Abstract
This paper deals with the Performance Based Logistics(PBL) application scheme pertaining to optimal maintenance program for logistics of Korean Fighter Experimental(KF-X) Project. For enhancement of the performance based logistics system application to KF-X program the selection of appropriate standards fit to maximize cost-cutting, a set of performance metrics fit for the purpose of the contract, foreign technology dependence of core equipments and parts were considered. Thus, selecting appropriate standards fit for Korean logistics environment, domestic maintenance enterprise for stable rate of operation of KF-X, a systematic reliability task that is able to measure quantitative combat capability are suggested.