• Title/Summary/Keyword: Total Load

Search Result 2,605, Processing Time 0.034 seconds

Vacuum Characteristics of KSTAR ICRF Antenna during RF Operation (고주파 인가시의 KSTAR ICRF 안테나의 진공특성)

  • Bae, Young-Dug;Kwak, Jong-Gu;Hong, Bong-Geon
    • Journal of the Korean Vacuum Society
    • /
    • v.15 no.3
    • /
    • pp.314-324
    • /
    • 2006
  • The vacuum characteristics of the KSTAR ICRF antenna were experimentally investigated. The fabricated antenna was installed in the RF Test Chamber(RFTC) which has a vacuum system with an effective pumping speed of 1015 l/s. The time variations of RFTC pressure, total gas load and ultimate pressure were measured before the RF test. RF conditioning effect was studied by repeating RF pulses at low power level. A time variation of the RFTC pressure was measured during a RF power was applied to the antenna. Threshold pressure at which a RF breakdown occurs was investigated. Whenever the pressure was higher than $10^{-4}$ mbar, the RF breakdown occurred. During a long pulse testing, the temperature of the antenna and RFTC pressure were measured to investigate long pulse limitation of the maximum available voltage without any cooling, which were compared with testing results with a water cooling of the antenna.

Real-Time Sound Localization System For Reverberant And Noisy Environment (반향음과 잡음 환경을 고려한 실시간 소리 추적 시스템)

  • Kee, Chang-Don;Kim, Ghang-Ho;Lee, Taik-Jin
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.38 no.3
    • /
    • pp.258-263
    • /
    • 2010
  • Sound localization algorithm usually adapts three step process: sampling sound signals, estimating time difference of arrival between microphones, estimate location of sound source. To apply this process in indoor environment, sound localization algorithm must be strong enough against reverberant and noisy condition. Additionally, calculation efficiency must be considered in implementing real-time sound localization system. To implement real-time robust sound localization system we adapt four low cost condenser microphones which reduce the cost and total calculation load. And to get TDOA(Time Differences of Arrival) of microphones we adapt GCC-PHAT(Generalized Cross Correlation-Phase Transform) which is robust algorithm to the reverberant and noise environment. The position of sound source was calculated by using iterative least square algorithm which produce highly accurate position data.

Prospective randomized clinical trial of hydrophilic tapered implant placement at maxillary posterior area: 6 weeks and 12 weeks loading

  • Kim, Seong-Beom;Yun, Pil-Young;Kim, Sang-Yun;Yi, Yang-Jin;Kim, Ji-Yun;Kim, Young-Kyun
    • The Journal of Advanced Prosthodontics
    • /
    • v.8 no.5
    • /
    • pp.396-403
    • /
    • 2016
  • PURPOSE. Early loading of implant can be determined by excellent primary stability and characteristic of implant surface. The implant system with recently improved surface can have load application 4-6 weeks after installing in maxilla and mandible. This study evaluated the effect of healing period to the stability of hydrophilic tapered-type implant at maxillary posterior area. MATERIALS AND METHODS. This study included 30 patients treated by hydrophilic tapered-type implants (total 41 implants at maxilla) and classified by two groups depending on healing period. Group 1 (11 patients, 15 implants) was a control group and the healing period was 12 weeks, and Group 2 (19 patients, 26 implants) was test group and the healing period was 6 weeks. Immediately after implant placement, at the first impression taking, implant stability was measured using Osstell Mentor. The patients also took periapical radiographs after restoration delivery, 12 months after restoration and final followup period. The marginal bone loss around the implants was measured using the periapical radiographs. RESULTS. All implants were survived and success rate was 97.56%. The marginal bone loss was less than 1mm after 1 year postoperatively except the one implant. The stabilities of the implants were not correlated with age, healing period until loading, insertion torque (IT), the diameter of fixture and the location of implant. Only the quality of bone in group 2 (6 week) was correlated with the stability of implant. CONCLUSION. Healing period of 6 weeks can make the similar clinical prognosis of implants to that of healing period of 12 weeks if bone quality is carefully considered in case of early loading.

A Study on the Variation of Post Buckling Behaviour of 2-dimensional Shallow Arch Truss after Size Optimization (크기최적화 이후에 나타나는 2차원 얕은 아치 트러스의 후 좌굴 거동의 변화에 대한 연구)

  • Lee, Sang-Jin;Lee, In-Soo
    • Proceeding of KASS Symposium
    • /
    • 2008.05a
    • /
    • pp.107-112
    • /
    • 2008
  • This paper investigates the variation of post-buckling behaviours of 2-dimensional shallow arch type truss after sizing optimization. The mathematical programming technique is used to produce the optimum member size of 2D arch truss against a central point load. Total weight of structure is considered as the objective function to be minimized and the displacement occurred at loading point and member stresses of truss are used as the constraint functions. The finite difference method is used to calculate the design sensitivity of objective function with respect to design variables. The postbuckling analysis carried out by using the geometrically nonlinear finite element analysis code ISADO-GN. It is found to be that there is a huge change of post-buckling behaviour between the initial structure and optimum structure. Numerical results can be used as useful information for future research of large spatial structures.

  • PDF

Optimization for Precast Prestressed Wide-U Beams with the Least Depth (최소깊이 프리캐스트 프리스트레스트 U형보의 최적화)

  • Yul Sung-Yong
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.1 s.79
    • /
    • pp.18-26
    • /
    • 2004
  • The cost of underground work is a dominant factor to determine the total construction fee. It is generally 2 ${\~}$ 2.5 times higher than that of above ground for building with the same height. 'A new precast prestressed framing plan for underground parking building' was suggested with the beam of the least depth - U-type beams. The depth of regular rectangular reinforced concrete beam which is currently used in the underground parking of apartments could be reduced up to 12 ${\~}$ 34cm/story due to the development of a U-beams from the optimum process. Two full scale prototype U-beams were tested in this study. It was found that the Wide U-beams in the test showed higher strength than calculated nominal and design, however need to provide temporary supports to meet the flexural moment of construction load at the simply supported state before the lopping concrete hardens.

A Novel Third-Order Cascaded Sigma-Delta Modulator using Switched-Capacitor (스위치형 커패시터를 이용한 새로운 형태의 3차 직렬 접속형 시그마-델타 변조기)

  • Ryu, Jee-Youl;Noh, Seok-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.1
    • /
    • pp.197-204
    • /
    • 2010
  • This paper proposes a new body-effect compensated switch configuration for low voltage and low distortion switched-capacitor (SC) applications. The proposed circuit allows rail-to-rail switching operation for low voltage SC circuits and has better total harmonic distortion than the conventional bootstrapped circuit by 19 dB. A 2-1 cascaded sigma-delta modulator is provided for performing the high-resolution analog-to-digital conversion on audio codec in a communication transceiver. An experimental prototype for a single-stage folded-cascode operational amplifier (opamp) and a 2-1 cascaded sigma-delta modulator has been implemented m a 0.25 micron double-poly, triple-metal standard CMOS process with 2.7 V of supply voltage. The 1% settling time of the opamp is measured to be 560 ns with load capacitance of 16 pF. The experimental testing of the sigma-delta modulator with bit-stream inspection and analog spectrum analyzing plot is performed. The die size is $1.9{\times}1.5\;mm$.

Three Phase Embedded Z-Source Inverter (3상 임베디드 Z-소스 인버터)

  • Oh, Seung-Yeol;Kim, Se-Jin;Jung, Young-Gook;Lim, Young-Cheol
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.17 no.6
    • /
    • pp.486-494
    • /
    • 2012
  • In this paper, we proposes the three-phase embedded Z-source inverter consisting of the three embedded Z-source converters and it's the output voltage control method. Each embedded Z-source converter can produce the bipolar output capacitor voltages according to duty ratio D such as single-phase PWM inverter. The output AC voltage of the proposed system is obtained as the difference in the output capacitor voltages of each converter, and the L-C output filter is not required. Because the output AC voltage can be stepped up and down, the boost DC converter in the conventional two-stage inverter is unnecessary. To confirm the validity of the proposed system, PSIM simulation and a DSP based experiment were performed under the condition of the input DC voltage 38V, load $100{\Omega}$, and switching frequency 30kHz. Each converter is connected by Y-connection for three-phase loads. In case that the output phase voltage is the same $38V_{peak}$ as the input DC voltage and is the 1.5 times($57V_{peak}$), the simulation and experimental results ; capacitor voltages, output phase voltages, output line voltages, inductor currents, and switch voltages were verified and discussed.

A Parametric Study to Estimate the Behavior of a Piled Raft Foundation Influenced by Ground Conditions (지반조건이 Piled Raft 기초의 거동에 미치는 영향 평가를 위한 매개변수 연구)

  • You, Kwang-Ho;Jung, Yeun-Hak
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.8
    • /
    • pp.35-46
    • /
    • 2016
  • In this study, a sensitivity analysis was carried out by using numerical analysis under the consideration that it is difficult to analyze the behavior of real piled raft foundations on different ground conditions through a real scale test. The program used for numerical analysis is FLAC 3D based on the finite difference method. Piles were modelled by using pile element that is one of the structure elements of FLAC 3D and the ground and raft were modelled by using continuum element. With a fixed pile arrangement of $3{\times}3$, the diameter, length, space of piles, and ground conditions were selected as sensitivity parameters and their mutual correlation were investigated. As a result, the bigger and longer pile diameter, length and pile space are, the bigger the bearing capacity of the piled raft becomes. When pile space exceeded a specific value, however, the piled raft foundation behaved like a shallow foundation supported by only a raft. Also it can be confirmed that the better ground conditions are, the more total bearing capacity of the piled raft foundation increases.

Annual Energy Performance Evaluation of Zero Energy House Using Metering Data (실측데이터를 이용한 에너지제로주택의 연간 에너지성능평가)

  • Lim, Hee-Won;Yoon, Jong-Ho;Shin, U-Cheul
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.113-119
    • /
    • 2016
  • Purpose: In this study, we evaluate the annual energy performance of the detached house which was designed with the aim of zero energy. Method: The experimental house which was constructed in Gonju Chungnam in 2013, is the single family detached house of light weight wood frame with $100m^2$ of heating area. Thermal transmittance of roof (by ISO 10211) and building external walls are designed as $0.10W/m^2K$ and $0.14W/m^2$ respectively and low-e coating vacuum window glazing with PVC frame was installed. Also grid connected PV system and natural-circulation solar water heater was applied and 6kWp capacity of photovoltaic module was installed in pitched roof and $5m^2$ of solar collector in vertical wall facing the south. We analyzed the 2014 annual data of the detached house in which residents were actually living, measured though web-based remote monitoring system. Result: First, as a result, total annual energy consumption and energy production (PV generation and solar hot water) are 7,919kWh and 7,689kWh respectively and the rate of energy independence is 97.1% which is almost close to the zero energy. Second, plug load and hot water of energy consumption by category showed the highest numbers each with 33% and 31%, with following space heating 24%, electric cooker 8%, lighting 3% in order. Hot water supply is relatively higher than space heating because high insulation makes it decreased.

The typd of service and virtual destination node based multicast routing algorithm in ATM network (ATM 통신망에서의 서비스 유형과 경로 충첩 효과를 반영한 멀티캐스트 라우팅 알고리즘)

  • 양선희
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.21 no.11
    • /
    • pp.2886-2896
    • /
    • 1996
  • The Type of Service based multicast routing algorithm is necessary to support efficiently herogeneous applications in ATM network. In this paper I propose the Constrained Multicast Tree with Virtual Destination(DMTVD) heuristic algorithm as least cost multicast routing algorithm. The service is categorized into two types, as delay sensitive and non in CMTVD algorithm. For the delay sensitive service type, the cost optimized route is the Minimum Cost Stenier Tree connecting all the destination node group, virtual destination node group and source node with least costs, subject to the delay along the path being less than the maximum allowable end to end delay. The other side for the non-delay sensitive service, the cost optimized route is the MCST connecting all the multicast groups with least costs, subject to the traffic load is balanced in the network. The CMTVD algorithm is based on the Constrained Multicasting Tree algorithm but regards the nodes branching multiple destination nodes as virtural destination node. The experimental results show that the total route costs is enhanced 10%-15% than the CTM algorithm.

  • PDF