• 제목/요약/키워드: Time-Cost factor

검색결과 632건 처리시간 0.02초

안전재고에 관한 연구 (A Study on the Safety Stock)

  • 박병기;정종식
    • 산업경영시스템학회지
    • /
    • 제10권16호
    • /
    • pp.143-147
    • /
    • 1987
  • Safety stocks constitute one of the major means of dealing with the uncertainties associated with variation in demand and lead time. Adeguate safety facilitate production activities and help to assure customers if good service on the other hand, carrying safety storks ties up working capital on goods that sit idle. The major problem of safety stocks management thus of consists of trying to achieve an optimal balance between the other carrying cost and the costs of stock shortage. Therefore, this study aims to find safety stock level of the fixed reorder quantity system and the fixed reorder cycle system of minimizing total cost when both demand and lead time are variable. (The distribution of demand and lead time is a mere assumption that follows the normal distribution) The results can be summarized as follows. i) Safety factor on the safety stock is determined by carrying cost and the costs of stock shortage: An optimal safety stick=the costs of stork shortage($C_s$) (the carrying cost($C_h$)+the costs of stock storage($C_s$). ii) The safety stock level of the fixed reorder quantity system is ($a{\;}_p\sqrt{L}{\sigma}$) under uncertainties. iii) The safety stock level of the fixed reorder cycle system is ($a{\;}_p\sqrt{R+L{\sigma}}$) under uncertain demand and constant lead time. ($a{\;}_p\sqrt{L{\sigma}_d{\;^2+{\mu}^2L{\sigma}^2}$) under demand and lead time uncertainties.

  • PDF

International Multimodal Transport Route Development from Korea to Mongolia

  • Nyamjav, Tsenskhuu;Ha, Min-Ho
    • 한국항해항만학회지
    • /
    • 제46권5호
    • /
    • pp.419-426
    • /
    • 2022
  • This study aimed to identify new routes for transporting automobiles from Korea to Mongolia by comparing them with the existing route. At present, a route from the Incheon Port through the Tianjin Port to Zamiin-Uud is commonly used to transport containerized cargo from Korea to Mongolia. This study examined five possible logistics routes from Korea to Mongolia using a time/cost-distance methodology based on real data. Through consecutive discussions with importers and freight forwarders in Mongolia, the potential routes were selected and costs, distance, and lead time were evaluated to provide additional route options for automobile logistics from Korea to Mongolia. The results indicated that each route could be ranked in terms of the total cost while the lead time for all options in the present COVID-19 period is 2 - 4 months, with no difference among the routes. In addition, although the confidence index of all routes was not impressive, route 3 was the most preferred option, followed by route 1. However, the study results cannot provide the answer to the question of "which route is more attractive for transporting automobiles from Korea to Mongolia." This limitation notwithstanding, this study provides real information on the critical factors of distance, cost, and lead time in terms of the selected transportation routes so that importers and exporters can compare the routes in terms of the priority of each factor in uncertain logistics environment.

공공업무시설의 수선비 조사를 통한 연차별 비용변화 패턴 및 수선비 항목별 발생빈도와 평균비용 분석 (A Study on cost expenditure characteristics and importance level of each maintenance item of public office buildings by conducting cost surveys)

  • 최석규;김갑열
    • KIEAE Journal
    • /
    • 제8권1호
    • /
    • pp.111-118
    • /
    • 2008
  • To maintain the public office buildings, the related government employee uses cost under the limited budget. it is difficult to execute the budget as is assigned to maintenance items with contemplating the characteristics such as frequency, cost/item, weighting factor, and etc. As a precedent study about this cost-efficiency model, this study is intended to show the expenditure trends, frequencies, and cost distributions of maintenance items for the development of cost-efficiency model by analyzing time series data from the surveys on maintenance costs of the selected public office buildings.

통행거리에 따른 유류비를 반영한 경로선택모형 개발 (A Route Choice Model with Considering Fuel Cost by Travel Distance)

  • 박보라;이재영;최기주;송필용
    • 대한토목학회논문집
    • /
    • 제30권6D호
    • /
    • pp.599-604
    • /
    • 2010
  • 본 연구는 거리에 따른 유류비를 고려하여 시간가치를 산정하고, SP 조사를 통해 경로선택 시 통행시간, 통행요금과 함께 거리에 대한 유류비를 반영함이 타당한지 분석하는 것을 목적으로 하였다. 수준 차이를 고려한 SP 조사설계기법을 이용하여 SP 자료를 구축하여 분석하였으며, 통행시간, 통행요금 및 유류비에 대한 가치를 추정하기 위한 모형식을 구축하였다. 모형추정 결과, 경로선택 시 통행요금과 함께 유류비 역시 운전자의 경로선택에 영향을 미치는 것으로 나타났다. 경로선택에 있어 통행요금이 유류비에 비해 더 큰 것으로 나타났는데, 이는 통행요금이 현금지불경비(out-of-pocket expenses)인 반면 유류비 지출은 주기적이라는 특성 때문에 유류비가 통행요금에 비해 덜 민감하게 나타난 것으로 보인다.

Decision Support Tool for Excavation Operation using Genetic Algorithms

  • Lee, Ung-Kyun;Kang, Kyung-In;Cho, Hun-Hee
    • Architectural research
    • /
    • 제8권2호
    • /
    • pp.43-48
    • /
    • 2006
  • The appropriate fleet estimation of the excavation equipment is a major factor in the determination of the cost and time requirements of a project. But the decision of what kind of equipment selected is often based on heuristic methods or trial and error in Korea. Thus, this study proposes a prototype model that uses genetic algorithms to select fleet estimation of loaders (backhoe) and trucks used in excavation work. To verify the applicability of this model, the case study was performed. And the result of the genetic model was compared with that of the trial & error method. The use of the genetic model suggested this study required 44days, 2 units of backhoes, 7 units of trucks, and a total cost of 171,839,756 won. With the estimated fleet number of equipment, the minimum cost of excavation work can be calculated, taking account of the time-cost trade-off. By utilizing this prototype model, the efficiency of excavation work can be improved.

프린트 산업에서 부품 신뢰성 시험법 개선 (Case Study of Parts Reliability Improvement)

  • 김판수;한기웅;이지혜
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2011년도 춘계학술대회
    • /
    • pp.663-674
    • /
    • 2011
  • Continuing and Developing the growth, the company should focus on 'time to market of high quality production' and 'cost down'. Due to the complexity of the production, reliability is being one of the important factor. In this study, in particular, focus on parts reliability test improvement about printer product and proceeded. Need test improvement for time to market that is developed, and reduce expense with test period that is required at Reliability Test time of new parts and should high quality level of product. Finally huge Failure Cost (F-COST) occurs because quality level of product drops if parts that accomplish product does not ensure reliability and this is associated by malfunction in marketplace.

  • PDF

프린트 산업에서 부품 신뢰성 시험법 개선 (Case Study of Parts Reliability Improvement)

  • 김판수;한기웅;이지혜
    • 대한안전경영과학회지
    • /
    • 제12권3호
    • /
    • pp.153-162
    • /
    • 2010
  • Continuing and Developing the growth, the company should focus on 'time to market of high quality production' and 'cost down'. Due to the complexity of the production, reliability is being one of the important factor. In this study, in particular, focus on parts reliability test improvement about printer product and proceeded. Need test improvement for time to market that is developed, and reduce expense with test period that is required at Reliability Test time of new parts and should high quality level of product. Finally huge Failure Cost (F-COST) occurs because quality level of product drops if parts that accomplish product does not ensure reliability and this is associated by malfunction in marketplace.

Development of Lifetime Assessment and Rehabilitation Cost Calculation Methods for Overseas ROMM Project

  • Hyun, Jung-Seob;Kim, Doo-Young;Hwang, Kwang-Won;Park, Min-Gyu
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제3권2호
    • /
    • pp.119-125
    • /
    • 2017
  • Regarding the implementation of ROMM project (Rehabilitation, Operation, Maintenance & Management), which is one of overseas development projects, it is very important to diagnose the exact current status of aged thermal power plant. However, when people visit the power plant for the purpose of prediagnosis to implement the ROMM project, most target power plants for diagnosis, in general, are under operation. This can be a big interference factor to diagnose the exact current status of power plants. Therefore, in order to solve such interference factor, based on the 30 years of know-how in the field, the present study has developed a regression curve for a simple life time assessment and the calculation of rehabilitation cost that may be used as a reference relatively for the quantitative diagnosis on the status of a relevant power plant even during the operation of the power plant.

발주마감시간 변경을 통한 SCM Process 개선 (Improving the Efficiency of SCM Process by Rearranging the Reorder Point)

  • 백시현
    • 산업경영시스템학회지
    • /
    • 제31권2호
    • /
    • pp.36-42
    • /
    • 2008
  • As competition shifts from being a company oriented one to a supply chain oriented, an effective SCM(supply chain management) becomes a necessary strategy for any successful businesses. But, it is not easy to form a successful SCM, because the individual desire of participants conflict with others. These desires affect the performance of SCM and cause waste of cost and time. Analyzing a supply chain of discount retailers, this paper eliminates idle time and improves the process with rearranging the reorder closing time(reorder point). For win-win strategy, this work reveals the reorder closing time is an important factor. It is possible to reduce cost and time on the entire SCM process by just changing the ordering time.

초등학교급식에서 수행되는 급식비 관련 재무관리 업무분석 (Analysis of Financial Management Activities in Elementary School Foodservices)

  • 최은희;이진미;곽동경
    • 대한영양사협회학술지
    • /
    • 제2권2호
    • /
    • pp.123-140
    • /
    • 1996
  • The purpose of this study was to examine financial management practices in elementary school foodservices. Respondents were asked to provide information on demographics, operational characteristics, financial management activities(responsibility, importance and time demand). Data were collected from 106 elementary school foodservice using the mail questionnaire. The results were as follows 1. Time demand of 14 financial management activities was examined. The results of time-demand showed that most financial activities were performed about once per month. Reporting, inventory checking and production cost accounting were performed several times per week. 2. Major financial management activities performed by school dietitians were inventory checking, record keeping, production cost accounting, and foodservice operation planning. 3. Results of the importance rating of 14 financial management activities showed that the production cost accounting, budgeting, controlling meal costs, reporting the national treasury accounts, and inventory checking were rated as very important(4.00-4.49). Factor analysis was conducted on the importance ratings. Five activities were differentiated such as budgeting, record keeping, cost controlling, cost accounting, and reporting. The cost controlling task was identified at the most important one among them. 4. Important ratings for reporting were found to be significantly different by age, and years of experience. The younger and the less experienced were responded with higher scores on reporting. Analysis of variance for the importance scales by meal costs per one person, food cost percentage, labor cost percentage was conducted, but significant differences were not founded.

  • PDF