Korean Journal of Computational Design and Engineering
/
v.18
no.2
/
pp.93-103
/
2013
In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.
International Journal of Precision Engineering and Manufacturing
/
v.2
no.3
/
pp.69-78
/
2001
This paper presents a process and operation planning system and an NC code post-processor for effective machining of press dies for production of cars. Based on the machining feature, major parts of press dies are categorized into 15 groups and a standard process plan is defined for each group. The standard process plan consists of a series of processes where a process is defined as a group of operations that can be done with one setup. Details such as cutting tools, cutting conditions, and tool paths are decided at the operation planning stage. At the final stage of process and operation planning, the NC code post-processor adjusts feedrates along the tool path to reduce machining time while maintaining the quality. The adjustment rule is selected based on the machining load estimated by virtual machining.
Journal of the Korean Society for Precision Engineering
/
v.17
no.5
/
pp.108-115
/
2000
This paper presents a variant type process planning system for machining of dies for auto-body production. Through the analysis of dies and their manufacturing processes, the authors categorized the press dies into 15 groups according to the similarity of machining features. After critically reviewing current manufacturing procedures, a standard process plan was defined for each group. The authors present MP3D the process planning system built on the standard process plan database, and show how they apply it at the die manufacturing plant of an automobile company. MP3D is expected to reduce major losses in machining such as reworking caused by mistakenly uncut features and eventually to help to accumulate the knowledge of operators. The operation sheet MP3D produces is also used in monitoring the progress of manufacturing of dies. This paper explains the whole development cycle of a process planning system from process analysis to application so that it can help readers to develop and apply a process planning system to their machine shops.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.10
/
pp.589-601
/
2020
The Construction Standard Unit Price (CSUP) sets the standard for calculating the estimated construction cost. The CSUP is used as basic data for preparing a standard price for public construction. Currently, the CSUP is calculated in consideration of the market and construction field conditions. However, a long-term management plan was established to prepare revised standards. As part of the plan, a field survey was conducted on changes in construction conditions and market prices. However, the plan continued for more than 5 years. Thus, the plan has a problem of difficulty continuously managing primary activities that have high importance and high price volatility. Therefore, to efficiently manage the CSUP, this study identifies the primary activities of the CSUP and presents a management plan. Through importance analysis and unit price volatility analysis, 242 primary activities in 35 activity groups were identified. Also, a management plan is presented based on the importance levels of activities. The primary activities and management plan could enable the timely revision of important activities. The results of this study provide a base for reflecting the appropriateness of construction cost criteria on time.
Kim H. S.;Son J. K.;Park K. R.;Kang K. D.;Kim K. D.;Ha J. H.;Jeong C. W.
Proceedings of the Korean Radioactive Waste Society Conference
/
2005.06a
/
pp.40-48
/
2005
The licensees are to submit the decommissioning plan to regulatory body to decommission nuclear facilities. The standard review plan(SRP) of decommissioning is used to confirm and evaluate the decommissioning plan by the related regulations and standards. The licensees who want to decommission the nuclear facilities are required to submit the decommissioning plan according to Acts 31 of Atomic Energy Law. In this study, the items of reports and documents submitting to regulatory body were reviewed deliberately, and finally the major sub-items of decommissioning plan were established.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.8
/
pp.271-278
/
2019
This study compares the space depth and layout of a modern apartment floor plan (MAFP) and the standard floor plan of traditional Korean houses (STKHs), which has preserved the traditional beauty of Korea. Space Syntax was applied to compare the MAFP and STKH. The space within MAFP was more divided into many spaces than the STKH. In both types of floor plans, the living room space had the highest degree of integration and was used for central functions in the each floor plan. The STKH and the space in the MAFP have more segregated space than integrated space. In the STKH, the master bedroom and other rooms were found to be segregated space. However, the master bedroom of the MAFP was highly integrated space. The function of the thet maru has been greatly reduced in the STKH, and the numaru was classified as a highly segregated space. The evacuation space was the most segregated space in the MAFP. The STKH has been adapted and changed according to the trends of the times, and the MAFP reflects our traditional living habits.
Currently, there is no facility standard for a city public health center. The facility standard of rural public health center is referred to architectural plan of city public health center. This study is about architectural plan of the city public health center and have been in 7 public health centers in Daegu investigated. Conclusions can be summarized as follows: 1) The Mother and child hygienic section, area ratio which is presented by the facility standard of rural public health center must be increased in case of city public health center since function-reinforcement of the mother and child hygienic section is required. 2) Business section, the area ratio which is presented by the facility standard of rural public health center must be diminished for city public health center because it has been excessively allocated.
Kim, Dong-Hee;Kim, Woon-Soo;Jeong, Han-Gyo;Noh, Joung-Won
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.819-823
/
2008
Currently, the quality management, safety management and environment management of domestic construction work does not form a infrastructure for integrated control which have been developed according to the unique characteristics based on respective the law. In other words, the quality manager and safety manager of human resources is set to a legal arrangement personnel, but environment manager of human resources is not. In addition, quality management standard is to perform the work to PDCA(Plan-Do-Check-Action) system which is reflected in all of the requirements of KS A ISO 9001 standard, but safety management plan and hazard harmfulness prevention plan are not properly reflected P(Plan), C(Check) and A(Action) system and focusing on only 4 section Do(D) in KOSHA 18001 standard requirement. Moreover environmental management plan is not even established requirement. Through examining the operation practices of an advanced nation prior to building the integrated control standard for construction work qualify safety.environment, the possibility of applying domestic is reviewed, and then this study is going to research the operation practices of Singapore.
Park, Heekon;Moon, Young-gun;Jun, Chi-Hyuck;Balamurali, S.;Lee, Jaewook
Journal of Korean Institute of Industrial Engineers
/
v.30
no.3
/
pp.205-212
/
2004
This paper proposes the variables repetitive group sampling plan where the quality characteristic following normal distribution has upper or lower specification limit. The problem is formulated as a non-linear programming problem where the objective function to minimize is the average sample number and the constraints are related to lot acceptance probabilities at acceptable quality level (AQL) and limiting quality level (LQL) under the operating characteristic curve. Sampling plan tables are constructed for the selection of parameters indexed by AQL and LQL in the cases of known standard deviation and unknown standard deviation. It is shown that the proposed sampling plan significantly reduces the average sample number as compared with the single or the double sampling plan.
Even after many constructions of test-beds to verify R&D results, there is no standard to set up a consistent and systematic test-bed master plan. Therefore, this research derives standards of a u-city test-bed master plan. To verify these standards, the research constructs the potential U-City master plan targeting Cheongna district in Incheon. Standards of a test-bed master plan which is suggested by this research will bring strengths to construct a test-bed such as clear construction procedures from presenting directions of planning, saving cost, effective management of equipments, and so on.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.