• Title/Summary/Keyword: Test procedures

Search Result 1,857, Processing Time 0.034 seconds

Review about test method for the full-insulation verification of circuit breaker rated on 800kV, 50kA (800kV, 50kA 차단기의 전절연 검증을 위한 시험방법 검토)

  • Park, Seung-Jae;Suh, Yoon-Taek;Yoon, Hack-Dong;Kim, Yong-Sik;Kim, Maeng-Hyun;Koh, Heui-Seog
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.569-571
    • /
    • 2005
  • In case of dead-tank circuit breaker with the earthed enclosure, the dielectric performance for phase to ground should be verified under the hot-gas condition produced by the current interruption. This test condition is required in breaking test duties with the rated short-circuit current and rated voltage. And, KERI has completed the reinforcement of the synthetic testing facilities and these facilities have the testing capacity which enables the full-pole testing for 800kV circuit breaker by adopting the series voltage injection method. So, this paper introduced the test circuit and procedures about the full-pole and the multi-part testing method which was devised to estimate the full -insulation of phase-to-ground for the multi-pole and dead-tank circuit breaker.

  • PDF

A Study on the Assessment of Blind Spot Detection for Road Alignment (도로 선형에 따른 사각지역 감시장치 평가에 관한 연구)

  • Lee, Hongguk;Park, Hwanseo;Chang, Kyungjin;Yoo, Songmin
    • Journal of Auto-vehicle Safety Association
    • /
    • v.4 no.1
    • /
    • pp.27-32
    • /
    • 2012
  • Recently, in order to reduce traffic accident related fatalities, increasing number of studies are conducted regarding the vehicle safety enhancement devices. But very few studies about test procedures and requirements for vehicle safety systems are being carried out. Since BSD, as one of the most important safety features, is installed on a new vehicle, its performance test method has to be evaluated. Independent factors irrelevant to the device types including collision position, vehicle speed and closing speed are used to calculate test distance away from the current vehicle. Effect of roadway geometry as radius of curvature is introduced to propose possible misjudgement of following vehicle as adjacent one. The study results would be utilized to enhance the test procedure of BSD performance.

Procedures of Biaxial Seismic Capacity Test and Seismic Performance Evaluation (수평이축방향 내진역량시험과 내진성능평가 절차)

  • 김재관;김익현;이재호
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2001.04a
    • /
    • pp.453-460
    • /
    • 2001
  • The seismic capacity of columns usually has been tested in uniaxial loading condition. The seismic performance used to be evaluated under the same assumption. Since the real earthquake motion is multi-directional, the effects of multi-directional excitation on the seismic capacity of structures need to be carefully examined. In this paper, a frequency dependent alternate biaxial cyclic loading test is proposed as an evaluation method of seismic capacity under multi-directional excitation. Four test specimens were made and tested to study the degradation of strength, stiffness and ductility under biaxial loading condition. A multi- directional excitation. The capacity is obtained using frequency dependent alternate biaxial cyclic loading test. The orthogonal effect is taken into account by increasing the demand.

  • PDF

Reliability Assessment of Ultrasonic Nondesturcive Inspection on Piping in NPP - The Result of PD-RR Test - (Part I) (원전 배관 초음파 비파괴검사의 신뢰도 평가 - PD-RR Test Results - (I))

  • Park, Ik-Keun;Park, Un-Su;Kim, Hyun-Mook;Park, Yoon-Won;Kang, Suk-Chull;Choi, Young-Hwan;Lee, Jin-Ho
    • Proceedings of the KSME Conference
    • /
    • 2001.11a
    • /
    • pp.246-251
    • /
    • 2001
  • The performance demonstration round robin test was conducted to quantify the capability of ultrasonic inspection for in-service and to address some aspects of reliability for nondestructive evaluation. The fifteen inspection teams who employed procedures that met or exceeded ASME Sec. XI code requirements detected the pinping of nuclear power plant with various cracks to evaluate the capability of detection. With data from PD-RR test, the performance of ultrasonic nondestructive inspection could be assessed using probability of detection and length and depth sizing of cracks.

  • PDF

Determination of the Initial Test Year for One-Shot System using Validity Assessment of Drugs (의약품 사용기간 평가 기법을 활용한 원샷시스템의 최초시험 연수 결정)

  • Park, Ji M.;Lee, Hong C.;Jang, Joong S.;Park, Sang C.
    • Journal of Applied Reliability
    • /
    • v.17 no.1
    • /
    • pp.1-10
    • /
    • 2017
  • Purpose: This study aims at omitting the initial testing of the ASRP by determining the initial test year. Methods: This study is to determine of the initial test year for one-shot system using validity assessment of drugs. Results: Procedures for determining the initial test duration of the one shot system and examples of omitting the tests are presented. Conclusion: Using this method, the time and labor required for testing can be saved by omitting the initial testing of ASRP.

Upgrading Acoustic Chamber and Verification Test (음향 환경시험 챔버 성능 개선 및 검증 시험)

  • Eun, Hee-Kwang;Im, Jong-Min;Moon, Sang-Moo;Choi, Seok-Weon
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.60-65
    • /
    • 2007
  • Acoustic chamber was developed for verifying the performance of a satellite under the launch condition on the Space environment test department. As the size of a satellite is increased the extension of existing facility is required. This paper encompasses the following items; redesign of components in acoustic chamber, product procedures of them and review of the test for the components of satellite in the upgraded acoustic chamber.

  • PDF

Identify Hypoid gear whine noise for Deflection test and Transmission error measurement (하이포이드 기어의 소음원인규명을 위한 디플렉션 테스트와 전달에러 측정에 대한 연구)

  • Choi, Byung-Jae;Oh, Jae-Eung;Park, Sang-Kil
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1040-1047
    • /
    • 2008
  • Hypoid gears are widely used in rear drive and 4WD vehicle axles. Investigation of their sensitivity to deflections is one of the most important aspects of their design and optimization procedures. The deflection test is performed in the actual gear mounting using completely processed gear. This test should cover the full operating range of gear loads from no load to peak load. Under peak load the contact pattern should extend to the tooth boundaries without showing a concentration of the contact pattern at any point on the tooth surface. Transmission error is tested on an axle assembly triaxial real car load condition.

  • PDF

Cryogenic Bearing and Seal Test Facility for a Turbopump (터보펌프용 극저을 베어링/실 성능시험설비)

  • Kwak, Hyun-D.;Jeon, Seong-Min;Kim, Jin-Han
    • 유체기계공업학회:학술대회논문집
    • /
    • 2005.12a
    • /
    • pp.341-347
    • /
    • 2005
  • To perform a cryogenic development test for Tribo-elements in a turbopump, a cryogenic bearing and seal test facility (BSTF) is designed and currently under construction in KARI. The working fluid is liquid nitrogen operating at a temperature $-197^{\circ}C$. The maximum operating pressure and volume flow rate of BSTF are 100 bar and 10 liters per second, respectively. The development tests of floating ring seals, inter-propellant seals (IPS) and cryogenic ball bearings in a turbopump will be performed using the BSTF. This paper briefly described design requirements and procedures of BSTF.

  • PDF

Unmanned WIG (U-WIG) Craft Design and Performance Test (무인 위그선 설계 및 성능시험)

  • Ahn, Byoung-Kwon;Jang, Jung;Song, Kwan-Hyung
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.45 no.4
    • /
    • pp.396-402
    • /
    • 2008
  • As demands for high speed sea transportations have recently been increased, various high speed ships appear. Among them the WIG is believed to be one of the next generation of the sea transportation system. Test flight of the 20 seaters WIG craft, Haenarae-X1, developed by MOERI was a success in August, 2007. Development of the large WIG is now ongoing, and it is expected to be commercialized in the near future. In this study we designed a remote controled WIG Craft and carried out its performance test in order to establish engineering design procedures of an Unmanned WIG (U-WIG) craft.

A Study on the Store Compliance Verification for KT-1P Aircraft

  • Kim, Dae-wook;Kim, Chan-jo;Wu, Bong-gil
    • International Journal of Aerospace System Engineering
    • /
    • v.2 no.2
    • /
    • pp.87-91
    • /
    • 2015
  • KT-1P for the Peru Air Force will be used as a utility aircraft with upgraded avionics equipment and arming capability based on KT-1 and KA-1. KT-1P should be shown for compatibility of new store loading configurations loaded with dispenser, bomb, and rocket based on aircraft-store compatibility test and evaluation procedures before KT-1P is operated as a light attack aircraft. The weapon system ground test for installation and flight test for envelope expansion including store separation are described in this paper, which was performed referring 'seek eagle program' under MIL-HDBK-1763 and MIL-HDBK-244A.