• 제목/요약/키워드: Subcontractor control

검색결과 14건 처리시간 0.026초

A Study on the Communication of Clothing Manufacturing Information (의류생산 정보의 커뮤니케이션)

  • 허은영;조진숙
    • Journal of the Korean Society of Costume
    • /
    • 제38권
    • /
    • pp.289-304
    • /
    • 1998
  • In Korean clothing industry, most of the manufactures produce garments by subcon-tractors partially or entirely. It is very often that the design part is remote from production part and there is miscommunication between these two parts resulting dissatisfaction to both. Therefore it is very important to communicate the manufacturing information clearly and quickly to produce garments exactly the design part intended. Also to automate the clothing out how to produce and use the information objectively and efficiently. As a first step of moving to automation, the purpose of the research is to find out how manufacturing information and data are communicated in clothing manufacturing at present. In order to follow the information flow of a cer-tain manufacturer, the case study method was used. The case study samples were 12 clothing firms of 13 brands. The results and suggestions are as follows :- 1. A manufacturing information is communicated through paper documents such as“Production Order”, sample and patterns. At present, a production order sheet is the most efficient communication media, which comprises most of the information being communicated. 2. A manufacturing information comprises control information on the product, design in-formation, pattern information, cutting information, material information, sewing information, production schedule information, quality control information, costing information and information about the subcontractors. 3. A manufacturing is not quite objective except pattern information and cutting information which is presented by CAD systems. The communication of design information and sewing information should be somehow more objective. 4. There is not much information from a subcontractor. Considering that a subcontractor is the other partener of the communication, more information from the subcontractor is required for both benefit. 5. A designer produce most of the manufacturing information, but the information is communicated through a production manager to the subcontractor. The difference between the information maker and information communicator can cause any miscommunication. In future automated manufacturing, it will be possible for the designer to communicate to the manufacturer directly from the early stage of designing.

  • PDF

Analysis on the submittal process for a small local environmental construction company: a case study (지역 소규모 환경건설회사의 제출/승인 절차 분석에 관한 사례 연구)

  • Lee, Do Gyun
    • Journal of Urban Science
    • /
    • 제6권2호
    • /
    • pp.73-80
    • /
    • 2017
  • A submittal, as a part of three main project management processes: production control, submittals and change orders, is the transmission of information from the subcontractor to the general contractor to the owner, architect, and structural engineer, for review and approval. The purpose of the submittal process is for submittals to be approved in order to start construction. This benefits the contractor by ensuring that the finished project will meet the expectations of the owner. This paper analyzed a case study regarding the submittal process for the local-based environmental construction company, which typically works as a subcontractor and may hire other subcontractors for additional work when applicable. The aim of this study was to roughly evaluate a project management process and understand the submittal process through the study of a case involving the local company.

  • PDF

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • 제27권A호
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF

Adjusting Planning Management and Control to the Owner Environment Case Study: Consultant Adjustment to the Owner Environment in Thailand

  • Sruntummakul, Apai;Leungbootnak, Narong;MIN, Vuthea
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권3호
    • /
    • pp.10-17
    • /
    • 2015
  • Consultant and owner play a very important role in the construction sector which is one of the main sectors in economic development. There are many stakeholders in a construction project including but not limited to: owner, consultant, contractor, subcontractor, and supplier. The consultant is the party who is to stay in close touch with the project owner, which both consultant and owner are considered as the main key stakeholders to make the project happen. It's not a simple task for a consultant to just implement the same style of management and control within various projects that are of a different background and character of owners. Thus, the adjusting plan management and control to the owner environment has been an essential technique to drive the project to success. The objective of this paper is to identify the significant management techniques for adjusting a plan of management and control to the owner environment in Thailand. The methodology is the identification throughout the analogous to abduction from literature review and our empirical observations of Future Engineering Consultants Co, Ltd. We have been in consultation for twenty-five years (25) in Thailand with 209 projects from both public and private owners. As a result, there are (1) Project management styles, (2) Personal style, (3) Owner expectation management, (4) Scope Management, (5) Time Management, (6) Cost Management, (7) Quality Management, and (8) Environmental Management. The input are: a clear defined goal, showing respect by giving good service, maintaining high quality, keeping in touch with owners, and resources. This would give the output of the project's success by meeting the owner's expectation and requirements.

An Integrated Control Problem of Secondary Sourcing and Inventory in A Supply Chain (공급체인에 있어서 이차원천과 재고의 통합적 통제에 관한 연구)

  • Kim, Sung-Chul
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • 제32권1호
    • /
    • pp.93-104
    • /
    • 2007
  • We consider a supply chain where products are shipped to warehouse from manufacturing system to customers. Products are supplied from either in-house regular manufacturing or the secondary source such as subcontractor. The inventory in warehouse is controlled by base-stock policy, that is, whenever a demand arrives from customer, an order is released to the manufacturing system. Unsatisfied demand is backlogged. The manufacturing system is modeled as M/M/s+1/c queueing system, and the orders exceeding the given limit care blocked and lost. The steady state distribution of the outstanding orders and the throughput of the manufacturing system are functions of the level of engagement In the secondary source. There is a profit obtained from throughput and cost not only due to the engagement of the secondary source in the manufacturing system but also inventory positions. We want to maximize the total production profit minus the total cost of the production system by simultaneously determining the optimal level of engagement of the secondary source and the optimal base-stock level of the inventory. We develop two algorithms : one without guarantee of the optimal solution but with the small number of computations, the other optimal but with more computations.

An Enhanced TACT Technique for Finish Work of High-rise Residential Buildings

  • Kim, Sun-Kuk;Son, Ki-Young;Joo, Jin-Kyu;Lee, Dong-Hoon;Lee, Sung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • 제11권4호
    • /
    • pp.396-406
    • /
    • 2011
  • Execution of the finish work for high-rise residential construction occurs when a mixture of work progresses simultaneously at each floor or sector and is carried on by highly-specialized subcontractor teams. Therefore, the finish work plan requires an effective scheduling method that interfaces between the work and the teams. In order to address these issues, the TACT technique is utilized in Korea. This technique is based on Line-of-Balance and Lean construction. However, according to recent case studies, finish work using TACT technique was frequently delayed with cost overruns because the work was performed without a detailed schedule control plan outlining the relationship between architecture and mechanical, electrical, and plumbing work. This paper describes the enhanced-TACT technique which provides a detailed work flow chart and TACT work template. With improved TACT technique, this paper will contribute to improved cash flow and reduced cycle time and provide quality improvement through work continuity.

BASIC RESEARCH OF SUB-PACKAGE PROBLEM IN KOREAN CONSTRUCTION INDUSTRY

  • Jinho Shin;Furusaka Shuzo
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2009
  • In the building construction, the specialist contractors play the important roles in the point of the quality securing. Therefore, it is very important for the construction industry to study the sub-package problem. The sub-package problem includes two problems which should be solved. One is to decide the scope of works of each specialist contractor, and another one is to decide the particular specialist contractor which carries out the work. However, the sub-package problem in Korea is not clarified yet, although the circumstance around it has changed rapidly. Many factors influence to the sub-package problem regardless of internal factors or external factors of the project. The general contractor usually decides the sub-package under considering the project conditions. In case of the internal factors, each general contractor manages the organization and materials. But the external factors are relatively more difficult to control and predict than internal ones. But out of the external factors, the legal system has very close relationship with a sub-package problem especially in Korean construction system. So, this paper clarifies relationship between the legal system relating subcontracting and the state of sub-package.

  • PDF

WHEN CM AT RISK MEETS VIRTUAL DESIGN AND CONSTRUCTION (VDC) IN CONSTRUCTION PHASE: CASE STUDY OF PRACTICIES IN U.S.

  • Joo-Sung, Lee;Sung-Kon, Moon;Ju-Hyung, Kim;Jae-Jun, Kim
    • International conference on construction engineering and project management
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.566-572
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this paper, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, for the general contractor, to recognize potential risks in previous to start construction works of subcontractor by means of virtual design and construction (VDC) must be essential to this end. The case study of practices on VDC in U.S in which CMR has been introduced can provide considerable aspects to implement it in Korea.

  • PDF

Impacts of the Establishments' Safety Behavior, Safety and Health Delivery and Communication on Occupational Safety and Health Policy Satisfaction

  • Choi, Seo-Yeon;Jung, Han-Suk;Ham, Joo-Hyun
    • Journal of the Korea Society of Computer and Information
    • /
    • 제24권8호
    • /
    • pp.151-158
    • /
    • 2019
  • In this paper, we conducted a study to understand the impacts of safety behavior, safety and health delivery and communication, which should be managed for the establishments' safety and health control on occupational safety and health policy satisfaction to utilize that as a material for preparing policy support and preventive measures. For this purpose, we conducted a statistic analysis with 2,970 establishments, utilizing the material, "2015 Occupational Safety and Health Company Survey". As a result, in the manufacturing industry, it turned out in the establishments with more than 300 workers, safety behavior, safety and health delivery and communication of the cooperative firm of the prime contractor were high. In addition, it turned out that safety behaviors had the biggest impact on occupational safety and health policy satisfaction in the manufacturing industry and safety and health delivery and communication had the biggest impact on occupational safety and health policy satisfaction in the construction industry and other industries. As for the relationship between companies, it turned out that safety behaviors had the biggest impact on that between the parent company and a cooperative firm of a prime contractor while safety and health delivery and communication on that between the prime contractor and the subcontractor. Through the results of this study, it is necessary to build up safety and health behavior and safety and health delivery and communication systems for the characteristics of the company, and it is expected that the effect of the safety and health control will increase when policy support is made accordingly.