최근 산업이 대규모화함에 따라 고압 전력 변환 장치의 필요성이 증가하고 있고, 이에 따라 전력용 반도체 소자의 직렬 구동이 많이 이용되고 있다. 소자의 직렬 구동은 소자간에 적절한 전압 분배가 이루어져 개별 소자에 정격이상의 과전압이 인가되는 것을 방지하는 것이 큰 관건이다. 또한 고전압 회로에서는 부유 인덕턴스에 의한 소자의 과전압도 방지하여야 한다. 본 논문에서는 직렬 연결된 IGBT의 턴-오프 과도상태시 컬렉터 전압 기울기 조절로 안정된 전압 분배와 과전압을 방지하는 새로운 게이트 구동기법을 제안한다. 제안하는 게이트 구동기법은 컬렉터 전압을 검출하여 능동적으로 게이트 신호를 제어함으로써 과전압을 제한한다. 새로운 IGBT 게이트 구동회로를 제작하고 직렬 연결된 IGBT 회로에 적용하여 게이트 구동기법의 타당성을 검증하였다.
PURPOSES : Road lighting facilities increase the visibility of road at night in order to improve traffic driver safety and comfort. Generally speaking, current pole lighting has a tendency to create problems of glare and flicker. The phenomenon of glare gives discomfort due to increase of scattered light, when high luminance is in driver's field of view. The phenomenon of flicker occurs due to the driver passing through discontinuous pockets of pole lighting areas. These phenomenon increase eye strain and decrease driver safety. METHODS : Low height line lighting that distributes light lower than driver's eye level has been developed and evaluated to reduce the problems linked to current pole lighting. A test was undertaken with 4 conditions(turn on the general pole lighting, turn off alternate pole lighting, turn on the line lighting and line lighting with 50% dimming). A driver written survey was conducted in order to gain driver feedback. RESULTS : Pupil size and brow frequency compared with degree in pole lighting are reduced. CONCLUSIONS : Low height line lighting environment makes drivers more comfortable than pole lighting environment and is positive lighting method in the energy saving and landscape aspect.
When the inter-turn short circuit (ITSC) fault occurs, the distortion of the magnetic field is serious. The motor loss variations of each part are obvious, and the motor temperature field is also affected. In order to obtain the influence of the ITSC fault on the motor temperature distribution, firstly, the normal and the fault finite element models of the permanent magnet synchronous motor (PMSM) were established. The magnetic density distribution and the eddy current density distribution were analyzed, and the mechanism of loss change was revealed. The effects of different forms and degrees of the fault on the loss were obtained. Based on the loss analysis, the motor temperature field calculation model was established, and the motor temperature change considering the loop current was analyzed. The influence of the fault on the motor temperature distribution was revealed. The sensitivity factors that limit the motor continuous operation were obtained. Finally, the correctness of the simulation was verified by experiments. The conclusions obtained are of great significance for the fault and high temperature demagnetization of the permanent magnet analysis.
LED lamps are appropriate to the light source for use in broadcasting lighting. When the lighting frequency of LED lamp is different from the shutter frequency of camera, however, the flicker appears on the moving image which is taken by the camera under the dimmed light of LED lamp with conventional dimming methods. In this study, a new dimming method for the LED lamps used as the broadcasting lighting is proposed to minimize the flicker. A lighting period in the proposed dimming method is divided into the several sub-periods which have weight of the bits. Also, the proposed dimming method has characteristics that are optimizing the turn-on timings of two LED lamps to reduce the turn-off periods of the lamps and not to overlap the turn-on periods of the lamps. In the experiments, the incidence of the flicker is taken by the camera under several lighting conditions of the conventional dimming methods and the proposed dimming method. In addition, the brightness values of the frames are obtained in the moving image, and incidence of the flicker is evaluated and compared with conventional methods. From the results, the incidence of the flicker in the proposed method is more improved than the conventional methods.
In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.
lateral insulated gate bipolar transistors(LIGBTs) are extensively used in high voltage power IC application due to their low forward voltage drops. One of the main disadvantages of the LIGBT is its scow switching speed when compared to the LDMOSFET. And the LIGBT with reverse channel structure is lower current capability than the conventional LIGBT at the forward conduction mode. In this paper, the LIGBT which included p+ ring and p-channel gate is presented at the reverie channel structure. The presented LIGBT structure is proposed to suppress the latch up, efficiently and to improve the turn off time. It is shown to improve the current capability too. It is verified 2-D simulator, MEDICI. It is shown that the latch up current of new LIGBT is 10 times than that of the conventional LIGBT Additionally, it is shown that the turn off characteristics of the proposed LIGBT is i times than that of the conventional LIGBT. It is net presented the tail current of turn off characteristics at the proposed structure. And the presented LIGBT is not n+ buffer layer because it includes p channel gate and p+ ring.
KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
/
제4B권2호
/
pp.54-58
/
2004
This paper presents the iron core design method of a high temperature superconducting (HTS) transformer considering voltages per turn (V/T). In this research, solenoid type HTS coils were selected for low voltage (LV) winding and double pancake coils for high voltage (HV) winding, just as in conventional large power transformers. V/T is one of the most fundamental elements used in designing transformers, as it decides the core cross sectional area and the number of primary and secondary winding turns. By controlling the V/T, the core dimension and core loss can be changed diversely. The leakage flux is another serious consideration in core design. The magnetic field perpendicular to the HTS wire causes its critical current to fall rapidly as the magnitude of the field increases slowly. Therefore in the design of iron core as well as superconducting windings, contemplation of leakage flux should be preceded. In this paper, the relationship between the V/T and core loss was observed and also, through computational calculations, the leakage magnetic fields perpendicular to the windings were found and their critical current decrement effects were considered in relation to the core design. The % impedance was calculated by way of the numerical method. Finally, various models were suggested.
Kim, Sang-Cheol;Kim, Eun-Dong;Zhang, Chang-Li;Kim, Nam-Kyun;Baek, Do-Hyun
한국전기전자재료학회:학술대회논문집
/
한국전기전자재료학회 2001년도 하계학술대회 논문집
/
pp.1096-1099
/
2001
The basic design structure of RC-GCTs (Reserve-Conducting Gate-Commutated Thyristors) is firstly given in this paper. The bulk of wafer is punch-through (PT) type with high resistivity and narrow N-base width. The photo-mask was designed upon the turn-off characteristics of GCT and solution of separation between GCT and diode part. The center part of Si wafer is free-wheeling diode (FWD) and outer is GCT part which has 240 fingers totally. The switching performance of GCT was investigated by Dessis of ISE. The basic manufacture process of 2500V-4500V RC-GCTs was given in this work. Additionally, the local carrier lifetime control by 5Mev proton irradiation was adopted so as to not only to have the softness of reverse recovering for FWD but for reduction of turn-off losses of GCT as well.
Background: Losing balance during locomotive actions becomes an increasing threat to both the community-dwelling elderly and elderly with Parkinson disease (PD). Those with PD may be at a high risk of fall due to particular characteristics during the turn. Turning around during locomotive actions may be one of problematic factors causing losing balance. Objects: This study is part of a larger study, which in part aims to identify turning strategies, to compare the strategies in the elderly with and without idiopathic PD aged 51 years and older and to distinguish whether the turning strategies can predict the elderly at risk of falls. Methods: A total of 22 community-dwelling elderlies (10 elderlies with idiopathic PD and 12 healthy elderlies) were investigated for the turning strategies during the timed up and go test. Results: There were some significant differences between the two groups during turning (p<.05). The idiopathic PD group had a tendency of challenging on taking more number of steps, more time to accomplish and staggering more for the turn relative to the control group. Conclusion: Taking more number of steps and more time to turn may be useful for distinguishing the characteristics of PD from that of the healthy elderly in turning strategy.
This paper proposes a high-efficiency 3-kW hybrid ESS with emergency power supply. The proposed system enables efficient use of power from photovoltaic (PV) cells and energy storage system (ESS). The proposed system can operate as an uninterruptible power supply (UPS) when grid fault occurs, providing seamless transfer from grid-connected mode to stand-alone mode. The LLC converter for PV achieves ZVS turn-on of switches and ZCS turn-off of diodes, and the isolated bidirectional DC-DC converter for ESS achieves ZCS turn-off regardless of load condition, resulting in high efficiency. The efficiency and performance of the proposed hybrid ESS has been verified by a 3-kW prototype.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.