액화석유가스(LPG) 지하저장기지에서의 TSP(Tunnel Seismic Prediction)탐사

  • Cha, Seong-Su
    • Journal of the Korean Geophysical Society
    • /
    • v.5 no.2
    • /
    • pp.75-86
    • /
    • 2002
  • A TSP(Tunnel Seismic Prediction) survey which is modified VSP(Vertical Seismic Profiling) survey applied in tunnel was carried out at Pyongtaek and Incheon liquefied petroleum gas(LPG) storage cavern during excavation. The TSP survey in Pyongtaek LPG storage cavern which is located below Namyangho was performed to confirm the location and orientation of the fault detected at pre-investigation stage. The TSP survey was carried out in access tunnel, construction tunnel, and watercurtain tunnel to characterize 3 dimensional figure of the fault. The results of TSP survey are compared four in vestigation boreholes drilled in shelter of access tunnel. The fault was also detected by borehole survey and the location was coincided with the result of TSP survey. Depending on the result of TSP survey and core logging, the design such as cavern layout and length was changed. Another TSP survey was performed in Incheon LPG storage cavern which is located below sea. Because of poor geological information at pre-investigation stage and suffering from heavy leakage of groundwater, the TSP survey to detect fracture zone was carried out. The support and grouting design was reflected by the result of TSP survey.

  • PDF

Case histories on design alternatives during excavation of underground LPG storage cavern and traffic tunnel using TSP survey (TSP 탐사를 이용한 지하유류저장공동 및 도로터널의 시공 중 설계변경 사례 고찰)

  • Cha Sung-Soo;Kim Se-Hoon;Yun Sang-Pil;Bae Jung-Sik;Lee Jin-Moo
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.117-136
    • /
    • 1999
  • The geophysical survey at pre-investigation stage can hardly provide the detailed information on geological structure of site which has difficulty in access and thick overburden. The TSP (VSP applied in tunnel) survey at post-investigation stage can show the detailed geology ahead of tunnel and around cavern. The TSP survey was carried out at the Pyongtaek LPG storage cavern site during the cavern excavation and provided the location and orientation of the fault inferred below Namyangho. In order to confirm the result of TSP survey four boreholes were drilled in access tunnel. The fault was also detected by borehole survey and the location was coincided with the result of TSP survey. Depend on the result of TSP survey and core logging, the design such as cavern layout and length could have been changed. As another case history the TSP survey was performed at the Mumeuje road tunnel which has poor geological information due to thick overburden. The support design was also changed on the base of TSP survey.

  • PDF

Application of TSP Suvey to Predict the Ground Conditions Ahead of Tunnel Face (터널막장 전방 파악을 위한 TSP(Tunnel Seismic Prediction) 탐사 사례 연구)

  • Cho, Sung-Won;Lee, Hyo;Yoo, Jae-Won;Kim, Do-Hun Dave;Nam, Seung-Hyeok
    • Explosives and Blasting
    • /
    • v.31 no.2
    • /
    • pp.40-49
    • /
    • 2013
  • To predict ground conditions ahead of the tunnel face, seismic refraction survey has been widely used. But due to the development in seismic equipment and techniques, tomography using borehole and others are actively applied in recent years. This study has a purpose to prevent stability problems during excavation and construction of tunnels by predicting unfavorable ground conditions such as fault, fractured zone and rock quality variation zone ahead of the tunnel face using TSP survey equipment. In this study, the validity of predicting ground conditions ahead of tunnel face by TSP survey has been evaluated through the case study in the road construction site.

Use of the Tunnel Seismic Prediction Method for Construction of Spillways at Juam Dam (터널 내 탄성파탐사(TSP)기법의 주암댐 보조여수로 적용 사례 연구)

  • Bae, Jongsoem;Chang, Chandong
    • The Journal of Engineering Geology
    • /
    • v.23 no.1
    • /
    • pp.67-77
    • /
    • 2013
  • We conducted a Tunnel Seismic Prediction (TSP) survey in a spillway tunnel at Juam Dam to predict the locations of major discontinuities ahead of the tunnel face. We compared the results of the TSP survey with those from pre-construction inspections (including a surface resistivity survey and borehole investigations) as well as with direct tunnel-face mapping during excavation. The TSP method predicted the locations of major fracture zones that were unnoticed in the pre-construction inspections. The reinforcement patterns planned on the basis of pre-construction inspections were changed on the basis of the TSP results. The results demonstrate that TSP surveys are a cost-effective and reliably accurate method of predicting the locations of fracture zones. Although the TSP method has some limitations, these results suggest that the method is generally useful for predicting geological conditions prior to tunnel face construction.

Survey of Traveling Salesman Problem

  • Kim, Chang-Eun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.22
    • /
    • pp.65-69
    • /
    • 1990
  • Two different algorithms for traveling salesman problem(TSP) will be discussed. One is the engineering approach to the TSP. The other one is Branch-and-Bound algorithm to take advantage of the special structure of combinational problems. Also a generalization of TSP will be presented.

  • PDF

2 Dimensional TSP Modeling Using Finite Element Method (유한 요소법을 이용한 2차원 TSP 모델링)

  • Lee, Hong;Suh, Jung-Hee;Shin, Chang-Soo
    • Geophysics and Geophysical Exploration
    • /
    • v.6 no.1
    • /
    • pp.13-22
    • /
    • 2003
  • TSP (Tunnel Seismic Profiling) survey is a technique for imaging and characterizing geological structures ahead of a tunnel face. The seismic modeling algorithm and the synthetic data could be helpful for TSP surveys. However, there is few algorithm to describe the propagation of the elastic waves around the tunnel. In this study, existing 2-dimensional seismic modeling algorithm using finite element method was modified to make a suitable algorithm for TSP modeling. Using this algorithm, TSP modeling was practiced in some models. And the synthetic data was analyzed to examine the propagation characteristics of the elastic waves. First of all, the modeling for the homogeneous tunnel model was practiced to examine the propagation characteristics of the direct waves in the vicinity of the tunnel. And the algorithm was applied to some models having reflector which is perpendicular or parallel to the excavation direction. From these, the propagation characteristics of the reflected waves were examined. Furthermore, two source-receiver arrays were used in respective models to investigate the properties of the two arrays. These modeling algorithm and synthetic data could be helpful in interpreting TSP survey data, developing inversion algorithm and designing new source-receiver arrays.

Seismic reflection imaging ahead of tunnel face using 3 component geophones (3성분 지오폰을 이용한 막장전방 예측 탄성파탐사)

  • Jo Churl Hyun;Cha Young Ho;Yang Jong Hwa;Bang Ki Moon
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.412-417
    • /
    • 2005
  • To ensure the safety of the tunnelling without the loss of economy, the tunnel seismic profiling(TSP) method for the prediction ahead of tunnel face, begins to be used routinely in these days. TSP method does not interfere the tunnelling works while the horizontal drilling does, and its prediction length is longer than that of the drilling. Yet the most frequently adopted technique of TSP in Korea is the multi-shot and 2 receiver array using in-hole receivers, even though this array requires as many as 26 drill-holes for receiver installation and ballasting, which results in 3-6 hours of suspension in excavation work. In this paper, multi-receiver and lesser shot array using side-wall attached 3 component geophones is to be described to prove the efficiency in terms of the survey time as well as the reliability of the method by comparison of the predicted weak points and the face mapping results. The predictions mostly agreed with the real fractures or joint developed zones which have been confirmed during the excavation. It also has been found that TSP method can be effectively applied to perform draining ground water ahead of tunnel face by imaging the geologic discontinuities.

  • PDF

Development and application of 3D migration techniques for tunnel seismic exploration (터널내 탄성파 탐사의 3차원 구조보정기법 개발 및 현장적용)

  • Choi, Sang-Soon;Han, Byeong-Hyeon;Kim, Jae-Kwon;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.3
    • /
    • pp.247-258
    • /
    • 2004
  • Two 3-dimensional data processing techniques to predict the fractured zone ahead of a tunnel face by the tunnel seismic survey were proposed so that the geometric formation of the fractured zone could be estimated. The first 3-dimensional data processing technique was developed based on the principle of ellipsoid, The input data needed for the 3D migration can be obtained from the 2-dimensional tunnel seismic prediction (TSP) test where the TSP test should be performed in each sidewall of a tunnel. The second 3-dimensional migration technique that was developed based on the concept of wave travel plane was proposed. This technique can be applied when the TSP is operated with sources in one sidewall of a tunnel while the receivers are installed in both sidewalls. New migration technique was applied to an in-situ tunnelling site. The 3-dimensional migration was performed using measured TSP data and its results were compared with the geological investigation results that were monitored during tunnel construction. This comparison revealed that the proposed migration technique could reconstruct the discontinuity planes reasonably well.

  • PDF

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.

Prediction and Evaluation of Rock Mass Condition by Seismic Profiling Method in Tunnel (터널내 탄성파 탐사를 이용한 전방 지질 예측 및 평가)

  • Lee, Jong-Man;Kwak, Hyun-Joon;Kim, Young-Geun;Baek, Ki-Hyun;Cho, Chul-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.3
    • /
    • pp.45-56
    • /
    • 2001
  • It is very important to survey in construction for acquiring informations about geological structure which influence the tunnel construction. Usually, TSP(Tunnel Seismic Prediction) one of the seismic survey method in tunnels in Korea has been used for prediction of geological condition ahead of tunnel face, but in this study HSP(Horizontal Seismic Profiling) was used. As a result of field application, we predicted that there exist rock discontinuity such as fault, joints and bedding planes. In addition, RMR value from rock mass evaluation coincided with that from seismic survey for rock condition. We compared with rock classifications and evaluation results for proving.

  • PDF