• Title/Summary/Keyword: Test Track

Search Result 920, Processing Time 0.034 seconds

A Study on the Construction of Test Track for Automated Guideway Transit (경량전철 시험선 구축에 관한 연구)

  • 정종덕;이안호;한석윤
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.447-454
    • /
    • 2000
  • As the AGT system has never operated in Korea, the construction of test track is essential to the acquisition of safety for the passengers. However, the test track is a synthetic system including vehicle, power system, signalling, track etc, several factors must be considered. In this paper, we suggest the general guideline for the test track of AGT system and test items on test track through the investigation of leading test facilities in the world. Through continuous study and investigation, we finally will build the test track to verify the reliability requirements between the train and infrastructures

  • PDF

Needs & Strategy for the Construction of Railroad Test Track (철도종합시험선로 구축 필요성 및 추진 기본전략)

  • Kim, Tae-Wook;Lee, Hee-Up;Choi, Won-Ill
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2107-2114
    • /
    • 2011
  • To carry out the evaluation of performance of railway product/system, 3 step verification process(design review-lab test-field test) should be done. In advanced countries, for the effective field test, test-only-oriented track have been constructed and used. In Korea, government announced "The construction plan of railroad test track" at 2009.06. This paper will summarize 'need of test track', 'technical meaning of test track', 'current status of foreign test track', 'fundamental plan and process strategy of Korea Railroad Test Track'. It is no need to say that the wisdom of all railroad related people is required for the successful construction and usage of Korea Railroad Test Track.

  • PDF

Experimental Study on Condition Evaluation for Railway Ballasted Track (자갈궤도의 상태평가를 위한 실험적 연구)

  • Choi, Jung-Youl;Bahng, Eun Young
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.152-157
    • /
    • 2018
  • The degradation and damage of the components for ballasted track could be caused a serious problem for railway safety. Therefore, the integrity evaluation of ballasted track condition is important to ensure and predict that the track safety and track maintenance. Various track components such as rail pad, ballast, sleeper, and rail that are widely used in Republic of Korea and represent a range of physical properties have been selected for this research. In this study, the experimental modal analysis was performed by the non-destructive testing. Modal test results were obtained from the field test and used to assess the condition of the track components. From the field test, the system of ballasted track was found to be simplified as a two-degree-of-freedom(2DOF) dynamic system. The condition of track component was found to directly affect the dynamic response of ballasted tracks. As the results, the dynamic properties of the track component was depend on the track condition and was distributed more roughly and over a wider range than its initial design values. Further, the methodology presented in this study is possible to determine experimentally the fundamental track parameters which are required in the numerical analysis, and also are useful for the safety assessment of track condition.

Irregularity Analysis of Maglev Test Track (자기부상열차 시험노선의 궤도틀림 분석)

  • Kim, Saang-Bum;Kang, Kee-Dong;Han, Hyung-Suk;Lee, Jong-Min
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2400-2404
    • /
    • 2011
  • Power spectral density (PSD) model of irregularities for the maglev test track is presented. Track irregularities (gauge, cant, twist and vertical) were calculated from the survey data of sleepers on the test track. PSD model was constructed from the estimated PSDs of each track irregularities. Versine (gauge, cant, twist, vertical and lateral) of the track is obtained and their PSDs were estimated, too. Presented PSD model can be used for the analysis of levitation stability and ride quality of the maglev system.

  • PDF

The Performance Evaluation of Newly Developed Concrete Slab Track (개발형 콘크리트 슬래브궤도의 성능평가)

  • Kang Yun Suk;Kim Eun;Lee Il Hwa;Yang Sin Chu
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.151-156
    • /
    • 2003
  • The purpose of this study is to establish the test procedure of concrete slab track and to estimate the performance of newly developed slab track. The basic direction of conceptual design of KRRI Slab track was determined in the viewpoint of running safety, economic efficiency and maintenance costs. Based on the research results, a detailed conceptual design of KRRI slab track is suggested. For the systematic development of slab track, a comparative study is carried out, comparing merits and demerits of each slab type, and used in the design process of slab track. Slab track tests were performed at lab and the slab track system was improved by the experiment result. Site Test also were performed in test slab track.

  • PDF

Test Construction of the Paved Track at Subway Main Line (도시철도 본선 토공구간에서의 포장궤도 시험부설)

  • Lee, Il-Wha;Kang, Yun-Suk;Kong, Sun-Yong;Kim, Sang-Jin;Lee, Shun-Gu;Jung, Yun-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF

Development of the Scale Track to Test Bogie Steering Performance (대차 조향 특성 시험을 위한 축소 트랙 개발)

  • Hur, Hyun-Moo;Park, Jun-Hyuk;You, Won-Hee;Park, Tae-Won
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.301-305
    • /
    • 2007
  • The performance of the railway bogie is classified into the stability and the steering performance. Testing for the bogie stability is conducted on the roller rig. But testing for the bogie steering performance on test facility is very difficult, so the testing for the vehicle curving performance is conducted on the real curve track. And it is desirable to test on the full scale test rig, but it caused many problems relating to test costs, test time. To overcome these problems, the small scale test rig is actively used in the field of bogie stability. Thus, in this paper, we have studied the scale track to test the bogie steering performance. For this, we designed the 1/5 scale test track equivalent to radius 200 curve and confirmed the validity of the testing for the bogie steering performance on the scale curve track through the testing using 1/5 scale bogie.

  • PDF

Construction and Evaluation of the Paved Track on Test Line (도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가)

  • Lee, Il-Wha;Shim, Jae-Gyu;Lee, Choon-Ho;Park, Kyun-Seo;Ryu, Kyoung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF

Management Plan on Test Track of Advanced EMU System (차세대전동차 시스템 시험선 운영 방안)

  • Lee, H.M.;Kim, G.D.;Park, S.H.;Oh, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1036-1037
    • /
    • 2008
  • Test track of the Advanced EMU system will be developed and organically combined with technologies of power supply system, signal communication system and track structure. The purpose of the test track is a acquirement of reliability and stability through a sufficient performance test. Therefore, this paper draws up all management plans for tests of the Advanced EMU system.

  • PDF

A Study on the Improvement of Test and Diagnosis Device for Audio Frequency Track Circuit (가청주파수 궤도회로의 진단 및 시험 장비 개선에 대한 연구)

  • Kang, Jang-Kyu;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.12
    • /
    • pp.147-155
    • /
    • 2010
  • We studied on performance improvement of TTM(TI21 Test Meter) that is test and diagnosis devices for jointless audio frequency track circuit on Korean electric railway TI21 standard. Upgraded devices is AD-TTM(Advanced TI21 Test Meter). This can measure alternating frequency USB(Upper signal band) and LSB(Lower signal band). In the audio frequency track circuit, ${\pm}17[Hz]$ of nominal frequency are demodulated and supplied to track relay through AND gate. It is important that measurement function which is error between USB and LSB. Need of AD-TTM will stand out in the electric railway system because this is simple and accurate rather than the former device.