Estimation of the excavation damage zone in TBM tunnel using large deformation FE analysis

  • Kim, Dohyun;Jeong, Sangseom
    • Geomechanics and Engineering
    • /
    • 제24권4호
    • /
    • pp.323-335
    • /
    • 2021
  • This paper aims to estimate the range of the excavation damaged zone (EDZ) formation caused by the tunnel boring machine (TBM) advancement through dynamic three-dimensional large deformation finite element analysis. Large deformation analysis based on Coupled Eulerian-Lagrangian (CEL) analysis is used to accurately simulate the behavior during TBM excavation. The analysis model is verified based on numerous test results reported in the literature. The range of the formed EDZ will be suggested as a boundary under various conditions - different tunnel diameter, tunnel depth, and rock type. Moreover, evaluation of the integrity of the tunnel structure during excavation has been carried out. Based on the numerical results, the apparent boundary of the EDZ is shown to within the range of 0.7D (D: tunnel diameter) around the excavation surface. Through series of numerical computation, it is clear that for the rock of with higher rock mass rating (RMR) grade (close to 1st grade), the EDZ around the tunnel tends to increase. The size of the EDZ is found to be direct proportional to the tunnel diameter, whereas the depth of the tunnel is inversely proportional to the magnitude of the EDZ. However, the relationship between the formation of the EDZ and the stability of the tunnel was not found to be consistent. In case where the TBM excavation is carried out in hard rock or rock under high confinement (excavation under greater depth), large range of the EDZ may be formed, but less strain occurs along the excavation surface during excavation and is found to be more stable.

Numerical evaluation of surface settlement induced by ground loss from the face and annular gap of EPB shield tunneling

  • An, Jun-Beom;Kang, Seok-Jun;Kim, Jin;Cho, Gye-Chun
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.291-300
    • /
    • 2022
  • Tunnel boring machines combined with the earth pressure balanced shield method (EPB shield TBMs) have been adopted in urban areas as they allow excavation of tunnels with limited ground deformation through continuous and repetitive excavation and support. Nevertheless, the expansion of TBM construction requires much more minor and exquisitely controlled surface settlement to prevent economic loss. Several parametric studies controlling the tunnel's geometry, ground properties, and TBM operational factors assuming ordinary conditions for EPB shield TBM excavation have been conducted, but the impact of excessive excavation on the induced settlement has not been adequately studied. This study conducted a numerical evaluation of surface settlement induced by the ground loss from face imbalance, excessive excavation, and tail void grouting. The numerical model was constructed using FLAC3D and validated by comparing its result with the field data from literature. Then, parametric studies were conducted by controlling the ground stiffness, face pressure, tail void grouting pressure, and additional volume of muck discharge. As a result, the contribution of these operational factors to the surface settlement appeared differently depending on the ground stiffness. Except for the ground stiffness as the dominant factor, the order of variation of surface settlement was investigated, and the volume of additional muck discharge was found to be the largest, followed by the face pressure and tail void grouting pressure. The results from this study are expected to contribute to the development of settlement prediction models and understanding the surface settlement behavior induced by TBM excavation.

쉴드 TBM터널 상부 지반 연약대 전기탐사 (Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling)

  • 정현기;박철환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

저궤도 지구관측위성 주탑재체 냉각유닛 설계와 열해석 (Design and Thermal Analysis of Focal Plane Assembly Cooling Unit of Earth Observation Camera)

  • 서정기;조희근;이덕규;이승훈;최해진;강석봉
    • 한국항공우주학회지
    • /
    • 제37권6호
    • /
    • pp.580-585
    • /
    • 2009
  • 본 논문은 항우연에서 개발 중인 위성 탑재카메라 FPA-CU(Focal Plane Assembly Cooling Unit) 의 개념설계 및 열설계에 대한 개략적인 내용을 기술하고 있다. FPA-CU은 국내 기술로 설계/제작되는 최초의 우주용 냉각유닛이다. FPA-CU에는 일반적인 히트파이프와 방열판을 이용한 냉각유닛과는 다르게 TBM(Thermal Buffer Mass)이 부착되어 있으므로 열적거동이 기존의 냉각유닛과 다르며, 설계에 있어 천이열전달 해석이 반드시 필요하다. 본 논문에서는 TBM의 용량산출 및 형상적 영향을 포함한 전체 냉각유닛 설계방법을 제시하고 전체 냉각유닛에 대한 열해석 결과를 기술하고 있다. 열해석 결과 냉각유닛의 요구조건을 잘 만족시킴을 알 수 있었으며, 최상단부 히트파이프가 비정상 작동하는 경우 FPA의 온도가 $3{\sim}4^{\circ}C$ 정도 상승함을 알 수 있었다. 본 연구를 통해 위성용 열제어 유닛 설계에 대한 국내 기술적 자립 가능성을 확인할 수 있었다.

암반강도 및 압입깊이에 따른 디스크커터의 최적간격 산정을 위한 개별요소법 기반 수치해석 연구 (A numerical study on the optimum spacing of disc cutters considering rock strength and penetration depth using discrete element method)

  • 이상연;송기일;정주환
    • 한국터널지하공간학회 논문집
    • /
    • 제22권4호
    • /
    • pp.383-399
    • /
    • 2020
  • 디스크커터의 간격을 최적화하는 것은 TBM 커터헤드의 설계의 핵심요소로, TBM의 굴진성능을 좌우한다. 실대형 선형절삭시험은 디스크커터의 간격 산정을 위해 가장 신뢰성 및 정확도가 높은 시험으로 알려져 있으나 실대형 실험을 위해 경제적 및 시간적 비용이 소요되는 단점이 있다. 본 연구에서는 개별요소법 기반의 수치해석 연구를 통해 암반의 일축압축강도 및 압입깊이에 따른 비에너지-S/P비 간의 경향성을 분석하였고, 17인치 디스크커터의 최적 간격을 도출하였다. 수치해석모델의 적정성을 검토하기 위하여 디스크커터에 작용되는 회전력을 CSM 모델과 비교·검토하였다. 선형절삭시험에 대한 수치해석 결과, 디스크커터에 작용되는 회전력은 CSM 모델의 이론식으로부터 도출한 회전력과 유사한 것으로 분석되었다. 5가지(50 MPa, 70 MPa, 100 MPa, 150 MPa, 200 MPa)의 일축압축강도에 대한 수치해석 결과, 암반강도가 증가할수록 디스크커터의 최적간격의 범위는 감소하는 경향을 보였으며 80~100 mm범위에서 최소 비에너지를 보이는 것으로 확인되었다. 이는, 기존에 보고된 디스크커터의 최적 간격과 일치되는 경향으로써, 본 연구를 통해 산정된 디스크커터 간격을 밑받침한다.

TBM 터널을 이용한 이방향 천공 발파공법의 3차원 동적해석 (Three Dimensional Dynamic Analysis of Newly Developed Drill and Blast Method with Bi-directions using TBM Pilot Tunnels)

  • 이찬우
    • 전산구조공학
    • /
    • 제8권1호
    • /
    • pp.30-38
    • /
    • 1995
  • 이방향 천공 발파공법의 실용성을 입증하여 실시공에 착수하기 위해서는 수치해석을 통하여 사전에 종방향 및 방사방향 천공발파에 따른 지표면에서의 지반진동의 영향을 알아보는 것이 필요하였다. 정확한 현장조건과 발파하중이 주어진 상태에서의 정밀해를 구하기 위해서는 시공상의 발파패턴대로 전체 발파공을 모형화하는 것이 필요하나 앞서 언급한 바와 같이 해석목적상 기존공법과 신공법의 지반응답의 차이를 비교하는 것이 주목적이였기 때문에 해석조건을 동일하게 가정하고 발파공도 대표적인 방향성을 가지는 1개공만을 선택하여 해석을 수행하였다. 기존 종방향 천공 발파공법과 신공법인 이방향 천공 발파공법의 상대적 비교를 위한 3차원 동적 해석결과, 관심의 대상이 되는 터널 직상부의 경우 기존의 종방향 천공 발파에 비해 이방향 천공발파는 진동이 두드러지게 감소함을 알 수 있었으며 이는 발파공의 방향성에 따라 지반응답이 크게 영향을 받는다는 것을 의미한다. 따라서 터널굴착시 문제시 되는 지상구조물의 위치에 따라 발파공의 위치를 적절히 조절함으로써 문제발생 예상지역의 진동치를 감소시킬 수 있을 것이라 판단된다. 그러나 이러한 잇점은 확대발파전 파이롯트 터널이라는 자유공간이 존재할 때만 가능하므로 이방향 천공 발파공법은 TBM의 효용성을 극대화시킨 것이라 할 수 있다.

  • PDF

산악 TBM 터널에서 발생한 암반파열 현상에 대한 연구 (A Study of Rockbursts Within a Deep Mountain TBM Tunnel)

  • Lee, Seong-Min;Park, Boo-Seong
    • 한국지반공학회논문집
    • /
    • 제19권6호
    • /
    • pp.39-47
    • /
    • 2003
  • 암반파열 현상은 암반 내에 축적된 변형에너지의 급작스러운 방출로 인해 발생한다. 심부 광산에서는 이런 현상이 자주 발생하여 주요한 재해 중 하나로 다루어졌으나, 터널에서는 극히 드물게 나타나는 현상이었다. 따라서 터널 내암반파열 현상에 대한 국내역사는 짧은 편이며, 정보도 제한적이어서 그와 관련된 연구는 거의 없는 실정이었다. 그러나 최근에는 터널의 심도가 깊어짐에 따라 터널내 암반파열 현상이 종종 보고되고 있어 터널의 안정성 문제뿐만 아니라 시공 중 재해 측면에서 볼 때 이에 대한 연구가 절실히 필요할 것으로 사료된다. 본 연구에서는 TBM 터널에서 취득한 암반파열현상 관련 자료의 분석을 통하여 그 현상을 포괄적으로 이해하는 방법을 제시하고자 하였다. 암반파열이 발생한 본 연구 터널의 현장자료 분석결과에 의하면, 대부분의 암반파열은 터널의 막장과 운전석 내에서 주로 발생하였으며, 일부 구간에서는 파열현상이 20일 이상 지속되기도 하였다. 또한 본 터널에서의 암반파열은 터널막장, 터널측벽 및 터널천장 등 터널의 모든 주변에서 발생하였고, 그 파열 깊이는 대부분 100cm 이하인 것으로 조사되었다. 본 연구에서는 이러한 암반파열 자료를 이용하여 암반파열 가능성을 취성도와 일축압축강도를 이용해 평가할 수 있도록 새로운 규준을 제시하였으며, RMR, 굴착공법, 굴착속도 및 터널심도 등이 서로 연관되어 암반파열 현상에 큰 영향을 준다고 판단된다.

매개변수 분석을 통한 단층파쇄대의 소단면 쉴드 TBM 터널 굴착 시 최적 보강영역 연구 (A study on the optimal reinforcement area for excavation of a small cross-section shield TBM tunnel in fault fracture zone through parameter analysis)

  • 강병윤;박형근;차재훈;김영진
    • 한국터널지하공간학회 논문집
    • /
    • 제22권3호
    • /
    • pp.261-275
    • /
    • 2020
  • 쉴드 TBM 공법을 사용해 단층파쇄대에 소단면 공동구 터널을 굴착 시 과다한 내공변위 및 붕락 발생 가능성이 높다. 단층파쇄대로 인한 트러블 및 공기증가로 인한 공사비 손실을 최소화하기 위해 적절한 지반보강이 요구된다. 본 연구에서는 단층파쇄대의 폭, 단층점토의 존재여부, 토피고 지하수위를 매개변수로 하여 MIDAS GTS NX (Ver. 280)을 이용한 수치해석을 통해 최적보강영역을 제시하고 주변지반 거동을 알아보았다. 그 결과 단층점토가 없는 경우 최대 0.5D 만큼 지반보강 적용 시 내공변위 및 지표침하 기준을 만족하였으며, 높은 투수계수로 인해 0.5D의 차수보강 적용이 필요하다고 판단된다. 단층점토가 존재할 때 내공변위 및 지표침하는 최소 0.5D에서 최대 터널 상부 단층파쇄대 전체에 지반보강 적용 시 안정성확보가 가능하였으며, 단층점토로 인해 지하수 유출량이 기준치 이내로 발생하여 차수보강이 불필요하였다.

실시간 측정데이터 기반의 디스크커터 마모상태 판별 딥러닝 알고리즘 개발 (Development of deep learning algorithm for classification of disc cutter wear condition based on real-time measurement data)

  • 이지윤;여병철;정호영;김정주
    • 한국터널지하공간학회 논문집
    • /
    • 제26권3호
    • /
    • pp.281-301
    • /
    • 2024
  • 송전선로 지중화 사업의 일환인 전력구 터널은 쉴드TBM 공법에 의해 건설된다. 쉴드TBM 구성요소 중 디스크커터는 암반을 파쇄하는 중요한 역할을 수행한다. 마모한계에 도달하거나 편마모와 같은 파손이 발생함에 따라 적절한 교체가 이루어져야 효율적인 터널 공사가 가능하다. 본 연구에서는 실시간으로 측정된 디스크커터의 마모량과 회전수를 기반으로 디스크커터의 마모상태를 판별하기 위한 딥러닝 알고리즘 개발을 수행하였다. 실대형 굴진시험 결과를 통해 디스크 커터의 마모상태에 따라 측정데이터가 상이하게 획득되는 것을 확인하였다. 합성곱신경망 모델을 기반으로 실시간 측정데이터를 활용하여 디스크커터의 마모특성을 판별할 수 있는 알고리즘을 개발하였다. 합성곱신경망의 필터를 통해 데이터의 분포 특성을 학습할 수 있고, 이러한 패턴 특징을 통해 균등마모와 편마모를 분류할 수 있는 모델의 성능을 확인하였다.