Journal of the Korean Institute of Rural Architecture
/
v.21
no.4
/
pp.25-36
/
2019
The purpose of the study is to analyze how to document survey and repair data on wooden architecture culture assets. Documentation was analyzed in comparison to digital developments from the past to the present. Although the accuracy of survey equipment has been improved by digital development, survey drawing has not changed. For example, a 3D Scanner, survey equipment, was introduced but is being used for conversion into 2D data. Data provided by the drawing included in the survey and repair reports were not accumulated. As it stands, it is inaccessible and disorganized. Data generated from the survey, repair, and maintenance has to be consistent. A BIM system was proposed to integrate information on wooden architecture cultural assets.
PURPOSES : This study is to develop a automate road mapping system using ARASEO(Automated Road Analysis and Safety Evaluation TOol) for road management. METHODS : The road survey van named ARASEO(Automated Road Analysis and Safety Evaluation TOol) was used to generate highway drawings for Korea National Road number 37 automatically. In order to generate the highway drawings for purpose of road management, it is required to acquired the information for highway alignment, road width and road facilities such as safety barrier and road sign. Therefore the survey van acquired and analyzed the road width, median and guardrail data using rear side laser sensor of ARASEO and recognized the traffic control sign and chevron sign using foreside camera images. Also the highway alignment which is the basic information for highway drawing can be analyzed by acquisition the every 1m positional and attitude data using GPU and IMU sensor and developed algorithm. Finally, in this research the CAD based drawing software was developed to draw highway drawing using the analysis result from ARASEO. RESULTS : This study showed the comparison result of the surveyed road width and drawing data. To make the drawing of the road, we made the Autocad ARX program witch run in CAD menu interface. CONCLUSIONS : Using this program we can create the road center line, every 500m horizontal and vertical ground plan drawing automatically.
Journal of the Korean Institute of Landscape Architecture
/
v.25
no.3
/
pp.35-46
/
1997
The objective of this study is to investigate actual conditions of terrestrial vegetation part in Environmental impact statement, and to prepare a proposal for the efficiency of Environmental Impact Assessment. 13 E.I.S.s made out during 1996.6-1997.5. have been chosen and analysed with respect to scope of survey, item of survey, method of survey, and result of survey. Actual conditioins of terrestrial vegetation part in E.I.S. are summarized as follows : 1. The mean number of total participants in drawing up E.I.S. is 26.0 persons, that of participants in terrestrial vegetation part is 2.3 persons. 2. In case of planar project, the mean of scope of survey is 16.1 times as large as area of project . In case of linear project, the scope of survey has been determined arbitrarily. 3. The most part of survey has been dependent on literature, and field survey has been practically neglected. 4. Results of survey mostly missed the point that E.I.A. pursues. And proposals are as follows : 1. Participants in terrestrial vegetation part in drawing up E.I.S should be increased. 2. It is necessary to subdivide scope of survey in view of difference between planar project and linear project. 3. As for item and method of survey, field survey should be specially reinforced. 4. Several sheets of map as results of survey should be included in E.I.S. The vegetation map, the D.G.N. map, and the planting map should be included and drawn by smaller scale as possible.
Journal of Korean Society for Geospatial Information Science
/
v.15
no.3
/
pp.19-26
/
2007
The renewal update of the digital map constructed through NGIS has been conducted for the enhancement of usage, maintenance so that the latest data is guaranteed. The total update has been done every five years for five regions of the country using aerial photographs and satellite images. By launching the third phase of NGIS, the updating plan was changed from total to total or partial update including the real time update scheme. Furthermore, the update period was improved from five to two years and four years for a large and a small city, respectively. Therefore, it is necessary to develope a matching technique which combines various geographic information (such as drawing map, surveying drawing and map) with exact position on the digital map. In this study, we developed a matching algorithm based on central point and suggested a method which uses general surveying drawing for revision/update of the digital map. The general survey is conducted when a civilian development on lands are approved. Thus, the outcome from the survey, which is the general survey drawing, contains the latest various contents such as road, building, water pipe and manhole. A consistent and efficient method using the general survey drawing for near real time update of the digital map by applying the developed matching algorithm is presented.
Journal of the Korea Institute of Building Construction
/
v.8
no.2
/
pp.71-79
/
2008
The rebar work is very related to the safety and durability of the building. Recently, the rebar work is produced some serious problems due to the lack of skillful crafts-man and the rising cost of rebar materials. Many papers have dealt with the rebar work of the manufacturing system in plants with a view to improvement those problems. But, the research on the rebar work of the manufacturing system in field is in a insignificant condition. This study presents the following improvement schemes as a result. First, the education strengthening for evaluation on practical affairs, second, the reinforcement of drawing & management in shop drawing and finally the simplification of apartment rebar work in slab. Also, this paper aims at advancing apartment rebar work by the actual condition survey in slab work. The further research will be needed about the whole structure parts such as foundation, wall, girder and rebar truss-deck plate as one of the improvement methods.
This research aims at having a grip on the actual condition of vegetation distribution Byeonsanbando National Park and to propose a survey and drawing criteria for vegetation map. Thus, this research conducted a survey of the vegetation distribution on Byeonsanbando National Park through review of the literatures on vegetation surveys on the National Parks in the past and at the present and preparing criteria for survey and drawing of vegetation. The actual vegetation of Bye on san ban do National Park was classified into eight plant communities and other land; the Substitution forest, or natural forest was classified into four plant communities including Quercus variabilis community, deciduous forest, Pinus densiflora community, and mixed forest while afforested land was classified into four forest types: P. rigida forest, P. thunbergii forest, P. rigida forest, P. rigitaeda forest, P. rigida - thunbergii forest, etc. The area belonging to grade 7 in Nature Degree was found to be the largest, covering 69.1% in Byeonsanbando National Park while the area belonging to grade 9 was very rare, covering 0.36%. Thus, it is suggested that criteria for survey and drawing map needed for the systematic survey and management of vegetation in National Parks.
A production management system is developed to enhance both the information and productivity of ship and offshore plant deckhouse floor outfitting. The functions of the production management system for the deckhouse floor outfitting were reviewed based on a literature survey of several production management systems with respect to the ship building and architecture fields. This study investigated numerous daily production reports and their application to actual work places to utilize the system development. The developed scanned drawing-based production management (SDPM) system minimizes any loss and/or distortion of work information between the workshop and management office when applying a scanned production drawing to the daily report. The SDPM system increases the data objectivity, as well as intuitiveness of the information generation by adopting an efficient user interface, which makes it possible to perform image annotations on the scanned drawing for the daily production report while simultaneously interacting with the production management database. Applying the system operation to actual deckhouse floor covering work verified that it was feasible to use the SDPM system for production management in the ship outfitting work process.
Journal of Korean Society for Geospatial Information Science
/
v.10
no.1
s.19
/
pp.77-82
/
2002
This study try to attempt to manage on-line system of land cadastral by computing land registration information, for application to computerized cadastral work through Geo-Spatial Information System. And also, in order to consult D/B of cadastral information, cadastral non-coincidence area uncapable to D/B when land-survey, taking advantage of GSIS drawing made by the present condition drawing and the aerial photograph survey by general survey, makes actual cadastral control point by some selected investigators. And so, it can be compared and analysed by the result of the present survey and, through the interpretation of the relatives, it aims to improve the precision of survey technique in consulting cadastral information D/B in the future.
The field survey of a tsunami damage is carried out to collect and obtain real data. There data can be used to make the countermeasures against possible tsunami attackings. In the survey, many data collecting techniques such as interviewing with local people, taking pictures of the inundated field, recording the location by the GPS, measuring the level and distance of the maximum flood level can be used for practical and effective survey.
Korean Journal of Construction Engineering and Management
/
v.17
no.3
/
pp.3-12
/
2016
Recently, construction industry shows active expansion in overseas construction market. But the active work limited in construction work, on the other hand, design-drawing work is evaluated shortage of competitive power. So this study aim to improve the competitive of 'domestic design-drawing work'thorough objective evaluation. Objective evaluation is consist of 'design attribution'. Design attribution is based on the execution drawing and complement by existing reasearch, expert interview. And then, list up the 'design attribution' evaluation list to carry out a survey targeting hands-on worker. Survey is consist of 'Likert 5-point scale, FMEA method'. As a result, construction company and design company show different opinions in both relative position evaluation and importance evaluation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.