• Title/Summary/Keyword: Test scheduling

Search Result 221, Processing Time 0.024 seconds

A Multi-Query Optimizing Method for Data Stream Similar Queries on Sliding Window (슬라이딩 윈도에서의 데이터 스팀데이터 유사 질의 처리를 위한 다중질의 최적화 기법)

  • Liangbo Li;Yan Li;Song-Sun Shin;Dong-Wook Lee;Weon-Il Chung;Hae-Young Bae
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.413-416
    • /
    • 2008
  • In the presence of multiple continuous queries, multi-query optimizing is a new challenge to process multiple stream data in real-time. So, in this paper, we proposed an approach to optimize multi-query of sliding window on network traffic data streams and do some comparisons to traditional queries without optimizing. We also detail some method of scheduling on different data streams, while different scheduling made different results. We test the results on variety of multi-query processing schedule, and proofed the proposed method is effectively optimized the data stream similar multi-queries.

A Test Wrapper Design to Reduce Test Time for Multi-Core SoC (멀티코어 SoC의 테스트 시간 감축을 위한 테스트 Wrapper 설계)

  • Kang, Woo-Jin;Hwang, Sun-Young
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39B no.1
    • /
    • pp.1-7
    • /
    • 2014
  • This paper proposes an efficient test wrapper design that reduces overall test time in multi-core SoC. After initial local wrapper solution sets for all the cores are determined using well-known Combine algorithm, proposed algorithm selects a dominant core which consumes the longest test time in multi-core SoC. Then, the wrapper characteristics in the number of TAM wires and the test time for other cores are adjusted based on test time of the dominant core. For some specific cores, the number of TAM wires can be reduced by increasing its test time for design space exploration purposes. These modified wrapper characteristics are added to the previous wrapper solution set. By expanding previous local wrapper solution set to global wrapper solution set, overall test time for Multi-core SoC can be reduced by an efficient test scheduler. Effectiveness of the proposed wrapper is verified on ITC'02 benchmark circuits using $B^*$-tree based test scheduler. Our experimental results show that the test time is reduced by an average of 4.7% when compared to that of employing previous wrappers.

Parallel Processing of Multiple Queries in a Declustered Spatial Database (디클러스터된 공간 데이터베이스에서 다중 질의의 병렬 처리)

  • Seo, Yeong-Deok;Park, Yeong-Min;Jeon, Bong-Gi;Hong, Bong-Hui
    • Journal of KIISE:Databases
    • /
    • v.29 no.1
    • /
    • pp.44-57
    • /
    • 2002
  • Multiple spatial queries are defined as two or more spatial range queries to be executed at the same time. The primary processing of internet-based map services is to simultaneously execute multiple spatial queries. To improve the throughput of multiple queries, the time of disk I/O in processing spatial queries significantly should be reduced. The declustering scheme of a spatial dataset of the MIMD architecture cannot decrease the disk I/O time because of random seeks for processing multiple queries. This thesis presents query scheduling strategies to ease the problem of inter-query random seeks. Query scheduling is achieved by dynamically re-ordering the priority of the queued spatial queries. The re-ordering of multiple queries is based on the inter-query spatial relationship and the latency of query processing. The performance test shows that the time of multiple query processing with query scheduling can be significantly reduced by easing inter-query random seeks as a consequence of enhanced hit ratio of disk cache.

A Study on the Diagnosis of Thermal Performance in the Steam Turbine for Generation (발전용 증기터빈 열성능 진단에 관한 연구)

  • Kim, Kwang-Hong;Hong, Eun-Kee;Hwang, Kwang-Won;Jang, Chul-Ho;Kim, Si-Moon
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3236-3240
    • /
    • 2007
  • This paper describes the results of steam turbine performance tests. The objectives of performance test is to exactly evaluate the degradation(decrease in performance) of the coal-fired steam turbine generator in order to provide plant information to help performance engineers identify problems, improve performance, and make economic decisions about scheduling maintenance and optimizing operation. To achieve these goals, the periodic thermal performance tests have been carried out since the initial operation period, 1997. We made the calculation program and guidelines for the tests and developed the performance index of the turbine cycle on the basis of the ASME PTC. By comparing the performance changes throughout the whole operation period, we confirmed the performance reliabilities of the turbine and its conditions.

  • PDF

Command Auto-Loader System for KOMPSAT-l

  • Koo In-Hoi;Hyun Dae-Hwan;Baek Hyun-Chul;Ahn Sang-il
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.501-504
    • /
    • 2004
  • There is a world-wide trend to implement autonomous TM/TC system in satellite operations. KARI developed CALS(Command AutoLoader System) for KOMPSAT-1 operation automation in 2004. This paper provides system requirement, system design, system test and operational procedure. Through test with simulator and KOMPSAT-1, CALS was verified to meet all functional and operational requirement like scheduling, real-time telemetry check, CRC generation, command grouping. CALS is expected to be used in KOMPSAT-1 normal mission operation in end of 2004

  • PDF

Correlation between Longitudinal Wave Velocity and Strength of Early-aged Concrete (초기 재령 콘크리트의 종파 속도와 강도의 상관관계)

  • 이휘근;이광명;김동수
    • Journal of the Korea Concrete Institute
    • /
    • v.12 no.6
    • /
    • pp.67-74
    • /
    • 2000
  • The usage of nondestructive testing on early-aged concrete leads to enhacned safty and allows effective scheduling of construction, thus making it possible to maximize the time and cost efficiencies. In this study, a reliable nondestructive strength evaluation method for early-aged concrete using the longitudinal wave velocity is proposed. Compression tests were performed to examine factors influencing the velocity-strength relationship of concrete, such as water-cement (w/c) ratio, fine aggregate ratio, curing temperature, and curing condition. The test results show that a change in the w/c ratio and curing temperature has minor effect on the velocity-strength relationship/ However, curing condition significantly influences the velocity-strength relationship of early-aged concrete. Moreover, the longitudinal wave velocity increases with decreasing fine aggregate ratio. It is concluded from this study that the strength evaluation of early-age concrete can be achieved by a nonlinear equation which considers the effects of curing condition and fine aggregate ratio.

Implementation of a Lagragian Relaxation Based Unit Commitment Scheduling (Lagrangian Relaxation 방법에 기초한 전기 기동 정지 계획의 구현)

  • Nam, Y.W.;Kim, S.S.;Jung, H.S.;Han, T.K.;Park, J.K.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1003-1005
    • /
    • 1998
  • We present the implementation of a Lagrangian Relaxation based large scale thermal Unit Commitment problem. The problem is decomposed into thermal subproblem by using Lagrangian multipliers. The thermal subproblem is solved by using dynamic programmmg. we perform a numerical test using the thermal system of KEPCO over a week (168 hours) period. The programming language used for the test program is C. The result is compared with the priority list method.

  • PDF

Considering Claim Costs in Project Time-Cost Mixed Integer Programming Model (클레임코스트를 고려한 프로젝트의 시간-비용 혼합정수계획모형)

  • Kim, Jong-Yul;Kang, Chang-Wook;Hwang, In-Keuk
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.97-105
    • /
    • 2011
  • Previous researches have focused on the efficiency of project execution and the satisfaction of internal customers In view of the fact that a project is successful if any defects are not found in the short-term performance test of the project final outcome. To execute a project that both internal customer and external customer are satisfied in terms of longer-term benefit perspective, the project claim costs (PCC) which may occur for the warranty period of the project final outcome should be considered. We propose a model included PCC to the linear programming between time and cost to expedite a project and perform the validity test by applying the model to an example project. This model and related procedure will contribute to overall project activities' cost reduction by taking preventive actions for PCC.

Design and Implementation of BioAPI v2.0 based BSP Conformance Test Suite (BioAPI v2.0 기반 BSP 표준 적합성 시험 도구의 설계 및 구현)

  • Jang Ji-Hyeon;Lee Dong-Geun;Kim Jae-Sung;Kim Hak-Il
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.16 no.3
    • /
    • pp.129-141
    • /
    • 2006
  • The purpose of this paper is to design Conformance Test Suite for BSP(Biometric Service Provider) based on BioAPI(Biometric Application Programming Interface) v2.0. The proposed BioAPI Conformance Test Suite enables users to test BSP with framework independently. A test scheduling tool has been embodied to use Test Assertion in the form of XML. In order to demonstrate the performance of the Conformance Test Suite, the experiment was performed by using both verification and identification BSPs. As the results of this experiment, we were able to determinate whether BSPs based on BioAPI v2.0 satisfied standard requirements or not.

Attitude Controller Design and Flight Test of KSR-III Sounding Rocket (KSR-III 과학로켓의 자세제어기 설계와 비행시험)

  • Roh, Woong-Rae;Cho, Hyun-Chul;Ahn, Jae-Myung;Choi, Hyung-Don
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.32 no.3
    • /
    • pp.88-94
    • /
    • 2004
  • The KSR-III rocket is a liquid propellant sounding rocket and thrust vector control actuators and cold gas thrusters are used to control pitch and yaw, roll attitude respectively during thrusting phase. In this paper, the structure of designed attitude controller and gain scheduling, results of stability analysis for KSR-III rocket are presented. The attitude controller is implemented with flight software in the domestically developed INS and successfully performed its function in the flight test. The flight data are coincident with simulation results.