• Title/Summary/Keyword: Switch Control Program

Search Result 36, Processing Time 0.026 seconds

Design and Implementation of USB Module for Foot Switch (풋 스위치용 USB 모듈 설계 및 구현)

  • Lee, Jong-Hyeok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.8
    • /
    • pp.1849-1854
    • /
    • 2010
  • As for information system in hospital which digital hospital aims at, there are PACS(Picture Archiving and Communication System) and soon. PACS transfer and store various medical pictures which are occurring in hospital. The various medical pictures is captured by using keyboard or foot switch during a surgical operation. In this paper, foot switch USB module that can be mounted into a main foot switch case is designed and implemented, it is having a MCU circuit with a built-in micro-controller and a I/O interface having a maximum of five switch. we also developed foot switch control software program with various functions. The result of using the module in the hospital field confirms that the module operates safely.

A Fundamental Study for the Automatic Control System in Greenhouse Using Microcomputer(I) (마이크로컴퓨터에 의한 시설재배의 자동화에 관한 기초연구(I))

  • Kim, C.S.;Kim, J.H.
    • Journal of Biosystems Engineering
    • /
    • v.19 no.2
    • /
    • pp.99-111
    • /
    • 1994
  • Automatic control system using microcomputer that have been studied in greenhouse, however, it was very difficult operation with success due to handicap for a various conditions and cultivated plants. This study was performed in order to develop of the basic program and hardware system for automatic control in greenhouse, such as automatic supplying of water, liquefied fertilizer solution and chemical solution. The results were summarized as follows. 1. The program for soil moisture control used by the switch type tensiometer was well operated. 2. The proximity switch was applied as well to water level control but it was very expensive, so low-priced sensor has to be developed. 3. The water meter was not excellent for mixing control of liquefied fertilizer, chemical and water, so water meter for only agricalture has to be developed. 4. Interface system for this study was suited to the developed controller. 5. Automatic control system to supply for water, liquefied fertilizer and chemical solution that was well operated as a fundamental study for product of controller.

  • PDF

Development of the Limit Switch Box for a Ship and Its Performance Evaluation against Salt Water

  • Lee, Seung-Heui;Go, Seok-Jo;Lee, Min-Cheol;Kim, Chang-Dong
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1334-1338
    • /
    • 2005
  • A limit switch box is used for an indicator of a valve actuator. This device indicates an opening and closing of a valve or a throttle in the valve actuator. In a ship, equipments require safety and robustness because of a rough environment and a specific condition during a voyage. However, the limit switch box has been used in an indoor environment generally. This study developed a new limit switch box which can be used at an outdoor environment. This study designed the new limit switch box. The housing of the limit switch box was made by an aluminum die cast method with surface painting after anodizing or chromate coating. In order to evaluate the endurance of the housing, the endurance tests against salt water have been conducted. Experiment results showed that the proposed device provides a reliable performance against salt water.

  • PDF

A Report on Test Results of Pressure Operated Switch (압력스위치 성능시험보고)

  • Gwon, O-Seung
    • Fire Protection Technology
    • /
    • s.12
    • /
    • pp.5-9
    • /
    • 1992
  • This reoprt is explained about test results of pressure operated switch for automatic fire extinguishing systems. It may include pressure operated Switch for automatic water supply control valves for use in automatic fire suppression system for fire protection service. The testing program was progressed devided by Two testing items, extermal oppearane test and performance test. The object of this report is present the problem which appear from the analysis of test results.

  • PDF

Structure Design and Implementation of AC Servo Motor Control Program (AC 서보모터 제어 프로그램 구조 설계 및 구현)

  • Kyungah Kim;Joon-Young Choi
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.18 no.5
    • /
    • pp.209-215
    • /
    • 2023
  • This study proposes an AC servo motor control program structure and its implementation method to efficiently integrate 13 types of additional compensation algorithms into the basic FOC (field-oriented control) algorithm program. Various compensation algorithms are necessary to enhance the stability and performance of machine tools by compensating for interference from disturbances and vibrations. Each compensation algorithm is implemented as a separate, independent function and called from a switch-case statement in the ISR (interrupt service routine) of the PWM (pulse-width modulation) device. The advantages of this approach include facilitating not only debugging and testing but also reducing the possibility of errors during the program development phase. Thus, it is easy to add and activate each specific compensation algorithm for the program update during the program operation phase. The implemented motor control program was experimented with a single-axis feed shaft testbed driven by a commercial AC servo motor control drive board and a 750 Watts SPMSM (surface-mounted permanent magnet synchronous motor), and the results verified its normal operation and performance improvement.

A Study on the Design of Hardware Switching Mechanism using TCP/IP Communication (TCP/IP를 이용한 하드웨어 전환장치 설계에 관한 연구)

  • Kim, Chong-Sup;Cho, In-Je;Lim, Sang-Soo;Ahn, Jong-Min;Kang, Im-Ju
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.7
    • /
    • pp.694-702
    • /
    • 2007
  • The SSWM(Software Switching Mechanism) of I-processor concept using non-real time in-house software simulation program is an effective method in order to develop the flight control law in desktop or HQS environment. And, this system has some advantages compare to HSWM(Hardware Switching Mechanism) such as remove the time delay effectiveness and reduce the costs of development. But, if this system loading to the OFP(Operational Flight Program), the OFP guarantee the enough throughput in order to calculate the two control law at once. Therefore, the HSWM(Hardware Switching Mechanism) of 2-processor concept is necessary. This paper addresses the concept of HSWM of the HQS-PC interface using TCP/IP(Transmission Control Protocol/Internet Protocol) communication based on flight control law of advanced supersonic trainer. And, the fader logic of TFS(Transient Free Switch) and stand-by mode of reset '0' type are designed in order to reduce the abrupt transient response and minimize the integrator effect in pitch axis. The result of the analysis based on HQS pilot simulation using HSWM reveals that the flight control systems are switching between two computers without any problem.

AP-SDN: Action Program enabled Software-Defined Networking Architecture

  • Zheng Zhao;Xiaoya Fan;Xin Xie;Qian Mao;Qi Zhao
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.7
    • /
    • pp.1894-1915
    • /
    • 2023
  • Software-Defined Networking (SDN) offers several advantages in dynamic routing, flexible programmable control and custom application-driven network management. However, the programmability of the data plane in traditional SDN is limited. A network operator cannot change the ability of the data plane and perform complex packet processing on the data plane, which limits the flexibility and extendibility of SDN. In the paper, AP-SDN (Action Program enabled Software-Defined Networking) architecture is proposed, which extends the action set of SDN data plane. In the proposed architecture, a modified Open vSwitch is utilized in the data plane allowing the execution of action programs at runtime, thus enabling complex packet processing. An example action program is also implemented which transparently encrypts traffic for terminals. At last, a prototype system of AP-SDN is developed and experiments show its effectiveness and performance.

Study on a Program for Automatic Control of on/off Switch on Modem (MODEM의 자동제어기 & 프로그램에 관한 연구)

  • Han Sang-Do
    • Journal of the military operations research society of Korea
    • /
    • v.17 no.2
    • /
    • pp.123-134
    • /
    • 1991
  • one of the problems the users of DPS-6/45 used to face in the course of having access to work stations was that a telephone call has to be made manually every time to have receiver's modem on or off, and naturally it meant the waste of manpower as well as of time. A program has been worked out to automatically operate and control. utilizing the system clock within the main computer (DPS-6/45), the on/off switch on the modems. It has resulted in; 1) promotion in operability of the main computer, DPS-6/45 2) prevention of unnecessary telephone calls 3) curtailment of expenditure and manpower

  • PDF

Study on Transient Improvement through Governor Control under Asynchronous Transition of CTTS (CTTS의 비동기 절체 시 조속기 제어를 통한 과도 개선에 관한 연구)

  • Kang, Byoung-Wook;Chai, Hui-Seok;Han, Woon-Ki;Lim, Hyun-Sung;Kwon, Seung-Ok;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.11
    • /
    • pp.47-52
    • /
    • 2015
  • This paper derives the problems that occur when asynchronous transfer in case of phase, frequency, voltage between the emergency generator and the grid and proposed the countermeasure to solve this problem when the transfer switch replace ATS(Automatic Transfer Switch) with CTTS(Closed Transition Transfer Switch) for the non-interrupting switching. In order to simulate above cases, modelling was used the transient analysis program PSCAD/EMTDC. By using this, the customer installed emergency generator and the grid was implemented. We compared three cases of asynchronous transition based on the basic case and proposed improvement by controlling the governor of emergency generator.