• Title/Summary/Keyword: System Engineering Management Plan

Search Result 939, Processing Time 0.029 seconds

A Study on Creating the SEMP with Project Management Data for the Railway System Development (철도시스템 개발에서 프로젝트관리 데이터를 반영하는 시스템공학관리계획서 생성에 관한 연구)

  • Kim, Ung;Yoon, Jae-Han;Lee, Jae-Chon;Cho, Yun-Ok;Kim, Sang-Ahm;Yoon, Hyuk-Jin
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.393-397
    • /
    • 2007
  • During the complex systems development, a great deal of data are generated from both the systems engineering process and project management process, and also some data are required to be prepared for the system engineering management plan (SEMP). For the successful completion of the project, it is necessary to effectively manage all the data in order to maintain data consistency and traceability. To fulfill the necessity, this paper introduces the concept of an integrated data architecture and discusses its realization with $Cradle^{(R)}$(a computer aided systems engineering tool). Also, it was described how to automate the production of the SEMP in that working environment. The result of the approach, managing complex data efficiently in the systems engineering view, has been successfully applied in the Railway Safety Development Program.

An Expert System for Reliability Management (신뢰성 관리 전문가 시스템)

  • Kim, Seong-in;Chang, Hong S.
    • Journal of Korean Society for Quality Management
    • /
    • v.22 no.3
    • /
    • pp.152-160
    • /
    • 1994
  • This paper concerns an expert system for reliability management. The system includes data base, life data analysis, life testing sampling plans and system operation. PROLOG is used as a language with dBASE III+ for the data base management system and C for calculations and graphics. This system analyzing the data and selecting an appropriate sampling plan can be implemented on an IBM PC 386 or a higher level machine.

  • PDF

Basic Research on Mid-to-Long-term Management Plan of Purchased Land by Evaluating Ecological Function of Waterfront Area of Geum River (금강수계 수변구역의 생태 기능 평가를 통한 매수토지 중장기 관리 방안 기초 연구)

  • Seo, Jung-young
    • Journal of Environmental Science International
    • /
    • v.28 no.3
    • /
    • pp.371-384
    • /
    • 2019
  • The purpose of this study was to propose an efficient management plan for purchased land considering the hydrological, watershed characteristics and ecological functions of the target land and surrounding area based on the result of monitoring the water quality improvement effect obtained by purchasing the land in the watershed area in the Geum river system. For this purpose, this study investigated through literature review, and examined ways to apply them to this research by deriving implications from a comprehensive analysis of previous research cases. After that, the components of assessment were derived to evaluate the ecological function of the purchase land, and the ecological function evaluation model for each land and area was proposed. In order to select purchase and restoration priorities of the land, this study analyzed the ecological status of the purchased land in main watersheds and tributaries using Arc GIS ver 10.1. Through this, a process to select restoration priorities was developed. And this study constructed the integrated management process with proposing a mid - to long - term plan by integrating the purchased land valuation and restoration priority selection process. Based on this process, this study suggested an effective management plan for purchased land through the integrated ecological management system of lands purchased. It can be used systematically in appraisal valuation, land purchase system, restoration project, and follow-up management of land purchase.

A Study on Establishment and Control of the Quality Control Policy (품질관리 방침의 설정과 관리에 관한 소고)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.8 no.11
    • /
    • pp.35-43
    • /
    • 1985
  • In this paper we will concentrate on the Quality Control Policy which should be enforced as a part of the Total Quality Control considers the global concepts, the establishment Procedures, and the evolution and operation of Quality control policy to achieve effectively it. For enforcement of the Qualify control policy shall be focused for considerations : (1) suggestion of the optimum control policy (2) suggestion of a comprehensive plan and promoting method quality control (3) suggestion of matters that need special consideration at the time of decision of a comprehensive management of control policy thereof. (4) A comprehensive Proposal (5) suggestion of a plan for progress of the Quality control system and the supplementary plan In the future, accordingly, establishment d its own policy control level is desirably more reasonable, and the Total Quality Control System that employes the control efficiency of periodical and systematic and rationalization and radical reform of the enterprise management problem as the restrictive conditions must be applied for quality control system.

  • PDF

A Study on the Optimum Disaster Mitigation Activity to Establish the Early Counter System on the Industrial Accidents (산업체재난 조기 대응체계 구축을 위한 최적 재해경감활동 방안 연구)

  • Lee, Keun-Jae;Yoon, Myong-O;Lee, Won-Ho
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.9-20
    • /
    • 2010
  • This study indicates direction on establishment of the operational plan for disaster mitigation and its implementation for maintaining business continuity of the local company of the first step, and seeks plans for maintaining their continuity through the establishment of early counter system constructed for achieving lasting safe at the any disaster. For achieving it, we investigated the standard of disaster management selected by the government called "Incident Preparedness and Operational Continuity Plan" Guideline, and investigated a guideline to be easily applied to domestic companies. And, we also studied on how to build the operational plan of disaster mitigation and apply IT techniques to A corporation. Especially, this study indicates the models of establishment of risk assessment, impact analysis, prevention and mitigation plan, response management plan for the establishment of plan among 5 main steps on "Incident Preparedness and Operational Continuity Management" Guideline. We devised the plan to activate the disaster mitigation activity throughout the country. It shows the skills to be prepared to upgrade the level of disaster response in this study.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

The Method of Value System Management to support decision-making of Urban Regeneration Project (도시재생사업의 의사결정 지원을 위한 가치체계 관리 방안)

  • Kang, Hyun-Koo;Yu, Jung-Ho;Kim, Chang-Duk;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.139-150
    • /
    • 2009
  • Objective of Urban regeneration is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. This study is proposed that value system management applied the benefit management, value system, Quality Function deployment for a value conflict of urban regeneration. There is a reason to conflict value that value system is unstructured. Because this study is proposed to establish the process of value system, and applied this process to Se-woon 4th area urban regeneration project. This study is analyzed to divide value system of urban regeneration program into city level, district level, zone level in district. An analysis of value system obtained through '2020 urban master plan', 'the downtown recreate a comprehensive plan', 'Se-woon New town plan'. It is proposed that value system management method through Between values correlation analysis and the order of priority deduction. These are obtained to use Delphi technique and Analytic Hierarchy Process(AHP)

A Case Study on the Application of Configuration Management Process for the Development of High-Safety Railway Signaling System Based on International Standards (국제표준기반의 고안전성 철도신호시스템 개발을 위한 형상관리프로세스 적용사례 연구)

  • Choi, Yo Chul
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.2
    • /
    • pp.108-115
    • /
    • 2019
  • The activities of managing and controlling the configuration of a system component over its life cycle are critical tasks in developing a high safety system as well as general system development. These configuration management activities should be defined through the management plan at the beginning of the life cycle, and should be performed continuously and systematically until the end of the project after the system or product development is completed. In this study, the configuration management process applied in the development of high safety railway signaling system was introduced and an efficient application proposals of it was proposed. In particular, configuration management through the establishment of a configuration management system based on computer tools is one of the important activities of maintaining the configuration integrity of the system or product.

The Third Construction Technology Development Master Plan (제3차 건설기술진흥기본계획)

  • Ji Sang-Wuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-206
    • /
    • 2002
  • $\lceil$The Construction Technology Development Master Plan$\rfloor$ aimed to promote construction technology R&D and to use its result efficiently is a legal plan based on Construction Technology and Management Law and established every five years. Now $\lceil$The 3th Construction Technology Development Master Plan(The 3th Master Plan)$\rfloor$ is establishing by MOCT(Ministry of Construction & Transportation) because the 2th Master Plan is completed at 2002. The 3th Master Plan suggests 'Establishment of construction environment leading the world-wide construction market' as a long-term vision, and also presents basic targets ; 'Improvement of competitiveness through conducting construction project efficiently', 'Transform into technology-oriented industry'. It consists of 7 fields and 25 main subjects. The 7 fields are construction manpower, production system, environment, safety, construction information, construction engineering, construction R&D.

  • PDF