The stringing load was added to tower design that consider the active load in 765kV transmission line construction. The nominal auxiliary members of steell tubular tower arm were altered into stress members by means of three dimensional design analysis method. 765kV transmission line construction also use self-standing tower that does not install temporary wire which support the section tower placed between drum field and engine field when stringing process.
The contribution of damage mechanisms to failure of steam turbine casing made of Cr-Mo-V steel was investigated. Creep-fatigue interaction on the HP side corner of turbine casing was revealed as the root cause of the catastrophic failure performed by metallurgical analysis. The steady-state pressure and transient thermal stress were analyzed based on the actual operating condition of the thermal plant. Damage of creep-fatigue interaction to crack initiation was evaluated with multiaxial effects. The contribution ratio of creep and fatigue to the crack initiation was estimated to 3:1. Temporary geometrical correct action with repair weld was executed. For long-term operation, design improvement of casing equipment for creep resistance should be needed.
In general steel sheet piles are used in the containment system, which are vertical barrier systems for waste disposal and landfill purposes, and roads in excavation for temporary structure. This paper presents case study of the use of an interlocking sheet pile for water and containment. Cut-off Z-type sheet pile joints are investigated to determine their permeability from the field test. Four different joint sealing materials are used in field test. The results showed joint permeability is significant time-dependent and joint-dependent. These are explored and conclusions on permeability characteristics of different sealants are noted. A case study gives a design example as well as suggestion on permeability and water tightness can be implemented in using the sheet pile barrier in civil and environment works. From the test results, the effective sealing programs of sheet pile interlocks are suggested.
This study was conducted to delineate plume occurred in hazardous waste disposal site. At first, CPT (Cone Penetrometer Test) rig and HydroPunch were used to collect depth-discrete groundwater samples in concerned area. However, it was not capable of sampling the groundwater due to the cone refusal where the residual clay are layered at nominal depth through the aquifer. Alternatively, a number of temporary wells were installed after each of locations was penetrated using a modified steel cone functioned by CPT rig. The samples taken from those of wells were characterized by GCMS and GCFID, which revealed that sulfolane and thiolane were mainly presented. Subsequent analyses performed for the samples taken from permanent nest piezometers consistently demonstrated that possible plume boundary can be presented in the study area where contaminants were found as low as detection limit or levels of not-detectable.
The main objectives of this studies are to present the most desirable rice processing complex model system in a given our situations by comparision and analyzing the major factors and, also recommend the future prospect of the rice processing complex in Korea. There are 3 different rice processing complex models in Korea. Those are concrete bin, flat type steel bin and square bin. These systems have a lot of differences and have their own characteristics such as capital requirement, efficiency, storage capacity and quality controls. The major problems of the existing rice processing centers in Korea are high fixed cost and the unbalnced systems. Following is summary to solve this problems: 1. Development of the large scale harvester and high speed continuous dryer. 2. Quality inspective system of bulk grain and large scale temporary storage facilities. 3. Large size readjustment of arable land. 4. Select the convenient location of rice processing center and formulation of well equipment facilities.
This study, with a view point to prevent accidents arising from steel structure, construction process, has taken an approach of reviewing related materials and construction safety guidelines, conducting questionnaire surveys and on field surveys. This study has also analyzed and classified accident cases and disclosed elements concerned with those accidents. A comparative analysis of the disclosed elements against the statutory provisions regarding industrial safety and it showed that strict observance of safety rules of the accident prevention measures in industrial safety standards will result in a decrease in accidents. It is concluded, however, that additional accident prevention measures, as suggested below, should be implemented for performing of more practical and positive accident prevention. 1) Thorough review and preparation at pre-working stage at sites : Such elements of fall preventing facilely as supporting ropes and steel fabrications for safety guard rails should be initially reflected on detailed drawings and shop drawings so that they can be installed in advance at fabricating plants. 2) Sets of steel frame stairs for work platform should be installed or secured with priority and temporary installation of such prefabricated platform as scaffolds should be installed in advance with those platform attached to the frame members on the ground whenever possible before they are lifted. 3) A decrease in the rate of accident by more than 10% on Tuesdays and Thursdays, has been shown from the accident analysis so schedule of construction process should consider possible weekday of high risk of accidents such as Tuesday and Thursday. 4) An array of systemized safety activities should be adopted, such as legal installation of safety facilities based on advance safety management plan, maintenance of safety for machinery and construction equipment, and strict compliance of safety rules by workers.
Purpose: Until now, many kinds of treatment modalities for facial bone fractures have been proposed. Among them, the semi-rigid fixation using miniplates has become the most popular procedure due to its simplicity and good clinical results. However, achieving anatomic reduction of bone fragments with miniplates may be difficult because of inadequate instrumentation for fracture fragment stabilization. We examined the use of inter-maxillary fixation screws or titanium screws tied with stainless steel wire to assist in positioning of fractured segment. Methods: We used this method for reduction in 50 cases of facial bone fractures. Inter-maxillary fixation screws or titanium screws tied with stainless steel wire were used to assist in aligning bony segment. Postoperative radiologic and clinical follow-ups were performed.Results: Radiologic follow-up showed correct reduction and fixation in all cases. Nonnunion and malunion were not shown. Clinical follow-up showed an satisfactory results. Conclusion: By using Inter-maxillary fixation screws tied with stainless steel wire, it was shown that reducing the bony segment to their preinjury position is easy to perform and it enables us to make more accurate reduction, ensure wider visual field.
철골세우기를 할 때, 불트의 가체결은 유용하게 이용될 수 있다. 그러나 만약 부재의 제작오차나 시공현장에서의 환경 등으로 인해 부재간 볼트 구멍이 일치하지 않는다면, 시공현장에는 이를 맞추기 위해 많은 노력과 수고를 피할 수 없을 것이며, 이는 시공기간이 길어지는 원인이 될 수 있다. 이러한 문제점을 해결할 수 있는 방법으로 접합부재를 과대구멍 또는 슬롯구멍을 만드는 방법이 있고, 이는 이미 유럽과 미국에서 연구되어 설계방법까지 제시하고 있다. 그러나 국내 설계방법에는 과대구멍 및 슬롯구멍에 대해 언급되고 있지 않다. 한편 국내의 설계방법 및 건설환경은 유럽과 미국과는 다소 차이가 있다. 따라서 국내 실정에 적합한 과대구멍과 슬롯구멍에 대한 설계방법이 필요하다. 따라서 본 연구에서는 실험을 통해 고력볼트 마찰접합부의 모재가 과대구멍 및 슬롯구멍에 대한 마찰계수를 결정하고 거동을 평가하였다.
현재 국내에서 하천/해상 교량 공사시 교량기초 설치를 위한 가시설로서 원형 단면의 가물막이(cofferdam)를 많이 적용하고 있다. 기존 케이슨(caisson), 시트파일(sheet pile), 셀(cell) 식 등의 가물막이 공법이 많이 활용되고 있으나 이러한 공법은 설치 및 해체시 많은 시간과 비용이 소요된다. 해상공사에서 가장 보편적으로 사용되고 있는 시트파일 공법의 경우 지반 관입에 의한 시트파일 손상과 요소 부재 연결 작업의 어려움으로 내적 및 외적 안정성 확보를 위해 주의가 필요하다. 본 연구에서는 서해안 연약지반을 대상으로 원형강관의 석션관입성 설계를 수행하였고, 현장실험을 통하여 원형강관 석션관입 시공이 가능한 것을 확인하였다. 그리고 표준관입시험(N치) 결과보다 콘관입시험(CPTu)을 이용한 지반 분석 결과를 설계에 적용하는 것이 현장 실험 결과와 보다 유사한 결과를 나타내는 것을 확인하였다. 또한 실트질 사질토 지반에서 상한석션압 이상의 석션압을 적용시 가물막이 내부의 국부적인 파괴(piping 현상)를 유발하는 것을 확인하였다.
최근 기상이변으로 인한 겨울철 폭설로 농가 시설물 중의 하나인 비닐하우스의 붕괴사고가 빈번히 발생하여 농가의 피해가 증가되고 있다. 하지만 이에 대한 정부의 대책이 미약하여 매년 붕괴사고가 일어난다. 프레임 붕괴의 주된 이유는 폭설시 저항할 수 있는 휨내력이 부족하기 때문이다. 본 연구에서는 현재 이용되는 비닐하우스에 인장타이로 보강한 실험연구를 수행하였다. 비닐하우스의 스팬은 6.5m이고, 단면은 두 가지 종류(${\phi}25.4{\times}1.5$, ${\phi}31.8{\times}1.5$)를 사용하였다. 비닐하우스의 곡선 보와 직선 기둥 연결부에 임시적인 인장타이로 스틸와이어와 로프를 이용하여 보강하였다. 프리텐션을 인장타이에 적용시켰고, 적설하중을 등가의 수직하중으로 파괴할 때까지 적용하였다. 무보강과 로프 보강을 비교한 결과 로프 보강의 붕괴하중이 10∼45% 증가하였고 무보강과 스틸와이어 보강을 비교한 결과 스틸와이어 보강의 붕괴하중이 58~73% 증가하였다. 강도와 관련해서는 비교적으로 스틸와이어가 효과적이나, 연결부 및 프리텐션 적용이 로프보다 복잡하고 어려우므로 로프가 더 효율적인 것으로 판단된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.