducted a basic study of the forecasting model for the progress of track irregularity by analyzing track maintenance data.

  • PDF

A Study on the Track Irregularity Index for the Estimation of Track Quality (궤도품질평가를 위한 궤도틀림 지표에 대한 연구)

  • 오지택;한승용
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.450-457
    • /
    • 2000
  • This paper establishes a scheme to estimate track quality using standard deviation and deterioration rate of track irregularities. To provide index of quality, standard deviation and deterioration rate of track irregularities are analyed. As an index, standard deviation and deterioration rate were applied to decision of corrective maintenance and replacement maintenance, respectively. Further, this paper proposes a basic scheme for a modernization of mechanize track maintenance that using MTT(Multiple Tie Tamper) and Ballast Cleaner.

  • PDF

Evaluation of Rail pad Stiffness Considering Stress of Rail (레일응력을 고려한 레일패드강성 결정)

  • Park, Dae-Geun;Kim, Jae-Hak;Son, Gi-Jun;Kim, Han-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.419-431
    • /
    • 2007
  • The track and rail surface geometry is of prime importance on the requirement for track dynamic stiffness, particularly for the speed of 350 km/h, for which both the requirement for fatigue and tensile strength limits require a lower stiffness than 100 kN/mm, which is near the value for ballasted track. However, the track quality has been considered as being the same for 350 km/h as that for 300 km/h, and based on ballasted track, and the track geometry may be kept in better condition with a slab track(probably more similar to the medium quality track geometry of ballasted track). In conclusion, under the condition that the track geometry quality provided by the concrete slab system is fairly good, and that the required maintenance is applied to the rail surface, there would be no safety risk if the fastening system point stiffness reaches 160 kN/mm for 300 km/h operation, and 110 N/mm at 350 km/h.

  • PDF

The Parametric Study on the Performance Characteristics of Elastic Rail Fastening System on the Sharp Curved Track (급곡선 탄성레일체결장치의 거동특성에 미치는 매개변수 연구)

  • Baik, Chan-Ho;Joo, Bong-Gyu;Choi, Jung-Youl;Choi, Il-Yoon;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2163-2173
    • /
    • 2011
  • In this study, the deformations and stresses occurred in the elastic rail fastening system were evaluated according to applied extreme track forces based on various field conditions, track curvature and poor properties. The purpose of this study is to establish a method for efficient management and suggest guide line for track construction in order to secure the performance quality of the elastic rail fastening system on the sharp curved track.. Therefore, initial construction qualities of rail and concrete bed, initial clamping force and applied extreme track forces were used into experiment as several parameters. Using these test results, the performance characteristics of the elastic rail fastening system were also evaluated. As a result, it suggested the method to secure long-term durability of fastening system and comparing sharp curved track to results on field test.

  • PDF

A New Slab Track System (새로운 슬래브궤도 시스템)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

Development of Rail Profile Measurement System using High Speed Laser Image Processing (고속영상처리에 의한 레일형상측정시스템 개발)

  • Moon, Chul-Yi;Kim, Man-Chul
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1320-1325
    • /
    • 2006
  • Railway track supports and guides train and it directly affects ride quality and safety. To maintain track quality, regular maintenance activity is essential but it degrades track usage since maintenance activity occupies the track during the work. To achieve maximum track efficiency, track inspection should be performed at commercial running speed. In this paper, we designed and developed high speed rail profile measurement system using laser light sectioning method with line laser generator, digital camera and DSP based image processing system. The measurement system can supports rail profile measurement at the speed of 300 Km/h that can be applied to KTX.

  • PDF

Evaluation on Structural Stiffness and Grouting Efficiency of Concrete Track using Elastic Wave Tests (탄성파 기법을 이용한 콘크리트궤도의 구조강성 및 충전상태 평가에 관한 연구)

  • Lee, Il-Wha;Joh, Sung-Ho;Jang, Seung-Yup
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.55-64
    • /
    • 2009
  • Recently, concrete track is replacing ballast track for efficient and economic maintenance of track. It considerably offer less maintenance, a longer service life and reduced life-cycle costs. With the aim of achieving high-quality track construction work, of developing tools for quality assurance in new construction and for later technical inspection of material condition, a quality strategy has to be developed. For these purpose, NDT which is using the seismic wave has carried out in situ studies in the test construction section. The used NDT are SASW test, impact echo test and continuous impact echo test. The test is performed 5,353 times on 49 pre-cast concrete track panels to verify the stiffness structure and grouting efficiency of the track structure. To conclude, because of the non-homogeneous characteristic of concrete material. it is restricted to apply the elastic wave test at some aspect. However it is possible to acquisite a sufficient reliability about structural stiffness and grouting efficiency of concrete track.

An Analysis of the Track Irregularity Progress on the Various Track System in Urban Transit (도시철도 궤도시스템별 틀림진전에 대한 분석)

  • Ko, Jae-Hyun;Kim, Man-Cheol;Lee, Jee-Ha;Cho, Jun-Gon;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.311-319
    • /
    • 2011
  • Track accompanies the process that track alignment by traffic loads is changed. A change of track alignment affects the running safety and riding comfort of train. This is called a track irregularity. The most important task in maintaining the track is to manage these track irregularity within quality parameters. Today, track maintenance of urban transit is enforcing immediate maintenance about section exceeding a safety standard by applying track recording data got through Integrated Measurement. This method is advantage of being easy of the maintenance assesment in case of the running safety, but is disadvantage of being difficult in case of the riding comfort of train. In this study, we propose track irregularity deviation of each track system depending on the time series and present about utilization plans of the Track Irregularity Progress Rate.

  • PDF

Irregularity Analysis of Maglev Test Track (자기부상열차 시험노선의 궤도틀림 분석)

  • Kim, Saang-Bum;Kang, Kee-Dong;Han, Hyung-Suk;Lee, Jong-Min
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2400-2404
    • /
    • 2011
  • Power spectral density (PSD) model of irregularities for the maglev test track is presented. Track irregularities (gauge, cant, twist and vertical) were calculated from the survey data of sleepers on the test track. PSD model was constructed from the estimated PSDs of each track irregularities. Versine (gauge, cant, twist, vertical and lateral) of the track is obtained and their PSDs were estimated, too. Presented PSD model can be used for the analysis of levitation stability and ride quality of the maglev system.

  • PDF

Evaluation of Maintenance Quantity and Life Cycle Costs of Railway Track Considering Evolution of Rail Fatigue Damage and Ballast Settlement According to Track Quality Level (궤도 품질수준에 따른 레일 피로 손상과 자갈 침하 진전을 고려한 철도 궤도 보수량 및 수명주기비용 평가)

  • Jun-Hyuck Choi;Seung-Yup Jang;Seung-Won You;Do-Yeop Kim;Hyung-Jo Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.4
    • /
    • pp.37-47
    • /
    • 2024
  • This study proposes a track maintenance quantity estimation model that considers evolution of rail fatigue damage and ballast settlement based on actual maintenance data from the Gyeongbu high-speed railway, and revises the existing life cycle cost (LCC) model for railway track. Using this model, maintenance quantities and life cycle costs based on different track quality levels are evaluated and discussed. According to the results, it is confirmed that applying the track maintenance quantity estimation model that accounts for rail fatigue damage and ballast settlement allows us to reasonably estimate maintenance costs close to the actual data. The track quality coefficient significantly influences both rail and ballast maintenance quantities, with ballast maintenance having a greater impact than rail maintenance. Additionally, as train speed increases, both rail and ballast maintenance quantities rise. Moreover, a higher track quality coefficient leads to a steeper increase in maintenance quantities with increasing train speed. Consequently, LCC also exhibits a faster growth rate over time with higher track quality coefficients and faster train speeds, resulting from an increased proportion of maintenance costs.