• Title/Summary/Keyword: Supply plan process

검색결과 159건 처리시간 0.025초

건설 프로젝트 공정관리에 있어서 Float 활용에 대한 기초연구 (A Fundamental Study on the Float Application of Construction Schedule Management)

  • 이상범;진유나;송진우;김정길
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.133-137
    • /
    • 2003
  • Float has been just recognized spare time for disposing of unexpected conditions as by-product of CPM(critical-path-method) calculations, in spite of important method for construction period, taking in material, human supply and cost reducation in construction process management. Also float necessary follow method of contract by ownership problem and effect construct management of use. The purpose of this study was to examine current recognition and application grade of float in construction project. In addition, the study proposes improvement strategies of float application for efficient progress plan and control.

  • PDF

SCM 개념의 통합 정보공유 계획과 적재대차 개선을 통한 물류비 절감방안 및 작업안전성 개선에 대한 연구 (A study about logistics costs reduction and improving work safety by way of stocking cart improvement and information sharing plan adopting the SCM theory)

  • 양두진;이창호;이공섭
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2005년도 춘계학술대회
    • /
    • pp.225-230
    • /
    • 2005
  • A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.

  • PDF

SCM 개념의 통합 정보공유 계획과 적재대차 개선을 통한 물류비 절감방안 및 작업안전성 개선에 대한 연구 (A study about logistics costs reduction and improving work safety by way of stocking cart improvement and information sharing plan adopting the SCM theory)

  • 양두진;이창호
    • 대한안전경영과학회지
    • /
    • 제7권2호
    • /
    • pp.41-56
    • /
    • 2005
  • A study is for the approach that we could reduce the logistics costs through uprising the efficiency, complying to the demand in time, stock management based on the general production plan in the point of SCM. We will take following steps to get the goal. First, we will overview the physical distribution expenses annually. Second, will find the main cause of optimal load loss by improper container and lack of delivery flexibility to the demand. Third, the goal will be inferred through the fast information share based on organic relationship, the establishment of general production plan, the improvement of stock management plan. By way of this process, it can be accomplished expense reduction as well as flexible establishment of the reduction of worker's load.

사물인터넷을 활용한 SCM 고도화 방안에 대한 연구 (A Study on SCM Improvement Plan using the Internet of Things)

  • 김민준;김영길
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2018년도 춘계학술대회
    • /
    • pp.553-554
    • /
    • 2018
  • 공급사슬 관리(SCM) 는 흔히 원재료가 완제품으로 되기 까지 다시 말하면 공급자에서 소비자로 전달되는 전체적인 절차(부품조달, 생산계획, 납품, 재고관리등)를 주로 통칭한다. 기본적으로 전통적인 공급사슬 관리는 비용 절감과 효율성에 주로 목적을 두고 있다. 하지만 비용절감과 효율성에만 목적을 두다 보니 신뢰성 확보가 상대적으로 부족하여 4차 산업의 중심이 Smart Factory 에 그대로 적용 하기에는 다소 무리가 있다. 본 논문 에서는 전통적인 공급사슬 관리 에 사물인터넷을 더하여 각 요소들을 자동 제어 하고 블록 체인을 이용하여 보안 또한 만족할 수 있는 형태의 공급사슬관리망 을 제안한다.

  • PDF

수주-생산-출하업무 프로세스 혁신 재설계 방법 및 추진사례 (A Reengineering Technique for Logistics Process Innovation and Case Study)

  • 박연기
    • 산업경영시스템학회지
    • /
    • 제22권50호
    • /
    • pp.293-302
    • /
    • 1999
  • This paper presents an efficient reengineering technique for the logistics process innovation which is the foundation of supply-chain management. Based on consulting experience on the domestic manufacturing firms, this paper provides promotion step for logistics innovation and six reengineering points including check system for customer's credit limit, check system of real-time inventory information, automatic system for sequential production plan, automatic order-release system, automatic packing system, and happy-call system for order-forward information. For each reengineering point, application cases in domestic industry are also presented.

  • PDF

항공기 제조업에서 생산계획 동기화를 통한 데이터기반 구매조달 및 재고관리 방안 연구 (A Scheme of Data-driven Procurement and Inventory Management through Synchronizing Production Planning in Aircraft Manufacturing Industry)

  • 유경열;최홍석;정대율
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제30권1호
    • /
    • pp.151-177
    • /
    • 2021
  • Purpose This paper aims to improve management performance by effectively responding to production needs and reducing inventory through synchronizing production planning and procurement in the aviation industry. In this study, the differences in production planning and execution were first analyzed in terms of demand, supply, inventory, and process using the big data collected from a domestic aircraft manufacturers. This paper analyzed the problems in procurement and inventory management using legacy big data from ERP system in the company. Based on the analysis, we performed a simulation to derive an efficient procurement and inventory management plan. Through analysis and simulation of operational data, we were able to discover procurement and inventory policies to effectively respond to production needs. Design/methodology/approach This is an empirical study to analyze the cause of decrease in inventory turnover and increase in inventory cost due to dis-synchronize between production requirements and procurement. The actual operation data, a total of 21,306,611 transaction data which are 18 months data from January 2019 to June 2020, were extracted from the ERP system. All them are such as basic information on materials, material consumption and movement history, inventory/receipt/shipment status, and production orders. To perform data analysis, it went through three steps. At first, we identified the current states and problems of production process to grasp the situation of what happened, and secondly, analyzed the data to identify expected problems through cross-link analysis between transactions, and finally, defined what to do. Many analysis techniques such as correlation analysis, moving average analysis, and linear regression analysis were applied to predict the status of inventory. A simulation was performed to analyze the appropriate inventory level according to the control of fluctuations in the production planing. In the simulation, we tested four alternatives how to coordinate the synchronization between the procurement plan and the production plan. All the alternatives give us more plausible results than actual operation in the past. Findings Based on the big data extracted from the ERP system, the relationship between the level of delivery and the distribution of fluctuations was analyzed in terms of demand, supply, inventory, and process. As a result of analyzing the inventory turnover rate, the root cause of the inventory increase were identified. In addition, based on the data on delivery and receipt performance, it was possible to accurately analyze how much gap occurs between supply and demand, and to figure out how much this affects the inventory level. Moreover, we were able to obtain the more predictable and insightful results through simulation that organizational performance such as inventory cost and lead time can be improved by synchronizing the production planning and purchase procurement with supply and demand information. The results of big data analysis and simulation gave us more insights in production planning, procurement, and inventory management for smart manufacturing and performance improvement.

신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

패스트 패션의 재고비용 최적화를 위한 상품공급 물량 산정 모델 (A Computation Model of the Quantity Supplied to Optimize Inventory Costs for Fast Fashion Industry)

  • 박현성;박광호;김태영
    • 산업경영시스템학회지
    • /
    • 제35권1호
    • /
    • pp.66-78
    • /
    • 2012
  • This paper proposes a computation model of the quantity supplied to optimize inventory costs for the fast fashion. The model is based on a forecasting, a store and production capacity, an assortment planning and quick response model for fast fashion retailers, respectively. It is critical to develop a standardized business process and mathematical model to respond market trends and customer requirements in the fast fashion industry. Thus, we define a product supply model that consists of forecasting, assortment plan, store capacity plan based on the visual merchandising, and production capacity plan considering quick response of the fast fashion retailers. For the forecasting, the decomposition method and multiple regression model are applied. In order to optimize inventory costs. A heuristic algorithm for the quantity supplied is designed based on the assortment plan, store capacity plan and production capacity plan. It is shown that the heuristic algorithm produces a feasible solution which outperforms the average inventory cost of a global fast fashion company.

시스템엔지니어링 수명주기를 고려한 도시철도 핵심장치 개발 전략 (A Development Plan for Core System of Urban Transit based on System Engineering Process)

  • 한석윤;김진호;안태기;이우동;신원식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.2005-2013
    • /
    • 2008
  • Urban transit is a large scaled complex system which combines rolling stocks, power supply, signal communications, tracks & stations etc. KRRI develops nine key devices since July, 2007 as a part of the second phase of project on the standardization of urban rail transit system, which include information-communication system, station facilities, AC-DC current electric power system in urban transit. We promote the project under two directions, i.e. user-customer oriented standardization and strategic standardization for leading technologies in urban transit. In this paper, we present development plan of these key systems in view of system life cycle based on system engineering standards KSX ISO/IEC 15288 which supplies the common fundamental frame to describe the life cycle of artificial systems. System engineering process of KSX ISO/IEC 15288 are helpful to efficiently develop those key devices, although it is difficult to apply the standard identically to the key devices with the varieties and characteristics.

  • PDF

공급사슬 관리 구축전략에 관한 연구: LG전자 사례 중심으로 (A study of SCM strategic plan: Focusing on the case of LG electronics)

  • 이기원;이상윤
    • 유통과학연구
    • /
    • 제9권3호
    • /
    • pp.83-94
    • /
    • 2011
  • 국내에서는 일부 대기업을 제외하고는 공급사슬 관리(SCM) 체제 구축에 매우 소극적이며, 중소기업들은 SCM관리의 개념조차 인식하고 있는 경우가 대 다수이다. 이는 공급망 비효율적 관리로 인한 국내 제조업체, 협력업체, 유통업체 및 물류업체들 재고관리 비용, 수요관리 비용 등 비 효율화를 초래하고 있으며, 나아가 국내 기업의 경쟁력 저하에도 큰 영향력을 미치고 있다. 그 이유는 공급사슬 관리(SCM) 태생적인 특징인 공급사슬 관리(SCM) 전체에 대한 정보 공유 및 프로세스 혁신과, 공급사슬 관리(SCM)가 갖는 광범위함 때문이라고도 할 수 가 있다. 이 논문은 성공적인 공급사슬 관리(SCM) 추진을 위한 공급사슬 관리(SCM) 관련 이론적 논의와 구축전략과 도입 및 성공사례를 연구 및 분석을 통하여 현상황에 대한 고찰과 개선방안에 대해서 제안해보고자 한다. 성공적인 공급사슬 관리(SCM) 추진을 위한 방안을 논의하기 위해서는 먼저 공급사슬 관리(SCM)에 대한 이론적 배경에 대한 고찰이 필요하다. 따라서 II장에서는 공급사슬 관리(SCM)에 대한 기본적인 개념과 필요성에 대해서 기술하고, III장에서는 현재 추진되고 있는 공급사슬 관리(SCM)에 대한 문제점에 대해서 기술할 것이다. 마지막으로IV, V장에서는 공급사슬 관리(SCM) 구축전략과 LG전자사례 및 결론을 기술할 것이다.

  • PDF