• Title/Summary/Keyword: Total Life Cycle Cost

Search Result 184, Processing Time 0.026 seconds

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.

The Estimation of the Energy Consumption and $C0_2$ Emission at the Construction Stage in the Apartment Housing (공동주택 건설단계 공종별 에너지소비량 및 이산화탄소 배출량 산정연구)

  • Kim, Dae-Hee;Kwon, Bo-Min;Choi, Young-Oh;Lee, Kang-Hee
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.328-333
    • /
    • 2006
  • A few methodologies have been recently developed to estimate the environmental affect when various materials and components are used in building life cycle. The direct survey method has limitations to analyze the environmental problems because of the limit of survey scope and cost. Therefore, another indirect method has been developed as alternatives. The indirect method is represented as input-output analysis. This paper aimed at analyzing the estimation the environmental affect of building materials and works at building construction, utilizing the input-output analysis as a indirect estimation method. The results suggested that the building works is overally responsible for the energy consumption and $CO_2$ emission. In other words, Over the 80% of the total consumption and $CO_2$ emission are resulted at the building work.

  • PDF

Conceptual Study for Asset Management Framework Construction of Railway Infra Structure System (철도시설물에 대한 자산관리체계수립을 위한 개념 연구)

  • Lee, Jee-Ha;Park, Mi-Yun;Lee, Jong-Kun;Park, Man-Ho;Jung, Dae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2473-2478
    • /
    • 2011
  • The asset management of railway facilities is a total framework for finally supporting a safe and comfortable train service, which includes functions of supporting evaluation of condition and performance of infrastructures, making the decision method of repair or rehabilitation of deteriorated facilities, and lengthening the life cycle of structure through the decision of adequate cost and time of repair or reinforcement. In the range of the asset management, organization, human, the target, and information & data of company are included. Therefore, in this paper, appling the method of asset management analysis to the railway structures, the process of the risk assesment using BRE(Business Risk Exposure) and the basis of consisting optimized renewal decision-making are expressed.

  • PDF

A Study of Software Optimal Release Time for Based on Superposition NHPP Model (중첩 NHPP 모형에 근거한 소프트웨어 최적방출시기에 관한 연구)

  • Kim, Hee Cheul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.3
    • /
    • pp.9-17
    • /
    • 2010
  • Decision problem called an optimal release policies, after testing a software system in development phase and transfer it to the user, is studied. The applied model of release time exploited infinite non-homogeneous Poisson process. This infinite non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used superposition which has various intensity, if the system is complicated. Thus, software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time. Through this study, in terms of superposition model and simply model, the optimal time to using superposition model release the software developer to determine how much could count will help.

A Study on Systematic Development of Military Logistic Support System to Improve the Operational Availability for Underwater Guided Weapon (수중유도무기의 운용가용도 향상을 위한 군수지원시스템의 체계적 개발에 관한 연구)

  • Shin, Ju-Hwan;Yun, Won-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.4
    • /
    • pp.75-87
    • /
    • 2005
  • Generally speaking, weapon system is defined as a combination of primary system and support system which are evaluated by capability and operational availability respectively. Recently comparison of total life cycle cost shows that logistic support system is proved to be more important than primary system. However, until now systematic approach to support system development has not been applied in the area of developing support system. We need to construct a universal metric for effectiveness of logistic support system and to cut out whatever activities or support elements which do not contribute to the metric. This paper describes a new approach based on system engineering approach to logistic support system and also classifies five factors of failure, stock-out frequency, administrative delay time, active repair time and logistic delay time that have influence on operational availability of logistic support system.

Durability Performance Analysis of a Differential Gear for a Low Speed Vehicles (저속차량 차동장치의 내구성능 해석)

  • Cheon, Jong-Pil;Pyoun, Young-Sik
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.21 no.6
    • /
    • pp.897-902
    • /
    • 2012
  • Low speed vehicle(LSV), golf carts have unique requirements to differential gear design. For double axle torque LSV differential loading conditions were determined with the help of analytical model and ANSYS finite element analysis. With stress safety factor 3.15, fatigue safety factor 1.08 and fatigue life 106 cycle ring gear teeth strength analysis is performed and structure design optimized. This allows reducing overall cost of differential unit.

A study on the PBL Application Scheme for Optimal Maintenance of the KF-X Project (한국형전투기(KF-X)의 최적정비를 위한 PBL 적용방안에 관한 연구)

  • Park, Keun-Seog;Yoo, Yong-Hyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.24 no.3
    • /
    • pp.10-18
    • /
    • 2016
  • This paper deals with the Performance Based Logistics(PBL) application scheme pertaining to optimal maintenance program for logistics of Korean Fighter Experimental(KF-X) Project. For enhancement of the performance based logistics system application to KF-X program the selection of appropriate standards fit to maximize cost-cutting, a set of performance metrics fit for the purpose of the contract, foreign technology dependence of core equipments and parts were considered. Thus, selecting appropriate standards fit for Korean logistics environment, domestic maintenance enterprise for stable rate of operation of KF-X, a systematic reliability task that is able to measure quantitative combat capability are suggested.

PPR Information Managements for Manufacturing of Automotive Press Dies (자동차 금형 생산을 위한 PPR 정보 관리)

  • Kim, Gun-Yeon;Lee, In-Seok;Song, Myeong-Hwan;Noh, Sang-Do
    • Korean Journal of Computational Design and Engineering
    • /
    • v.12 no.6
    • /
    • pp.452-460
    • /
    • 2007
  • To achieve rapid developments and cost savings in manufacturing industries including automotive die shops, new paradigm and its supporting systems of information managements through total product life cycle are needed for concurrent and collaborative engineering. For manufacturing of automotive press dies, integrated and efficient managements of PPR information including product, manufacturing process and resource are essential. In this paper, we introduce a PLM approach to achieve engineering collaborations in product development and production of automotive dies. To prove concepts and benefits of PPR information managements, we implement new business workflow and detail procedures, PPR information management system and other related applications. By PPR information managements in PLM, improvements in quality of engineering results and savings in time from design to production of dies are possible.

A Study on Optimal Release Time for Software Systems based on Mixture Weibull NHPP Model (혼합 와이블 NHPP 모형에 근거한 소프트웨어 최적방출시기에 관한 연구)

  • Lee, Sang Sik;Kim, Hee Cheul
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.6 no.2
    • /
    • pp.183-191
    • /
    • 2010
  • Decision problem called an optimal release policies, after testing a software system in development phase and transfer it to the user, is studied. The applied model of release time exploited infinite non-homogeneous Poisson process. This infinite non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used mixture which has various intensity, if the system is complicated. Thus, software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.

Avionics/Electronics Integrity

  • Kim, Yon-Soo;Park, Sang-Min
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.371-377
    • /
    • 1995
  • Modern combat (or commertial) aircraft systems consist of a large number of sophisticated and complex avionics/electronics subsystems. The US Air Force of Productivity, Reliability, Availability and Maintainability (PRAM) reports that 25 to 45 percent of aircraft system failures in the electronics or electromechanical area 〔Kachmar, 1985〕. It is an important issue to achive the required reliability and maintainability for avionics/electronics subsystems in order to guarantee the mission success during the life cycle in a timely and cost effective manner. The issuance of USAF Mil-A-87244, "Avionics/Electronic Integrity Program requirements," 1987 demands a new approach called "Avionics/Electronics Integrity Program" (AVIP). The objective of this paper is to give a tutorial presentation on the basic aspects of Avionics/Electronics Integrity efforts in relation to total quality management of avionics/electronics whose performance measures are expressed in terms of reliability, durability, and matainability.

  • PDF