• 제목/요약/키워드: Temporary work

검색결과 304건 처리시간 0.027초

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

중대재해사례와 직업강도를 고려한 건축공사 위험성 평가 (A Study on the Risk Rate of Work Type According to the Fatal Accident Cases and the Work Strength in Construction Work)

  • 이종빈;고성석;장성록
    • 한국안전학회지
    • /
    • 제21권4호
    • /
    • pp.102-107
    • /
    • 2006
  • Construction accidents have not decreased in spite of much effort such as new work methods, education and research related to safety works. Specially, many fatal accidents happened in construction works which involve the apartment, building, school, church, hotel, hospital, bank work and the other works. These accidents are mainly caused by unanticipated risk factors. From these reasons, this study researched fatal accidents which happened in construction works during last 13 years($1992{\sim}2004$) and analyzed the input workers and a work period of construction work. According to the input workers and a work period, the results are as following. During 13years($1992{\sim}2004$), the fatal accidents, related to the construction work, were happened to the 1,977 cases. These results were occupied the 21.32% of the total industry accidents. According to the result of the construction, the fatal accident rate of a concrete form work was the highest rate of 16.24% (321 cases) and a temporary work, a steel frame work was the each rate of 12.39%(245 cases), 10.07%(199 cases). Comparing to other work types, the fatal accident rate of those three work types(concrete form work, temporary work, steel work) was represented highly. We surveyed input workers and work period of construction work site. From the result of survey, input workers of a concrete form work were occupied with 13,720. The risk rate of the work type, which was considered input workers and work period, was represented 0.3622(a steel frame work), 0.1142(a temporary work), 0.0782(a tower crane) and 0.0772(a concrete work).

독일의 '경과적 일자리 중심 노동통합형 사회적기업'과 공공부문의 재정건실화 - 기이센(Landkreis Gie${\ss}$en)의 사례를 중심으로 - (Temporary Work-intagration Social Eenterprise and Fiscal Consolidation in Germany - Focus on the Fall of the Community Gie${\ss}$en -)

  • 박수지
    • 한국사회복지학
    • /
    • 제62권2호
    • /
    • pp.187-208
    • /
    • 2010
  • 본 논문의 목적은 1980, 90년대 독일의 '경과적 일자리 중심 노동통합형 사회적기업'이 공공부문의 재정건실화라는 의도를 통해 확대되는 현상을 분석하는 데 있다. 이를 위해 우선 독일 2차 노동시장의 개념과 유형을 고찰하고 2차 노동시장이 80년대 이 후 공공부문의 일자리창출 인프라로 지역사회에 정착되게 되는 과정을 분석하였다. 다음으로 2차 노동시장의 사회적기업이 공공부문의 재정건실화에 기여하고 있는 바를 기이센의 사례를 통해 <비용-편익> 분석으로 시도하였다. 마지막으로 독일의 경과적 일자리 중심 노동통합형 사회적 기업이 실업자 사회안전망으로 갖는 한계와 잠재력을 '공공부문으로의 종속화'와 '과도(過渡)노동시장의 형성'이라는 측면에서 논의하였다.

  • PDF

브레이싱을 이용한 자립식 흙막이 공법에 관한 연구 (A Study on the Self-contained Earth Retaining Wall Method Using Bracing)

  • 김종길
    • 디지털융복합연구
    • /
    • 제17권3호
    • /
    • pp.205-213
    • /
    • 2019
  • 건설현장의 굴토작업과 흙막이 가시설은 서로 밀접한 관계를 가지고 있다. 협소한 공간에서 가장 효율적으로 지하구조물을 축조하고 굴토작업시 외측 배면의 토사 이완을 방지하고 지하수위를 유지하기 위한 방안으로 안전성이 확보된 흙막이 가시설 설치는 반드시 필요하다. 본 연구는 기존 지하층 굴토공사에서 흙의 유실을 방지하기 위해 설치하는 가설흙막이를 종래에는 가설벽체를 형성하고 어스앵커, 래커, 스트러트 등을 이용하여 내부 지보를 하고 굴토공사를 시행하던 방식에서, RSB공법은 기존 재래식공법의 문제점을 개선하여, 내부 지보재를 제거하고 2열 엄지말뚝과 브레이싱을 이용하여 자립으로 토압에 저항하도록 하여 지반굴착을 진행하는 공법이다. 본 연구에서는 RSB공법 현장시범적용과 계측결과를 통하여 굴착방법에 따른 흙막이 가시설의 공법 적용성, 평가결과 발생변위가 모두 계측 허용치 만족하고. 기존 재래식공법에 비해 시공성과 경제성이 향상되었다.

강교량 설치 가설공사의 최적화설계 지원시스템 개발 (Development of Design Support System to Optimize the Temporary Work)

  • 조훈희;박재우;조문영;김정열
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.115-123
    • /
    • 2005
  • 강교량 가설공사의 설계는 그동안 과거유사사업의 자료를 토대로 설계자의 경험에 의존하여 진행되어 왔다. 이로 인해 실제 현장에서 소요되는 가벤트에 대하여 과대설계 논란이 있으며, 시공단계에 불필요한 설계변경을 야기하고 있다. 본 연구에서는 강교의 설계작업 과정에서 생성되는 설계 자료와 가설공사의 수행에 필요한 자원에 대한 데이터베이스를 구축하여 강교 설치 가설공사의 최적화설계 지원 시스템을 개발하였다. 이를 통하여 가설시설물에 대한 설계를 최적화하며, 설계변경을 줄이는 데에 기여할 뿐만 아니라 설계정보를 시공단계에 활용하게 함으로써 업무의 효율성과 정확성을 제고하였다.

가설구조물 안전성 확보 방안 연구 (Study on the Safety Assurance for the Temporary Structures)

  • 이정석;문성오;윤예빈;임남기;오태근
    • 한국안전학회지
    • /
    • 제33권1호
    • /
    • pp.73-80
    • /
    • 2018
  • According to the statistics publication of KOSHA, more than half of serious accidents at the construction sites were related to the temporary works and/or the temporary structures such as scaffoldings, shores, earth retaining walls, etc. The structural failures are occurred because of the overload acting on the structures or lack of performance of the one or more members of the structures. For the prevention of the collapse accidents relating to the temporary structures at the construction sites, we have to control construction processes not to occur the overload and also to control the performance and quality of each member of the temporary structures. MOLIT has amended the "Construction Technology Promotion Act" on Jan. 7th, 2015 to ensure the structural safety of the temporary structures. According to the Act, the designers of the construction design projects should check the structural integrity of the structures including the temporary structures and the construction companies have to let 'the Relative Professionals' confirm the structural integrity of temporary structures, the shores(${\geq}5m$ high) and the scaffolds(${\geq}31m$ high), before construction. Also, MOLIT has amended the "Regulation for Construction Technology Promotion Act" on Jul. 4th, 2016 for quality management and testing of temporary equipments. According th this regulation, the construction companies and supervisors should manage and test the temporary equipments before using them. In this paper, the standard drawings of the shores(< 5 m high) and the scaffolds(< 31 m high) and the amended "Business Guideline for Quality Management of Construction Work" are presented. As the result of this study, MOLIT noticed the amended "Business Guideline for Quality Management of Construction Work" on Jul. 1st, 2017.

외식업체 근로자의 내부마케팅과 식품 안전분위기의 관계 및 고용형태의 조절효과 (The relationship between internal marketing and food safety, and the moderating effect of employment type in food service industry)

  • 안관영;배중남
    • 대한안전경영과학회지
    • /
    • 제15권2호
    • /
    • pp.151-159
    • /
    • 2013
  • This paper reviewed the relationship between internal marketing(management support, education, pay system, internal communication, employment security) and food safety climate(prevention, superior attitude, work condition), and the moderating effect of employment type(permanent or temporary employees) in food service company. Based on the responses from 304 responses, the results of hierarchical multiple regression analysis showed that 4 factors(management support, education, internal communication, employment security) effect positively on food safety climate(prevention, superior attitude, work condition). The positive effect of internal communication on superior attitude and work condition appeared to be more positive in permanent employees than in temporary employees. And the results of t-test analysis showed that permanent employees perceived more positively all internal marketing factors(management support, education, pay system, internal communication, employment security) and food safety climate(precaution, superior attitude, work condition) than temporary employees.

건축건설공사의 재해분석에 관한 연구 (A Study on the Accident Analysis of Architectural Work)

  • 김정민;이종빈;장성록
    • 한국안전학회지
    • /
    • 제31권3호
    • /
    • pp.96-101
    • /
    • 2016
  • Previous literature has been investigated various aspects of accident occurrence and prevention in construction field. However, those studied were limited in that they only focused on the death accident without considering the loss time accident. Based on this, the goal of current study was to investigate the nature of the loss time accident, and compare the results with the death accident. Results showed that 1) the occurrence rate of death accident was significantly higher in the form work, temporary work, and steel frame work; 2) the temporary work showed significantly higher occurrence rate of the loss time accident and the death accident as compared to others; 3) ratio of the loss time accident to the death accident in domestic construction field was 50:1; 4) fall accident showed biggest occurrence rate in both the loss time accident and the death accident; and 5) more that 80% of workers in both the loss time accident and the death accident was between 41 and 65 years old.

무정전 배전공사를 위한 최적공법 연구 (A study on ptimal applications of interrupt free works on distribution lines)

  • 문수덕;이정관
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1456-1458
    • /
    • 1999
  • As the system reliability of power supply is highly increased, we need distribution maintenance techniques without any power interruption. To meet such an increasing demand, a groat deal of hot line work on the high voltage overhead distribution lines has been carried out. In this regard, Hot line work techniques has being applied widely. However, hot line work techniques can not cover all kinds of work without interruption. To cope with those problems, the temporary power supply work technique such as bypass cable truck technique, temporary switch technique and mobile transformer technique was developed and applied. This paper presents the most optimal method according to distribution work contents through the comparison and analysis the characteristis and problems of the existing various work techniques. Also this paper suggested the countermeasers of the prsent problems.

  • PDF

항만건설작업선의 선박안전법 제10조제3항(임시변경) 적용범위에 관한 연구 (Application Range of "Temporary Alteration" in the Article 10 of Ship Safety Act)

  • 손영태
    • 해양환경안전학회지
    • /
    • 제29권2호
    • /
    • pp.177-187
    • /
    • 2023
  • 「선박안전법」은 선박의 감항성(堪航性, Seaworthiness) 유지 및 안전운항에 필요한 사항을 규정하고 있으며, 이와 관련해서 이 법 제10조에서는 선박소유자가 선박검사를 받은 후 해당 선박의 선박검사증서에 적혀 있는 내용을 일시적으로 변경하고자 하는 경우에 임시검사를 받도록 하고 있다. 이와 같은 조치는 이 법 제15조에 따른 선박검사 후 선박의 상태유지에 따른 것으로 여기에는 「항만법」 제39조제1항에 따른 "항만건설작업선"을 포함하고 있다. 그러나 항만건설작업선은 본래 부선(艀船)과 동일한 운용체계를 보이고 있음에도 불구하고 「선박안전법」을 적용받지 아니하고 「건설기계관리법」에 따른 등록 및 검사·점검을 받아오다 2012년 12월 14일 울산항만 내에서 작업 중 발생한 "석정36호" 침몰사고를 발단으로 2016년 「항만법」이 개정되면서 「선박안전법」에 추가해서 적용받게 된 점 등을 고려할 때 항만건설작업선을 「선박안전법」에서 정하고 있는 모든 규정을 따르도록 적용하는 것은 현실적 한계가 있다 할 것이다. 이에 따라 본 논문에서는 항만건설작업선의 개념, 등록, 작업구역, 검사규정, 임시변경 적용사례 등을 통한 작업특성 및 실제 항만건설작업선의 「선박안전법」 적용범위와 관련해서 논란이 되고 있는 사항 등에 대해 살펴보고, 또한 「항만법」의 개정에 따라 항만건설작업선을 「선박안전법」의 검사대상으로 편입하게 된 입법취지 등을 통해 「선박안전법」 제10조에서 규정하고 있는 임시검사 중 "임시변경"에 관한 사항을 적용하는데 있어서의 그 적정범위를 제시하고자 한다.