• Title/Summary/Keyword: Tension Anchor

Search Result 117, Processing Time 0.026 seconds

Application of Removable Ground Anchor Using Auto back Equipment (Auto back 인장장치를 이용한 제거식 앵커의 적용성)

  • Lee, Song;Lee, Sung-Won;Park, Sang-Kook;Kim, Sa-Dong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.223-230
    • /
    • 2004
  • It is growing the application of the removal ground anchor with tension force for earth retaining constructions in the downtown. Nowadays, we can find the compression dispersion anchor on many site. But, it is occur some probelems in behabior of anchors because of impossible to tense p.c strand uniformly with existing equipment due to different length of p.c strand. So we tried to tense each p.c strand uniformly with auto back equipment in-situ test. This study compared and analyzed apply to elastic theory in-situ test results of an existing equipment with those of auto back equipment. As a result of the test, It has been proved that differences of tension force in the existing equipment increases with increasing the number of p.c strand. This can cause an ultimate failure of the concentrated p.c strand and a shear failure of ground. So it has been proved that auto back equipment is necessary.

An Optimum Design Method for Rock Anchors Subjected to Tension (인장력을 받는 락앵커의 최적 설계법)

  • Ham, Hee-Won;Kim, Hyun-Ki;Cho, Nam-Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1147-1153
    • /
    • 2009
  • The failure modes of rock anchors subjected to tension can be defined as follows: tensile failure of tendon, shear failure on tendon-grout interface, shear failure on grout-rock interface and tensile failure of rock. This study proposes a design method to induce the rock anchor systems to avoid the brittle failure by ensuring the minimum embedded length of rock anchors. Pull-out test results of full-scale rock anchors show that the proposed method is effective in predicting the design conditions expecting the ductile tendon failure.

  • PDF

A Case Study on the Stability Analysis for Masonry Retaining Walls and Backfill (석축구조물 및 배면지반의 안정성 검토사례연구)

  • Chun, Byung-Sik;Yeoh, Yoo-Hyeon;Kim, Kyung-Min
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.1
    • /
    • pp.149-160
    • /
    • 2001
  • In this paper, the stability analyses were performed for masonry retaining wallls in Seoul subway System. This masonry retaining wallls were reinforced with earth anchor system for the construction, but it was removed after construction. Therefore, the stability of masonry retaining wallls should be checked after the earth anchors removed. For stability analysis of masonry retaining wallls. FDM analysis(FLAC Ver.3.3) and slope stability analysis (SLOPE/W) were performed applying the test results from laboratory and field tests(Schmidt hammer test, cack examination). As conclusion, the tension force of earth anchors should be kept, therefore, substitutional method was required in order to keep the tension force of earth anchor system.

  • PDF

A Study on the Calculation of Load Resistance Factor of over Tension Anchors by Optimization Design (최적화 설계를 통한 과긴장 앵커의 하중-저항계수 산정 연구)

  • Soung-Kyu Lee;Yeong-Jin Lee;Yong-Jae Song;Tae-Jun Cho;Kang-Il Lee
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.4
    • /
    • pp.17-26
    • /
    • 2023
  • To consider the risk of damage and fracture of P.C strands, the existing post-maintenance system alone has the limitations, hence it is necessary to quantitatively evaluate and predict the deterioration, durability and safety of facilities and establish a reasonable maintenance system considering the asset value of facilities. Therefore, it is worth considering a preventive maintenance plan that allows proactive measures to be taken before a major defect occurs in the temporary anchor. This study devised a preventive over tension method, reviewed its effectiveness through design and field tests, by calculating the resistance factors by performing a reliability-based optimization design. At this time, the over tension anchor method was evaluated using the ratio of the residual tension force after the fracture of P.C strands to the effective tension force before the fracture of P.C strand, followed by the resistance factor calculated by the optimal solution for each random variables using Excel solver and applying it to the limit state equations. As a result of the study, if the over tension ratio is 125% to 130%, the remaining strands showed a high resistance effect even after the fracture of P.C strand. As a result of the optimization design, it was found that it is appropriate to apply the load factor (γ) of 1.25, and the resistance factors of Φ1, Φ2, Φ3 as 0.7, 0.5, 0.6.

Behavior Characteristics of Underreamed Ground Anchor through Field Test and Numerical Analysis (현장시험 및 수치해석을 통한 확공지압형 앵커의 거동특성)

  • Kim, Gyuiwoong;Ahn, Kwangkuk;Min, Kyongnam;Jung, Chanmuk
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.8
    • /
    • pp.37-44
    • /
    • 2013
  • The superiority of bearing ground anchor system has been recognized for the stability and economical efficiency since 1950s in Japan, Europe and etc. The ground anchor introduced in Korea, however, has the structural problem that the tensile strength comes only from the ground frictional force caused by the expansion of the wedge body and it is impossible to evaluate the bearing resistance because the adhering method of the anchor body to hollow wall is not appropriate. In this study, the underreamed ground anchor system was developed so that the bearing pressure of ground anchor can exert as much as possible. And the in-situ tests were performed to evaluate the pullout behavior characteristics and to verify the decreasing effect of the bonded length. The pullout tests were performed with the non-grouted tension condition and grouted tension condition in order to identify the pull-out resistance of each conditions. In addition, it was compared with the results of friction anchor. Finally, the numerical analysis was fulfilled to verify the bearing effect at the bonded part through the detailed modeling by PLAXIS-2D, which is general finite element method analysis program.

Behavior of Mooring Line of Silt Protector According to the Change of Sea Level (조위변화에 따른 오탁방지막 계류라인의 거동)

  • 홍남식;김정윤
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.14 no.3
    • /
    • pp.232-239
    • /
    • 2002
  • This paper studies the behavior of mooring line of silt protector according to the change of sea level. It is found from the analysis of the behavior that if the taut cable length has been determined appropriately within the range of safety factor, the tensioned cable has almost constant tension regardless of the water depth. The whole structure, however, becomes unstable due to the loss (zero tension) of the released cable tension. It is also recognized from the investigation for the effect of intial straight line angle on the behavior of mooring line that the design through the conceptually combined consideration of the cable tension, total scope and buoy deflection has to be required in the mooring analysis. Finally, the material of cable is not damaged because the cable tension is reduced by attached shellfish, but the whole structure may be also unstable by the effect on the anchor angle, total scope and buoy deflection.

Anchor and Mooring Line Analysis in Cohesive Seafloor (해성점토지반에 관입된 앵커 및 닻줄의 변형해석)

  • Han Heui-Soo;Jeon Sung-Kon;Chang Dong-Hun;Chang Seo-Yong
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.3
    • /
    • pp.37-43
    • /
    • 2006
  • An analytical solution method capable of determining the geometric configuration and developed tensile forces of mooring lines associated with fixed plate/pile or drag anchors has been developed. The solution method, satisfying complete equilibrium conditions, is capable of analyzing multi-segmented mooring lines that can consist of either chains, cables, or synthetic wires embedded in layered seafloor soils. The solution method utilizes a systematic iterative search method based on specific boundary conditions. This paper describes the principles associated with the development of the solution for the mooring line analysis. Comparisons of predictions with results from a series of field tests of mooring lines on various types of drag anchors are also described. Comparisons include the tension in anchor, the length of mooring line on the bottom, and the angle of mooring line at the water surface buoy. The results indicate that the analytical solution method is capable of predicting the behavior of mooring lines with high degree of accuracy.

An Analytical Study on the Strength Behavior of Column-Foundation Connection with High Tension Bolts (고장력 볼트 기둥-기초 연결부의 강도특성에 관한 해석적 연구)

  • Hwang, Dong A;Hwang, Won Sup;Ham, Jun Su;Jeong, Jin Il
    • Journal of Korean Society of Steel Construction
    • /
    • v.28 no.2
    • /
    • pp.121-128
    • /
    • 2016
  • In order to suggest a reasonable design for the circular concrete filled tube steel column-foundation connection applying high-tension bolts, Overall structural behavior and characteristics according to various variables of column-foundation connection are numerically analyzed using a commercial FE analysis program, ABAQUS. To that goal, finite element analysis is conducted on the basis of the previous study replacing anchor bolts to high-tension bolts, and the analytical results are validated by comparison with experimental results. Also, the various variables(embedded depth and grade of anchor, and height and thickness of rib) involved in behavior of the column-foundation connection are selected through analyzing the current design criteria, and the characteristics of the column-foundation connection are compared and analyzed according to the various variables. In case of the anchor bolts, Applying the high-tension bolts is more advantage and securing the embedded depth beyond 0.5D is recommendable. In case of the rib, a minimum of 0.5D for rib's height and $0.4t_b$ for rib's thickness should be secured to develop the structural performance.

Behavior Analysis of a Tension Leg Platform in Current and Waves (조류와 파랑 중의 인장계류식 해양구조물의 거동해석)

  • Lee, S.C.;Park, C.H.;Bae, S.Y.;Goo, J.S.
    • Journal of Power System Engineering
    • /
    • v.15 no.1
    • /
    • pp.64-71
    • /
    • 2011
  • The Tension Leg Platform(TLP) is restrained from oscillating vertically by tethers(or tendons), which are vertical anchor lines tensioned by the platform buoyancy larger than the platform weight. Thus a TLP is a compliant structure which allows lateral movements of surge, sway, and yaw but restrains heave, pitch, roll. In this paper, the motions of a TLP in current and waves were investigated. Hydrodynamic forces and wave exciting forces acting on the TLP were evaluated using the three dimensional source distribution method. The motion responses and tension variations of the TLP were analyzed in the case of including current or not including one in regular waves and effects of current on the TLP were investigated.

Horizontal Stress Analysis of Electric Pole using Earth Pressure Cell from Mock-Up Tension Test (전주의 실물인장실험시 토압계를 이용한 수평토압분석)

  • Ahn, Tae-Bong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.8
    • /
    • pp.62-69
    • /
    • 2010
  • Many electric poles in the softground have been collapsed due to external load. In this study, 10 types of tests were performed with variation of location, numbers and depths of anchor blocks as well as depth of poles to find horizontal earth pressure through full scale pull-out tests. The horizontal earth pressure increased with embedded depth of electric pole, and earth pressure of lower passive zone decreased. The deeper of anchor block, earth pressure of passive zone becomes less. 4 anchor blocks decreased earth pressure at G.L.-0.9[m]. It is considered that 4 anchor blocks installed along 80[cm] vertically are main reason. Overall, when more anchor blocks are constructed, excavation area is large, and constructivity such as backfill is bad, therefore one anchor block would be preferred.