• 제목/요약/키워드: System Scaffolding

검색결과 76건 처리시간 0.029초

비고츠키의 근접발달영역을 고려한 수학과 교수·학습 프로그램연구 (A Study on Mathematics Teaching and Learning Program based on Zone of Proximal Development of Vygotsky)

  • 강정미;최창우
    • East Asian mathematical journal
    • /
    • 제34권4호
    • /
    • pp.339-358
    • /
    • 2018
  • There has been researches for effective education. Among them, many researchers are striving to apply Zone of Proximal Development of Vygotsky which is emphasizing the social interaction in the field of teaching and learning. Researchers usually research based on individual or small group of students. However the math class in school relies on system that one teacher teach many students in reality. So this research will look for the effect that the teaching and learning program based on Zone of Proximal Development of Vygotsky by designing the teaching and learning program which is based on scaffolding structuring to overcome the zone of proximal development in many-students class. The results of this research are as follows: First, the studying program considered the theory of Vygotsky has a positive effect on improving the mathematical achievement of elementary student. Second, the studying program considered the theory of Vygotsky has a positive effect on improving the student's studying attitude upon mathematics.

Innovative Technologies and Their Application on the Construction of a 100-Plus-Story Skyscraper

  • Haowen, Ye
    • 국제초고층학회논문집
    • /
    • 제4권3호
    • /
    • pp.161-169
    • /
    • 2015
  • Experience on the construction of several 100-plus-story skyscrapers including Guangzhou West Tower, Guangzhou East Tower, and Shenzhen's KK100 is described considering the increasingly strong development trend of 100-plus-story skyscrapers in China. Difficulties in the construction of 100-plus-story skyscrapers are investigated. Four innovative construction technologies receive detailed descriptions: intelligently and entirely-jacked work platforms, formwork and suspension scaffolding systems ("jacking and formwork systems"), multi-function low-carbon concrete, 5D-BIM ("five-dimensional building information modeling"), and safe and rapid vertical transport, as they have found successful applications in actual projects. Popularized systematically as technical achievements, these technologies will significantly influence the construction of similar projects in the future, and produce more social and economic benefits.

로프를 이용한 고소작업의 안전성 향상을 위한 정책, 교육 및 장비활용의 합리화에 대한 고찰 (A Study on Rationalization of Policy, Education, and Equipment Use to Improve the Safety at Height Work Using Rope)

  • 임광섭;홍성철
    • 한국안전학회지
    • /
    • 제37권3호
    • /
    • pp.79-85
    • /
    • 2022
  • The annual statistics on fall fatality consistently show the dangers of working at height. The "Occupational Safety and Health Act" specifies legal restrictions on work at height using a scaffold. However, there are different classes of work at height, and some rely only on ropes. This study proposes education, training, and institutionalization of the "rope access work system." In brief, it was concluded that accurate instruction on the knot method and the setting of some standards were important. For this, the use of an integrated work chair harness equipment was suggested.

Proposing a Pre-service Teacher Training Program for the Gifted Education

  • Shin Myeong-Kyeong;Park Jong-Wook;Chung Byung-Hoon
    • 한국지구과학회지
    • /
    • 제26권4호
    • /
    • pp.347-357
    • /
    • 2005
  • Since 1998, an elementary teacher education institute in Korea has hosted the center for the gifted education. The institute hired undergraduate students to escort and liaison each class of the gifted student participants with assisting classroom activities. These liaison teachers observed the gifted classroom activities and evaluated them by using a given checklist and filling out pre-made evaluation forms. Currently this system is being transferred from part-time jobs for students to earn allowance into well organized pre-service teacher program focusing on the gifted education. In other words, the purpose of system is being shifted from how liaison teachers facilitate the gifted program to how the system helps the liaison teachers to be quality teachers for the gifted who can understand what the gifted are and how to facilitate them. Analyzed were the self reports of the liaison teachers regarding their perceptions and beliefs of the gifted and their education program. It was found participant liaison teachers purposed to have more live experiences with getting along with students as well. Liaison teachers’ perceptions on establishing a gifted teacher professional education sequence were reported in this study. The potential scaffolding of the pre-service teacher education program model of the gifted education was provided as a consequence of this study.

대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로- (Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge)

  • 조지훈;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.197-201
    • /
    • 2008
  • 국내 도로건설사업은 평균 단가 기준으로 개략공사비를 산정한다. 도로의 기초자료를 갱신함으로써 평균 단가를 수정하고 있으나 공사 특성을 전부 반영하기에는 미흡한 실정이다. 설계 진행단계에서 설계 대안을 평가하는데 활용할 수 있는 공사비 예측모델의 필요성이 제기되는 가운데 대표공정을 통해 표준물량을 산출하고 개략공사비 산정모델개발을 통해 실질적인 공사비 예측이 가능한 모델을 개발하고자 한다. 본 연구에서는 Prestressed Concrete Box Girder Bridge의 상부공사를 중심으로 연구를 수행하며 $2000{\sim}2007$년 사이에 수행되었던 구조물공 41건에 대한 기초자료를 수집하고 토목공사 수량산출기준에 의한 내역서를 기반으로 Grouping을 실시하여 대표적 특수교량인 ILM(Incremental Launching Method), MSS(Movable Scaffolding System), FSM(Full Staging Method), 그리고 FCM(Free Cantilever Method)등 교량 형식별로 총공사비에서 공사비 비중 및 해당 공종에서의 중요도가 높은 항목을 중심으로 설계 초기단계에서 가용한 정보 수준을 고려하여 대표공종 선정한다. 교량 형식별 선정된 대표공종을 살펴보면 P.S.C 강재설치 및 긴장작업/P.S.C BOX/자재대 및 자재운반비/철근가공 및 조립/증기양생/콘크리트 타설/거푸집/교면 방수/동바리 등 교량형식별 특수성을 제외하면 대표공종들이 순공사비에서 차지하는 비중이 비슷함을 알 수 있다. 공종들이 총공사비에서 차지하는 비율은 ILM(99.47%)/ MSS(99.22%)/ FSM(98.18%)/ FCM(98.12%)로 나타났다.

  • PDF

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • 제10권3호
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

혁신적 프리스트레스트 가시설 구조시스템(IPS)을 적용한 굴착면의 해석 및 설계 (Design of Building Excavation Plane in Innovative Prestressed Scaffolding(IPS) System)

  • 김성보;한만엽;김문영;정경환
    • 대한토목학회논문집
    • /
    • 제26권1A호
    • /
    • pp.163-171
    • /
    • 2006
  • 본 논문에서는 프리스트레스를 이용한 가시설 공법(IPS)에 적용되는 띠장을 이용한 굴착면의 해석 및 설계절차에 대한 연구를 수행하였다. 받침대의 갯수에 따라 설계토압을 받는 IPS 띠장의 초기 긴장력 계산식을 유도하였다. IPS 띠장으로 구성된 빌딩 굴착면의 전산해석을 위해 띠장은 뼈대요소, 지반은 압축력 전담요소, 케이블은 인장력 전담요소를 사용하여 등분포토압 및 편토압을 받는 굴착평면의 전산해석을 수행하였다. 긴장력과 설계토압에 의한 축력과 휨모멘트를 계산하여 축응력과 휨응력을 산출하고 합성응력검토를 수행하여 굴착면의 안전성을 검토하였다.

건설위험직종 작업자의 위험체감도 평가 (Risk Assessment for Hazardous Construction Work Recognized by Workers)

  • 손기상;이신재
    • 한국안전학회지
    • /
    • 제21권3호
    • /
    • pp.67-72
    • /
    • 2006
  • This study is to investigate the related materials such as domestic law regulation, research paper, research report, and the other material, and to suggest suitable counter measures, to find out hazard degree for its works of workers and work place through direct survey, in order to determine risk score of each hazardous work which is designated by the Government, without consideration of labour's consciousness against risk level at a site. Therefore, a new questionnaire survey related to the decision of risk level are made and distributed to find out what risk level each worker recognizes. Also, the authors tried to approach reasonable conclusions after discussing reasonability of qualification standard and improving ideas of worker at hazardous work places with worker, faculty member, H&S manager, labour union. And the results show hazard degrees by each work kind of the above: 3.75 for working with machinery, 3.7 for steel structure, 3.5 for operation of tower crane, 3.51 for retaining wall, 3.85 for form work, 3.46 for scaffolding are obtained. This quantified risk can be applied to establishing a reasonable system to keep safe against hazardous works.

Bacterial Overexpression and Denaturing Purification of VPS34-Binding Domain of Beclin 1

  • Baek, Jong-Hyuk;Jung, Juneyoung;Seo, Jeongbin;Kim, Jeong Hee;Kim, Joungmok
    • Journal of Microbiology and Biotechnology
    • /
    • 제26권10호
    • /
    • pp.1808-1816
    • /
    • 2016
  • As a scaffolding subunit of the PIK3C3/VPS34 complex, Beclin 1 recruits a variety of proteins to class III phosphatidylinositol-3-kinase (VPS34), resulting in the formation of a distinct PIK3C3/VPS34 complex with a specific function. Therefore, the investigation of a number of Beclin 1 domains required for the protein-protein interactions will provide important clues to understand the PIK3C3/VPS34 complex, of which Beclin1-VPS34 interaction is the core unit. In the present study, we have designed a bacterial overexpression system for the Beclin 1 domain corresponding to VPS34 binding (Vps34-BD) and set up the denaturing purification protocol due to the massive aggregation of Vps34-BD in Escherichia coli. The expression and purification conditions determined in this study successfully provided soluble and functional Vps34-BD.

PSC박스거더교 상부슬래브에서의 시간의존적 변형률 분포 (Distribution of Time-dependent Strains In the Top Slab of PSC Box Girder Bridge)

  • 김영진;김병석;곽종원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2006년도 춘계학술발표회 논문집(I)
    • /
    • pp.538-541
    • /
    • 2006
  • PSC(Prestressed Concrete) box girder bridges have been widely applied in Korea. A number of these bridges have been built by the segmental construction method in the longitudinal direction and(or) vertically along the cross-sectional depth with MSS(Moving Scaffolding System). An actual 2-span continuous PSC box girder bridge of Kyeongbu high speed railway was selected and instrumented with 96 vibrating wire embedded type strain gauges and 2 thermocouples. The long-term behavior of the bridge was monitored through two major points located at mid-span of the first span and at the internal support. Data collection started just after the casting of the first segment (U section). Concrete strain and temperature data were gathered regularly by a data logger (CR10) during 600 days under and after construction. According to this measurement, the parabolic longitudinal strain distribution in the top slab at mid-span is shown. And also, the same distribution at the interior support is shown. The compressive strains at the cantilever region are larger than at the web position and the internal part in the top slab. Strain difference largely happened during the early construction period.

  • PDF