• Title/Summary/Keyword: Test Cost

Search Result 3,991, Processing Time 0.043 seconds

SMI Compatible Simulation Scheduler Design for Reuse of Model Complying with SMP Standard

  • Koo, Cheol-Hea;Lee, Hoon-Hee;Cheon, Yee-Jin
    • Journal of Astronomy and Space Sciences
    • /
    • v.27 no.4
    • /
    • pp.407-412
    • /
    • 2010
  • Software reusability is one of key factors which impacts cost and schedule on a software development project. It is very crucial also in satellite simulator development since there are many commercial simulator models related to satellite and dynamics. If these models can be used in another simulator platform, great deal of confidence and cost/schedule reduction would be achieved. Simulation model portability (SMP) is maintained by European Space Agency and many models compatible with SMP/simulation model interface (SMI) are available. Korea Aerospace Research Institute (KARI) is developing hardware abstraction layer (HAL) supported satellite simulator to verify on-board software of satellite. From above reasons, KARI wants to port these SMI compatible models to the HAL supported satellite simulator. To port these SMI compatible models to the HAL supported satellite simulator, simulation scheduler is preliminary designed according to the SMI standard.

Error Correction of a Low-Cost Hybrid Navigation System (저가형 혼합항법시스템의 오차보정)

  • Lim, Samsung;Cho, Sung Jun
    • Journal of Advanced Navigation Technology
    • /
    • v.7 no.2
    • /
    • pp.156-161
    • /
    • 2003
  • In this study, a hybrid navigation system with a low-cost GPS Receiver plus Gyro and Odometer is developed and tested. This hybrid navigation system adopted a modified coupling method which can be distinguished from tightly coupled method or loosely coupled method, so that GPS receivers or Gyros or Odometers can be chosen arbitrary. Comparing to the existing hybrid navigation system, the test results show that this navigation system enhances the accuracy and is robust against the multipath error. It is also proven that this system has an advantage of acquiring GIS data for post processing.

  • PDF

A Study on the Standardization of IO Pins and Peripheral Modulesfor the General Microcontroller Training System (범용 마이크로콘트롤러 실습장비를 위한 입출력 핀배열 및 주변장치 모듈의 표준화에 관한 연구)

  • Lee, Hee-Yeong;Kim, Jai-Young
    • Journal of the Korea Computer Industry Society
    • /
    • v.8 no.4
    • /
    • pp.221-228
    • /
    • 2007
  • Many kinds of microcontrollers such as 8051, PIC16 and Atmega series are used for the automatic control system, home appliances and communication equipments manufacturing. It is very important to understand the basic operational principles of microcontrollers and their design concepts. There are many kinds of educational microcontroller trainers and also they are designed and assembled very complicatedly. For the students or developers, it is very difficult to catch the basic operation schemes and apply the techniques to the control system. And also it requires much cost and time for the various kinds of trainers purchasing. In this paper, standardization of pins layout and peripheral modules for the general microcontroller usage was introduced and tested with 89C2051, 89C51, PIC16F84, PIC16F877, Atmega8535 and Atmega128, etc. As a result of test, it was found that saving the cost and time using this suggested device was possible. And also it was very effective way to understand microcontroller design and programming techniques.

  • PDF

Study on short period effect of Marginal Loss Factor(MLF) in Cost Based Pool (CBP시장에서 한계손실계수(MLF)의 적용에 따른 단기적 영향분석)

  • Lee, Jae-Gul;Yoon, Yong-Beum;Ahn, Nam-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.43-45
    • /
    • 2006
  • Because Cost Based Pool(CBP) has any locational signals for electricity price, there are any locational incentives for construction of new power plant high efficient. in case of Korean electricity power market, this incentives are very important to reduce loss and congestion. This Paper represent the effect of MLF(Marginal Loss Factor) as locational price signal in short period. we investigate mathematically loss reduced effect of MLF and prove to reduce transmission loss using 3bus test system.

  • PDF

The Technology of Peak Demand Reduction using Automatic Water Tank Pumping System on the Apartment And Analysis of Effect of Energy Cost (아파트 고가수조 자동급수장치를 이용한 전력피크 감소 및 전력시장에서의 효과 분석)

  • Lee, Jae-Gul;Lee, Yun-Kyoung;Cho, Won-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2006.11a
    • /
    • pp.161-163
    • /
    • 2006
  • This paper introduce the technology of peak demand reduction using automatic water tank pumping system on the apartment. That systems on the apartments installed water tank can control pumping(electricity) demand. Generally, system peak demand is occurred at the same time on workday and many water pumps consume electric power randomly. At this point, shift of operating time of water pump can reduce peak demand using automatic water tank pumping system. We were operating this system on some apartments for test of effect of peak demand reduction. and we represent result of demand shift. This result suggests that spread of the automatic water pumping system can contribute to reduce system peak demand and reduce system operation cost.

  • PDF

Evaluation for the Test Installation of Slab Track by Using Precast Concrete Panels (Precast Concrete Panel을 사용한 슬라브궤도 시험시공에 대한 평가)

  • Kim Soon-Cheol;Kong Sun-Yong;Kang Jeong-Ok;Lee Jong-Min;Han Kwang-Seob
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1071-1077
    • /
    • 2004
  • This paper is presenting the performance evaluation on the installed concrete panels. As a result of the evaluation, the resistance to track displacement of temporary support structure was improved and it resulted in the improvement of work stability during installation. And, by the application of new technology and the saving of concrete consumption, both workability and cost were improved and, therefore, the shorter project period and cost saving can be expected. Furthermore, as a result of noise & vibration measurement at site, it has shown good effects of anti-noise and anti-vibration. In conclusion, this process was proved as very effective for track improvement.

  • PDF

The Organization of Interface Items for Rubber Tired AGT System of Light Rail Transit (경량전철 고무차륜 AGT 시스템의 인터페이스 체계 정립)

  • Lee, An-Ho;Kim, Jae-Min
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.98-103
    • /
    • 2003
  • Recently, to solve the urban transportation problem, the introduction of Light Rail Transit system has been proceeded positively. therefore, development of the Korean standard LRT system in which safety, efficiency and cost effectiveness are emphasized. The Korea Railroad Research institute study on Rubber Tired AGT system of Light Rail Transit to obtain the essential technology and engineering know-how, which leads lower LRT construction cost. In the development procedure, SE(system Engineering) is needed for combination of subsystem and optimum operation effect. This study is focused on the interface of LRT subsystem(Development of the rubber tired LRT, Power supply system, signalling and train control system, Elevated track structure for the rubber tired LRT), a important part of SE, to develop of the driverless LRT system and establish the test and evaluation.

  • PDF

An Embedded Web Server for Remote Monitoring the Semiconductor Equipment (반도체 장비의 원격 모니터링을 위한 임베디드 웹 서버)

  • 윤한경;임성락
    • Journal of the Semiconductor & Display Technology
    • /
    • v.2 no.3
    • /
    • pp.13-18
    • /
    • 2003
  • A remote monitoring system of the semiconductor equipment is used to monitor or control operations of the equipment. Most of the conventional monitoring systems are based on the client-server model with the general purpose PC. Basically, it implies the difficulties in the system reliability and cost down due to its size and complexity. To overcome these difficulties, we suggest an embedded web server which is based on the low-cost microprocessor. It is designed for the monitoring or controlling a dedicated equipment only. To evaluate the feasibility of the suggested embedded web server, we have implemented a test-board with ATMega103 and programmed the basic modules using the AVR-GCC. Finally, we have tested its operations on the MS Explorer 6.0 environment.

  • PDF

An Empirical Study of the Sido.Saeol System Service Quality : Local Government User Satisfaction and Job Satisfaction (시도행정·새올행정시스템 서비스 품질이 지방자치단체 사용자 만족도 및 직무 만족도에 미치는 영향에 관한 실증연구)

  • Kang, Du-Ho;Lee, Hyun-Kyu
    • The Journal of Information Systems
    • /
    • v.20 no.2
    • /
    • pp.135-154
    • /
    • 2011
  • The Sido.Saeol system, a local government information system cost too much for having been designed and developed during last four years but the effectiveness of this system is still open to doubt. Also maintenance cost is still too high and become increasing year by year. To find out the reasons and to suggest how to solve these problems, a service quality of an Sido Saeol system and the public servant's job satisfaction were investigated based on the Delone and McLean's updated IS success Model(2003). To investigate of the effectiveness of the Sido Saeol system, 8 variables are analyzed to test 3 main hypothesis. After all the analysis, we found that Sido.Saeol systems have many aspects to be improved for system use and job satisfaction and have to be revise in the aspects of system qualities.

Reliability growth management for the delayed fixes and development cost in the reliability growth development phase (신뢰성 성장 개발단계에서 지연수정과 개발시험비용을 고려한 신뢰성 성장관리)

  • Kim, Jun-Hong;Jung, Won
    • Journal of Applied Reliability
    • /
    • v.5 no.3
    • /
    • pp.381-391
    • /
    • 2005
  • The level of reliability attained largely depends upon the investment in reliability growth programs during development phase. In order to find the relationship between reliability growth test time and BRTE(basic reliability tasks effectiveness) in a reliability improvement program that minimizes LCC in which contains the reliability growth cost, repair and replacement costs, and spare parts ordering costs in service with given service rate in management policy, the growth rate has been suggested proper LCC versus growth rate. This model employs the reliability growth projection with delayed fixes in avionic equipment based on AMSAA.

  • PDF