• Title/Summary/Keyword: Total Operation Time

Search Result 1,154, Processing Time 0.025 seconds

A Design of Dual Frequency Bands Time Synchronization System for Synchronized-Pseudolite Navigation System

  • Seo, Seungwoo;Park, Junpyo;Suk, Jin-Young;Song, Kiwon
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.3 no.2
    • /
    • pp.71-81
    • /
    • 2014
  • Time synchronization system using dual frequency bands is designed and the error sources are analyzed for alternative synchronized-pseudolite navigation system (S-PNS) which aims at military application. To resolve near/far problem, dual frequency band operation is proposed instead of pulsing transmission which degrades level of reception. In dual frequency operation H/W delay should be considered to eliminate errors caused by inter-frequency bias (IFB) difference between the receivers of the pseudolites and users. When time synchronization is performed across the sea, multipath error is occurred severely since the elevation angle between pseudolites is low so total reflection can be happened. To investigate the difference of multipath effects according to location, pseudolites are set up coastal area and land area and performances are compared. The error source related with tropospheric delay is becoming dominant source as the coverage of the PNS is broadening. The tropospheric delay is measured by master pseudolite receiver directly using own pseudorange and slave pseudorange. Flight test is performed near coastal area using S-PNS equipped with developed time synchronization system and test results are also presented.

Comparison of Outcomes after Atlantoaxial Fusion with Transarticular Screws and Screw-Rod Constructs

  • Kim, Ji Yong;Oh, Chang Hyun;Yoon, Seung Hwan;Park, Hyeong-Chun;Seo, Hyun Sung
    • Journal of Korean Neurosurgical Society
    • /
    • v.55 no.5
    • /
    • pp.255-260
    • /
    • 2014
  • Objective : The purpose of this study was to compare the radiological and neurological outcomes between two atlantoaxial fusion method for atlantoaxial stabilization; C1 lateral mass-C2 pedicle screws (screw-rod constructs, SRC) versus C1-2 transarticular screws (TAS). Methods : Forty-one patients in whom atlantoaxial instability was treated with atlantoaxial fixation by SRC group (27 patients, from March 2005 to May 2011) or TAS group (14 patients, from May 2000 to December 2005) were retrospectively reviewed. Numeric rating scale (NRS) for pain assessment, Oswestry disability index (ODI), and Frankel grade were also checked for neurological outcome. In radiologic outcome assessment, proper screw position and fusion rate were checked. Perioperative parameters such as blood loss during operation, operation time, and radiation exposure time were also reviewed. Results : The improvement of NRS and ODI were not different between both groups significantly. Good to excellent response in Frankel grade is shown similarly in both groups. Proper screw position and fusion rate were also observed similarly between two groups. Total bleeding amount during operation is lesser in SRC group than TAS group, but not significantly (p=0.06). Operation time and X-ray exposure time were shorter in SRC group than in TAS group (all p<0.001). Conclusion : Both TAS and SRC could be selected as safe and effective treatment options for C1-2 instability. But the perioperative result, which is technical demanding and X-ray exposure might be expected better in SRC group compared to TAS group.

Integrated Decision-making for Sequencing and Storage Location of Export Containers at a Receiving Operation in the Container Terminal with a Perpendicular Layout (수직 배치형 컨테이너 터미널 반입작업에서 수출 컨테이너의 작업순서와 장치위치 통합 의사결정)

  • Bae, Jong-Wook;Park, Young-Man
    • Journal of Navigation and Port Research
    • /
    • v.35 no.8
    • /
    • pp.657-665
    • /
    • 2011
  • This study deals with an integrated problem for deciding sequencing and storage location of export containers together at its receiving operation in the container terminal with a perpendicular layout. The preferred storage location of an export container varies with the priority of the corresponding loading operation and the waiting time of an external truck depends on its storage time. This paper proposes the mixed integer programming model considering the expected arrival time and expected finish time of an external truck and the preferred storage location for its loading operation. And we suggest the heuristic algorithm based on a simulated annealing algorithm for real world adaption. We compare the heuristic algorithm with the optimum model in terms of the computation times and total cost and the performance of the heuristic algorithm is analyzed through a numerical experiment.

Management and Outcome of Patients with Acetabular Fractures: Associated Injuries and Prognostic Factors

  • Yeo, Do-Hyun;Oh, Jong-Keon;Cho, Jae-Woo;Kim, Beom-Soo
    • Journal of Trauma and Injury
    • /
    • v.32 no.1
    • /
    • pp.32-39
    • /
    • 2019
  • Purpose: The aim of this study was to determine which factors contribute to the surgical treatment outcomes of acetabular fractures. Simultaneously, we aim to report on the treatment results after our hospital was designated as the focused training center for trauma. Methods: We conducted a retrospective review of all patients who experienced acetabular fractures from January 1, 2014 to May 1, 2017 and visited our hospital. Patients who had associated pelvic ring fractures or were lost to the one-year follow-up were excluded; a total of 37 fractures were evaluated. We evaluated the clinical results using the scoring system of Merle $d^{\prime}Aubign\acute{e}$ (MDA) and grade of Brooker for heterotopic ossification. Results: Thirty-seven patients (31 men and 6 women) were identified. The mean injury severity score (ISS) was 8.7, with 32.4% of patients having a score >15. The average blood transfusion in the first 24 hours was 0.54 pints. Falling was the most common injury mechanism (32.4%). Chest injury was the most common associated injury (16.2%), followed by head injury (13.5%). The posterior wall and both column fracture were the most common (37.8%) fracture patterns. Excellent and good clinical grades of MDA included 28 patients (75.6%) and fair and poor grades included nine (24.3%), respectively. Four patients were diagnosed with a post-operative infection (10.8%); one out of four patients who had co-morbidity died (2.7%), and another patient underwent a replacement surgery (2.7%). Multivariate analysis showed that age and operation time were associated with MDA. In addition, operation time and ISS were significant co-factors of the Brooker grade. Conclusions: Korea University Guro Hospital showed similar treatment results of acetabular fractures compared to other publications. The age and operation time were co-factors of the clinical outcome of this fracture. Additionally, increased operation time and injury severity score were suggested to increase the Brooker grade.

Comparison of catch rate by operation time of Korean tuna purse seine fishery in the Western and Central Pacific Ocean (중서부태평양 수역 우리나라 다랑어 선망어업의 시간대별 어획률 비교)

  • Young Shin, HA;Youjung, KWON;Mi Kyung, LEE;Sung Il, LEE
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.58 no.4
    • /
    • pp.317-325
    • /
    • 2022
  • Korean tuna purse seine fishery in the Western and Central Pacific Ocean (WCPO) began to operate in earnest in the early 1980s. Since then, the total catch has shown an increasing trend and the target species are skipjack tuna (Katsuwonus pelamis), yellowfin tuna (Thunnus albacare) and bigeye tuna (Thunnus obesus). Based on the operational data of Korean tuna purse seine fishery from 2016 to 2020, the catch rates of target species (skipjack and yellowfin tunas) were analyzed by operation time for set types (free school and FAD sets). In the case of the free school sets, they were usually made from sunrise to sunset, and the catch rate was high before and after sunrise for skipjack tuna and before sunset for yellowfin tuna. On the other hand, for the FAD sets, more than 90% of them were made just before sunrise, and there were few operations during the daytime. The purpose of this study is to examine whether there are differences in the catch rate of skipjack and yellowfin tunas by operation time and by school type for Korean tuna purse seine fishery in the WCPO, which could be helpful in understanding its fishing characteristics and providing useful information for developing the stock indices of the target species.

The Effects of a Trauma Team Approach on the Management of Open Extremity Fractures in Polytrauma Patients: A Retrospective Comparative Study

  • Sakong, Seungyeob;Lim, Eic Ju;Cho, Jun-Min;Choi, Nak-Jun;Cho, Jae-Woo;Oh, Jong-Keon
    • Journal of Trauma and Injury
    • /
    • v.34 no.2
    • /
    • pp.105-111
    • /
    • 2021
  • Purpose: Open extremity fractures require prompt antibiotic medication and initial debridement surgery to reduce the infection rate and restore functional stabilization. We aimed to report the effects and positive outcomes of a trauma team approach on the management of open extremity fractures in polytrauma patients. Methods: This retrospective review included all polytrauma patients with open extremity fractures admitted between March 2009 and December 2019. Patients were divided into two groups according to whether they were treated before or after the implementation of the trauma team approach (March 2014). We analyzed the outcomes in each group with respect to the time interval until the doctor's arrival, total length of stay in the emergency department, the time interval until initial antibiotic treatment and operation, whether the initial operation was performed within 24 hours, and the rate of deep infections. Results: A total of 123 patients met the inclusion criteria. There were no statistically significant differences in demographic characteristics. The time interval until the doctor's arrival (64.12±49.2 minutes vs. 19.82±15.23 minutes; p=0.035) and initial antibiotic treatment (115.47±72.12 minutes vs. 48.78±30.12 minutes; p=0.023) significantly improved after implementing the trauma team approach. The union rate was not significantly different. However, the time interval until initial debridement, opportunity for initial debridement within 24 hours, and the rate of deep infections demonstrated better results. Conclusions: The reduced time interval until initial antibiotic treatment and debridement could be attributed to the positive effect of the trauma team approach on the management of open extremity fractures in polytrauma patients.

A Study on Queuing Simulation for Determination of Optimun Lock Size (항구에 있어서 갑거(문)의 적정규모결정을 위한 대기행열의 모의조작에 관한 연구)

  • 김순근;김치홍
    • Water for future
    • /
    • v.12 no.1
    • /
    • pp.60-71
    • /
    • 1979
  • In general, the lock structure is built at place of having great deal range for dealing with effective ships operation such as in the west coast of Korea. In Inchon harbour, the two locks of 10 KT and 50 KT tonnage class in total has been constructed for several years age, however, it has been recorded many waiting vessels at outer harbour due to the increment of oceangoing vessels & shortage of berthing facilities in accordance with beyond expectation of cargo amount increment. This paper attempts to solves the waiting vessels problem at outer harbour by simulation in applying queing theory. It is found that the simulation results such as average queue time, service time, and queue length during lock operation can be applied to find the minimum of the cost function for determination of optimum Lock Size

  • PDF

A Study on the Simulation about Operation Availability under Maintenance Capacity and Repair Part Constraints (정비능력, 예비품 수량 제약조건 하에서의 운용가용도 시뮬레이션 연구)

  • Park, Se-Hoon;Moon, Seong-Am;Lee, Jung-Hwan
    • Korean System Dynamics Review
    • /
    • v.11 no.2
    • /
    • pp.119-138
    • /
    • 2010
  • This study introduces the system dynamics model that simulate total operational availability when 10 equipments made of 3 major components are serviced under the constrains of the maintenance capacity level and the number of spare parts. This simulation is designed on the base of reliability engineering concept so failures of components happens with the rule of engineering factors like the mean time between failure(MTBF) of component and the next failure time of one component is effected by the conditions of other components. We analysed availability of 10 equipments under 121 constrains and executed multiple regression analysis with the simulation result. The analysis provide the managerial insight in the service fields with operation many equipments.

  • PDF

A Proposal on the Marine Traffic Supporting System in VTS area

  • Lee, Hyong-Ki;Chang, Seong-Rok;Jeong, Gi-Nam;Park, Young-Soo
    • Journal of Navigation and Port Research
    • /
    • v.34 no.9
    • /
    • pp.693-698
    • /
    • 2010
  • In port and its approach channel, traffic accidents such as collision, aground, minor collision have reached about 77% of total marine casualty in the area. In this paper, an attempt to enhance the safe navigation was proposed by offering marine traffic supporting system which helps VTS operator assist vessel effectively with the quantitative assessment on difficulty of each vessel. The system collects navigation data from onboard AIS, assesses the data in assessment mode to analyze the navigation difficulties of each vessel and displays the degree of danger of each vessel on the ECDIS in real-time to decide the intervention time or order of priority for VTS operator. The effectiveness of the system was verified by the VTS operators in Korea.

A Study on Optimal Economic Operation of Hydro-reservoir System by Stochastic Dynamic Programming with Weekly Interval (주간 단위로한 확률론적 년간 최적 저수지 경제 운용에 관한 연구)

  • Song, Gil-Yong;Kim, Yeong-Tae;Han, Byeong-Yul
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.106-108
    • /
    • 1987
  • Until now, inflow has been handled an independent log-normal random variable in the problem of planning the long-term operation of a multi-reservoir hydrothermal electric power generation system. This paper introduces the detail study for making rule curve by applying weekly time interval for handling inflows. The hydro system model consists of a set of reservoirs and ponds. Thermal units are modeld by one equivalent thermal unit. Objective is minimizing the total cost that the summation of the fuel cost of equivalent thermal unit at each time interval. For optimization, stochastic dynamic programming(SDP) algorithm using successive approximations is used.

  • PDF