• Title/Summary/Keyword: Test scheduling

Search Result 221, Processing Time 0.023 seconds

Performance Analysis of Local Optimization Algorithms in Resource-Constrained Project Scheduling Problem (자원제약 프로젝트 스케쥴링 문제에 적용 가능한 부분 최적화 방법들의 성능 분석)

  • Yim, Dong-Soon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.37 no.4
    • /
    • pp.408-414
    • /
    • 2011
  • The objective of this paper is to define local optimization algorithms (LOA) to solve Resource-Constrained Project Scheduling Problem (RCPSP) and analyze the performance of these algorithms. By representing solutions with activity list, three primitive LOAs, i.e. forward and backward improvement-based, exchange-based, and relocation-based LOAs are defined. Also, combined LOAs integrating two primitive LOAs are developed. From the experiments with standard test set J120 generated using ProGen, the FBI-based LOA demonstrates to be an efficient algorithm. Moreover, algorithms combined with FBI-based LOA and other LOA generate good solutions in general. Among the considered algorithms, the combined algorithm of FBI-based and exchangebased shows best performance in terms of solution quality and computation time.

Genetic Algorithms with a Permutation Approach to the Parallel Machines Scheduling Problem

  • 한용호
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.14 no.2
    • /
    • pp.47-47
    • /
    • 1989
  • This paper considers the parallel machines scheduling problem characterized as a multi-objective combinatorial problem. As this problem belongs to the NP-complete problem, genetic algorithms are applied instead of the traditional analytical approach. The purpose of this study is to show how the problem can be effectively solved by using genetic algorithms with a permutation approach. First, a permutation representation which can effectively represent the chromosome is introduced for this problem . Next, a schedule builder which employs the combination of scheduling theories and a simple heuristic approach is suggested. Finally, through the computer experiments of genetic algorithm to test problems, we show that the niche formation method does not contribute to getting better solutions and that the PMX crossover operator is the best among the selected four recombination operators at least for our problem in terms of both the performance of the solution and the operational convenience.

Disassembly Scheduling for Products with Assembly Structure

  • Lee Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.11 no.1
    • /
    • pp.63-78
    • /
    • 2005
  • Disassembly scheduling is the problem of determining the ordering and disassembly schedules of used or end-of-life products while satisfying the demand of their parts or components over a certain planning horizon. This paper considers the case of the assembly product structure for the cost-based objective of minimizing the sum of purchase, setup, inventory holding, and disassembly operation costs. To represent and solve the problem optimally, this paper presents an integer programming model, which is a reversed form of the multi-level lot sizing formulation. Computational experiments on an example derived from the literature and a number of randomly generated test problems are done and the results are reported.

Bandwidth Allocation and Scheduling Algorithms for Ethernet Passive Optical Networks

  • Joo, Un-Gi
    • Management Science and Financial Engineering
    • /
    • v.16 no.1
    • /
    • pp.59-79
    • /
    • 2010
  • This paper considers bandwidth allocation and scheduling problems on Ethernet Passive Optical Networks (EPON). EPON is one of the good candidates for the optical access network. This paper formulates the bandwidth allocation problem as a nonlinear mathematical one and characterizes the optimal bandwidth allocation which maximizes weighted sum of throughput and fairness. Based upon the characterization, two heuristic algorithms are suggested with various numerical tests. The test results show that our algorithms can be used for efficient bandwidth allocation on the EPON. This paper also shows that the WSPT (Weighted Shortest Processing Time) rule is optimal for minimization the total delay time in transmitting the traffic of the given allocated bandwidth.

An Improvement of Algorithms for Assembly-type Flowshop Scheduling Problem with Outsourcing (부품외주를 고려한 조립형 Flowshop 일정계획 해법 개선)

  • Yoon, Sang-Hum;Juhn, Jae-Ho
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.31 no.2
    • /
    • pp.80-93
    • /
    • 2008
  • This paper improves algorithms for an assembly-type flowshop scheduling problem in which each job is to assemble two types of components and makespan is the objective measure. For the assembly, one type of the components is outsourced with job-dependent lead time but the other type is fabricated in-house. When both components for a job are prepared, the assembly operation for the job can be started. This problem had been proved to be NP-Complete, so branch-and-bound (B&B) and heuristic algorithms have already been developed. In this paper, we suggest other dominance rules, lowerbound and heutistic algorithms. Also, we develop a new B&B algorithm using these improved bound and dominance rules. The suggested heuristics and B&B algorithm are compared with existing algorithms on randomly-generated test problems.

Implementation of Real-Time Thermal Environment for Virtual Reality Using Gain Scheduling and Cascade Control (게인 스케쥴링과 캐스케이드 제어에 의한 가상현실용 열환경의 실시간 구현)

  • Sin, Yeong-Gi;Jang, Yeong-Su;Kim, Yeong-Il
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.7
    • /
    • pp.567-573
    • /
    • 2001
  • A real-time HVAC system is proposed which implements real-time control of thermal environment for virtual reality. It consists of a pair of hot and cold loops that serve as thermal reservoirs, and a mixing box to mix hot and cold air streams flowing if from loops. Their flow rates are controlled in real-time to meet a set temperature and flow rate. A cascade control algorithm along with gain scheduling is applied to the system and test results shows that the closed-loop response approached set values within 3 to 4 seconds.

  • PDF

A Study on the Dynamic Scheduling for Distributed Management Systems (분산관리 시스템을 위한 동적 스케쥴링의 연구)

  • Chung, Nam-Kee
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.2
    • /
    • pp.207-216
    • /
    • 1995
  • Constructing a distributed management system has its own advantages in addressing the issue of implementing a quick responsive management system in dynamically changing environment of enterprise. We suggest a basic scheduling methodology applicable to a distributed production management system. A new concept of "flexible schedule" is introduced as a tool to accommodate dynamically changing situations of job shops. Then a search technique (referred to as CSP-CBA search) is presented to obtain such a schedule for the job shop scheduling problem, which is converted into a constraint satisfaction problem(CSP), by using the constraint based analysis(CBA). This approach is tested on more than 100 test problems. The results show that the suggested approach required shorter CPU time and solved more problems in given time than another fixed schedule method.

  • PDF

The Optimal Scheduling and Operational characteristics on Battery Energy Storage System (전지전력저장설비의 최적운용 및 운전특성에 관한 연구)

  • Song, Kil-Yeong;Oh, Kwang-Hae;Kim, Yong-Ha;Rho, Dae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 1993.07a
    • /
    • pp.102-105
    • /
    • 1993
  • The objective of this study is to solve the operation scheduling problem of plural battery energy storage systems (BESS), and to find useful intonation from its result. Unlike conventional energy storage system, BESS has on hardware characteristics such as high efficiency, fast-acting response and operational loss. Considering rate constraints of thermal unit power as well as hardware characteristics of BESS, the operation scheduling has an intricated problem. In order to solve this optimization problem, we use successive approximations dynamic programming. In two types of operation, the proposed algorithm is applied to test system. one is daily optimal operation, the other weekly optimal operation.

  • PDF

A Study on Deterministic Utilization of Facilities for Allocation in the Semiconductor Manufacturing (반도체 설비의 효율성 제고를 위한 설비 할당 스케줄링 규칙에 관한 연구)

  • Kim, Jeong Woo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.1
    • /
    • pp.153-161
    • /
    • 2016
  • Semiconductor manufacturing has suffered from the complex process behavior of the technology oriented control in the production line. While the technological processes are in charge of the quality and the yield of the product, the operational management is also critical for the productivity of the manufacturing line. The fabrication line in the semiconductor manufacturing is considered as the most complex part because of various kinds of the equipment, re-entrant process routing and various product devices. The efficiency and the productivity of the fabrication line may give a significant impact on the subsequent processes such as the probe line, the assembly line and final test line. In the management of the re-entrant process such as semiconductor fabrication, it is important to keep balanced fabrication line. The Performance measures in the fabrication line are throughput, cycle time, inventory, shortage, etc. In the fabrication, throughput and cycle time are the conflicting performance measures. It is very difficult to achieve two conflicting goal simultaneously in the manufacturing line. The capacity of equipment is important factor in the production planning and scheduling. The production planning consideration of capacity can make the scheduling more realistic. In this paper, an input and scheduling rule are to achieve the balanced operation in semiconductor fabrication line through equipment capacity and workload are proposed and evaluated. New backward projection and scheduling rule consideration of facility capacity are suggested. Scheduling wafers on the appropriate facilities are controlled by available capacity, which are determined by the workload in terms of the meet the production target.

A New Packet Forwarding Architecture For Fairness Improvement in Wireless Sensor Network (무선 센서 네트워크 환경에서 공정성 향상을 위한 새로운 패킷 전송 구조)

  • Song, Byung-Hun;Lee, Hyung-Su;Ham, Kyung-Sun
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.215-217
    • /
    • 2004
  • In wireless sensor networks, fair allocation of bandwidth among different nodes is one of the critical problems that effects the serviceability of the entire system. Fair bandwidth allocation mechanisms, like fair queuing, usually need to maintain state, manage buffers, and perform packet scheduling on a per flow basis, and this complexity may prevent them from being cost-effectively implemented and widely deployed. It is a very important and difficult technical issue to provide packet scheduling architecture for fairness in wireless sensor networks. In this paper, we propose an packet scheduling architecture for sensor node, called FISN (Fairness Improvement Sensor Network), that significantly reduces this implementation complexity yet still achieves approximately fair bandwidth allocations. Sensor node for sensing estimate the incoming rate of each sensor device and insert a label into each transmission packet header based on this estimate. Sensor node for forwarding maintain no per flow state; they use FIFO packet scheduling augmented by a probabilistic dropping algorithm that uses the packet labels and an estimate of the aggregate traffic at the gathering node. We present the detailed design, implementation, and evaluation of FISN using simulation. We discuss the fairness improvement and practical engineering challenges of implementing FISN in an experimental sensor network test bed based on ns-2.

  • PDF