• Title/Summary/Keyword: Straight installation

Search Result 53, Processing Time 0.022 seconds

Comparison of the Effects of Straight and Twisted Heat Trace Installations Based on Three-dimensional Unsteady Heat Transfer (열선의 직선시공과 감기시공의 동파방지 효과 비교를 위한 3차원 비정상 수치해석)

  • Choi, Myoung-Young;Jeon, Byoung-Jin;Choi, Hyoung-Gwon
    • Fire Science and Engineering
    • /
    • v.30 no.1
    • /
    • pp.49-56
    • /
    • 2016
  • This paper numerically examines, straight and twisted electrical heat trace installations for their anti-freezing effects on water inside a pipe. The unsteady incompressible Navier-Stokes equations coupled with an energy equation were solved to compare the two installation methods. The heat conduction of the pipe with a heat source interacts with the natural convection of the water, and the conjugate heat transfer was considered using a commercial code (ANSYS-FLUENT) based on a SIMPLE-type algorithm. Numerical experiments, were done to investigate the isotherms and the vector fields in the water region to extract the evolutions of the minimum and maximum temperatures of the water inside the pipe. There was no substantial difference in the anti-freezing effects between the straight and twisted. Therefore, the straight installation is recommended after considering the damage and short circuit behavior of the electrical heat trace.

Characteristics of Multipath Ultrasonic Flowmeter Installed Upstream and Downstream of Flow Disturbance Factors-Contraction, Expansion, and Tee Pipe (유동교란인자(축소·확대관, Tee관)상하류에 설치된 다회선초음파 유량계의 특성)

  • Lee, Dong-Keun;Cho, Yong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.36 no.8
    • /
    • pp.877-883
    • /
    • 2012
  • Multipath ultrasonic flowmeters are increasingly being used for the purpose of accurate flow measurement. However, an installation standard has not yet been established for these flowmeters, and this can cause considerable confusion during field installation. There is a need for a minimum straight run to ensure the measurement accuracy of a flowmeter installed upstream and downstream of flow disturbance factors-expansion, contraction, and tee pipes. Experiments were performed by using multipath flowmeters that have less than ${\pm}0.5%$ accuracy-4-paths 1-unit and 2-paths 1-unit are of foreign make, whereas 5-paths 2-units are of domestic make-to determine the straight run under the above conditions. We carried out experiments repeatedly by considering a straight run, velocity, and suggested installation standards for a multipath ultrasonic flowmeter that satisfies the tolerance limits.

Coordinate and Length of Straight Transmission Line Minimally connecting X-Y axis via a Specific Point (특정지점을 경유하며 X-Y 축을 최단거리로 연결하는 전선로의 길이 산정)

  • Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.65-70
    • /
    • 2015
  • Minimal line length enables low-cost construction of the transmission lines and low-loss transportation of electric power. This paper presents a derivation to determine the coordinate and length of the straight line that minimally connects two perpendicular lines x-axis and y-axis via a specific point, using the optimization technique. The author shows a formula to obtain the minimal length, which is represented by the cube root of the coordinate given by the specific point. Case studies have been also discussed to prove the optimal solutions derived by the proposed formula.

Calculation and Mitigation of Magnetic Field Produced by Straight Line-Conductor with Finite Length (유한장 직선도체에 의한 자계의 계산 및 감소대책)

  • Kang, Dae-Ha
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.6
    • /
    • pp.57-67
    • /
    • 2011
  • Purpose of this study is to find the mitigation method of magnetic field by finite length multi-conductors such as indoor distribution lines and to be applicable to design of the distribution lines. For this purpose, exact formula about the components $B_x$, $B_y$, $B_z$ of magnetic field need in case of straight line-conductor with finite length forward any direction. In this study simple formula of the components were deduced and by using these formula magnetic fields for various models of line-configurations were calculated. And also a calculation method of induced currents in conductive shield was presented and using this method, programing of calculation is relatively easy and calculation time is short. The magnetic field after cancellation by these induced currents was calculated. All of calculations were performed by Matlab 7.0 programs. Through the calculation results it could be obtained followings for the mitigation of magnetic fields. The separation between conductors ought to be smaller than smaller as possible. In case of 3-phase, delta configuration is more effective than flat configuration. In case of 3-phase, unbalanced currents ought to be reduced as possible.. In case of more than two circuits of 3-phase, adequate locations of each phase-conductor such as rotating configuration of 3-phase conductors are more effective. The magnetic shielding effect of the conductive shielding sheet is very high.

Effects of the Position of Potential Probe on Ground Resistance Measurements Using the Fall-of-Potential Method (전위강하법에 의한 접지저항측정에 미치는 전위보조전극 위치의 영향)

  • 이복희;어주홍;김성원
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.15 no.2
    • /
    • pp.97-104
    • /
    • 2001
  • The effects of the position of potential probe on the measurements of the ground resistance in the fa11-of-potential method are described. The ground resistance is theoretically calculated by applying the 61.8[%] rule, and then the potential probe is located on the straight line between the grounding electrode to be measured and the current probe. However, sometimes the grounding electrode to be measured and the measuring potential and current probes in on-site test might not be arranged on the straight line with adequate distance because there are building, roadblock construction and other establishments. Provided that the grounding electrode to be measured and the measuring potential probes are out of position on the straight line, the measurement of the ground resistance classically falls into an error and the measured ground resistance should be corrected. In this work, measurements were focused on the grounding electrode system made by the ground rods of 2.4 m long. The measuring error was increased with increasing the angle which is made by the 3-points of the grounding electrode to be measured, the potential anti current probes, and it was a negative. That is, all of the measured ground resistances ware less than the true ground resistance.

  • PDF

A Study on the Serial-Parallel Resonant DC/DC Converter for Contactless Power Supply System (비접촉 전원장치에 적용한 직.병렬 공진 DC/DC 컨버터에 관한 연구)

  • Hwang, Gye-Ho;Lee, Bong-Sub;Kim, Dong-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.5
    • /
    • pp.31-40
    • /
    • 2008
  • Recently, Contactless Power Supply(CPS) system has been broadly studied as a power supply system for Flat Panel Display(FPD) material transfer equipments. In mass production line, CPS systems on material transfer equipment are applied only in the straight sections with single operating vehicle. The formal CPS system was not adequate for curved section nor multiple operating vehicles. Therefore, this paper presents CPS system that consists of straight and curved section with multiple operation vehicles. The circuit topology of CPS system consists of full bridge configured serial-parallel resonant DC/DC converter. The control method for CPS system consists of duty control method on the primary power supply system to maintain constant resonant current. And the secondary power supply systems of multiple vehicles are self controled to maintain constant output voltage. Practically, the test result of dual vehicles on straight and curved section of material transfer equipments were satisfactory, and proved it's applicability on commercial use.

A Study on the Improvement Method for Efficient Service of E-GEN AED using Time and Spatial Data (시·공간 데이터를 활용한 E-GEN AED의 효율적 서비스를 위한 개선방안)

  • Beak, Seong Ryul;Kim, Jun Hyun
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.37 no.4
    • /
    • pp.253-265
    • /
    • 2019
  • In this study were analyzed the errors on the registration of details information, location of E-GEN (Emergency medical-GEN) AED (Automated External Defibrillator) installation site and the adequacy of spatial arrangement, which suggests an improvement methods of constructing an app or web based on time and space data for efficient operation of considering accessibility and usability. As a result of this study, first, it was not equal to each other for locations of each installation point of AED, that confirmed some area were dense or requiring additional installation. Second, it confirmed the inaccuracies in inputting and registering information about the installed location, such as the actual installation location information and the attribute information of the AED. Third, the main access node and the main address node were connected to a straight line that was found not be connected to the back door, the straight line, the stairs. Also, the opening times of AED installation sites varied according to the week and the season, the entrance was managed by the apartment management office in a separate place, it needs to be established on this information. In conclusion, it proposed a method to improve spatial equity and accessibility, a method to provide accurate distance and time according to actual movement routes in case of emergency, and a possibility of using each facility considering day and time.

Influence of guide vane shape on the performance and internal flow of a cross flow wind turbine

  • Son, Sung-Woo;Singh, Patrick Mark;Choi, Young-Do
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.2
    • /
    • pp.163-169
    • /
    • 2013
  • In order to make the vertical-axis cross flow wind turbine commercially feasible, a guide vane is adopted and the effect of the guide vane shape is examined in order to improve the wind turbine performance. CFD analysis on the performance and internal flow of the turbine is carried out for the wind turbine model. The result shows that when the guide nozzle is installed, almost over two times of power coefficient are achieved in comparison with the case of no guide nozzle installation. The guide nozzle acts as a role of suppressing the flow resistance at the blade passage, which is found when the guide nozzle is installed. Moreover, in this study, two kinds of the guide vane with a straight type and a curved type are adopted and compared. The curved guide vane nozzle produces higher power coefficient in comparison with that of straight guide vane nozzle.

A Variation of Fluorescent Lamp Efficiency by Input Frequency (입력 주파수에 따른 형광램프의 효율변화)

  • 김진환;장택수;장우진
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1996.11a
    • /
    • pp.37-42
    • /
    • 1996
  • By making a electronic ballast, which is needed to operate a fluorescent lamp, it is possible to make a small and light weight ballast with high efficiency. And more, by increasing an operating frequency, the efficacy of lamp is increasing. In this paper, the variations of efficacy of a fluorescent lamp versus input frequency are studied With two kinds of fluorescent lamp, i.e., straight type(10W) and compact type(13W). The results show that the efficacy of lamps are increasing as input frequency is higher, and over 80[kHz], the slope of the variations of efficacy are slowdowned.

  • PDF

A Study on the Support Design for Underground Excavation Based on the Rock-Support Interaction Analysis (암반-지보 거동분석에 의거한 지하굴착 지보설계에 관한 연구)

  • 김혁진;조태진;김남연
    • Tunnel and Underground Space
    • /
    • v.7 no.1
    • /
    • pp.1-12
    • /
    • 1997
  • Engineering rock mass classification is extensively used to determine the reasonable support system throughout the tunneling process in the field. Selection of support system based on the results of engineering rock mass classification is simple and straight-forward. However, this method cannot consider the effect of in-situ stresses, mechanical properties of support material, and support installation time on the behavior or rock-support system To handle the various conditions encountered in the underground excavation sites rock-support system. To handle the various conditions encountered in th eunderground excavation sites rock-support interaction program has been developed. This program can analyze the interaction between rock mass and support materials and also can simulate the tunnel excavation-support insstallation process by controlling the support installation time and the stiffness of support system. Practical applicability of this program was verfied by comparing the results of support design to those from rock mass classification for virtual underground excavation at the drilling site KD-06 in Geoje island.

  • PDF