• Title/Summary/Keyword: Standard estimating

Search Result 610, Processing Time 0.021 seconds

A study on the Assessment of Standard Wages for Constructing Luminaries for Landscope Lighting (경관조명기구의 설치에 대한 기준노임 산정에 관한 연구)

  • Yoo, Dong-Gil;Lee, Bok-Hee;Lee, Sok-Yeon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.169-172
    • /
    • 2008
  • Recently, landscape lighting is more and more installing in many places such as park, cultural heritages, large-scale structures, bridges, apartment, and so on. However, there is no the government-set official estimation for standard wages constructing luminaries for landscape lighting. The cost of construction is estimated based on the standard wages of related-similar installations such as internal lighting fixtures or the designer's subjective decision. Sometimes, it is overestimated or underestimated. In this paper, the fundamental process for estimating the standard wages constructing luminaries for landscape lighting is studied. The estimation method of standard wages constructing lighting fixtures was examined on the basis of the type and capacities of luminaries, installation places, type and shapes of installation auxiliary materials, worker's skill, and etc. As a result, some results obtained in this work were significantly, different with the standard wages for internal electric wiring published by Korea Electric Association. In the future, to improve the accuracy of the estimation of the standard wages for constructing luminaries for landscope lighting, detailed factors related to the installation condition and dimensions and types of luminaries should be considered.

  • PDF

Setup of standard PD calibrator and its uncertainties

  • Kim, Kwang-Hwa;Yi, Sang-Hwa;Lee, Heun-Jin;Kang, Dong-Sik
    • Journal of Electrical Engineering and Technology
    • /
    • v.6 no.5
    • /
    • pp.677-683
    • /
    • 2011
  • The present paper describes the setup of standard partial discharge calibrator for measuring partial discharge and estimating uncertainties. The standard PD calibrator was designed and set up, consisting of a digital pulse generator, capacitor modules, and a digital oscilloscope controlled by software developed in the laboratory. Using this software, averages of charges and rising times and their standard deviations in the measured pulses can also be calculated. The standard PD calibrator generates five types of pulses: single, double, random, oscillating, and long-rising. The coefficient sensitivities to estimate the uncertainties of pulses were extracted in the model circuit of the standard PD calibrator. The uncertainties of charges and rising times in pulses of the standard PD calibrator were estimated with single pulses. These values were 0.3%-1.4% in charges and 1.9%-7.0% in rising time; however, these values are lower than the limit values in IEC 60270.

A Study on the Change Factors by Activities for Estimating Historical Cost on Apartment Housing Projects (공동주택 실적공사비 산정시 공종별 변동요인에 관한 연구)

  • You, Yong-Hwan;Lee, Kyoo-Hyun;Kim, Chong-Woen;Choi, In-Seung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.4
    • /
    • pp.117-126
    • /
    • 2004
  • Construction industry is faced with the problems such as the quickly changeable circumstance and increasing construction companies due to regulation mollification of company registration. In order to overcome these problems, new estimation system based on historical estimation cost is ready to introduce by government step by step. But the time of transition for estimation system causes another problems such as chaos addition to simultaneity of a standard of estimation system and new estimation system, lack of related regulation, accumulation of historical extensive cost data, and adjustment methodology when historical estimation data is applied to next projects. The purpose of this study is to suggest the change factors by activities for estimating historical cost for apartment housing projects. New estimation system is based on historical construction data. For application of this system, the standard adjustment methodology system is necessary. and extensive cost data should be accumulated under an unified construction work classification system. Therefore in this study, according to the construction work classification system, every apartment housing project was classified to 16 work classifications, and 7 major composed items which occupy more than 85% of construction costs are analyzed by detailed activities and by average ratio and maximum ratio each of them. In the result of the study, furniture work, foundation work and masonry work are the works which have big gap of costs between average ration and maximum ratio. In addition to suggestion of change factor by work species, 5 qualified construction specialists are interviewed and change factors in 7 major works are analyzed.

A Study on the Development of Work-Crew based Daily-Productivity for Representative B.O.Q Item in Road Project (도로공사 대표공종의 생산성 정보 개발에 대한 연구)

  • Seo, Ji-Hyeong;Park, Hyung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.42-53
    • /
    • 2011
  • This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.

Approximate Estimating of Plant Construction Duration Using a Standard Schedule Model (초기 사업단계에서 표준공정모델을 이용한 가스 플랜트 공사의 개략적 공사기간 산정)

  • Moon, Sung-Woo;Park, Sang-Chun;Kwon, Ki-Nam
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.26-33
    • /
    • 2009
  • The required level of detail in scheduling depends on the stages in the construction life-cycle. The objective of this study is to provide a Standardized Schedule Model (SSM) with an aim to facilitate the estimating of construction duration in the planning stage. The SSM modularizes work items; establishes relations between preceding and succeeding activities; and calculates approximate construction duration. The estimated duration of the SSM was compared with the detailed duration from the commercial scheduling tool using actual work activities. The difference showed to be ranged between -3.1% and +15%, which demonstrates that the SSM can be feasibly applied to the approximate estimation of construction duration.

Development of a Computer System and Suggestion of Man-Hours for Demolition Cost Estimation (해체공사비 산정을 위한 품산정 기준과 전산시스템의 개발)

  • Kim, Hyo Jin;Kang, Leen Seok;Lee, Dong Wook;Kim, Chang Hak
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.1007-1015
    • /
    • 2014
  • The importance of construction waste reusing and recycling is becoming increasingly large because the demolition industry is in current trend to pursue for sustainable growth. As the considering situation of the domestic housing construction and existing house, a scale of demolition industry is expected to be increased continuously. But the related cost regulations that are used in tendering in the demolition industry are insufficient, also the computer system for estimating the demolition costs have not been developed yet. Therefore, in this study suggests man-hours of 21EA items which are utilized to estimate demolition cost and work rate of $1.0m^3$ breaker which is used mostly in domestic demolition industry after analyzing a case study for deconstruction works. The computer system is developed for the estimating demolition cost easily, which are including five modules such as a project information, a unit cost management, a standard unit cost table, a bill of quantity, and a reporting system. This computer system is possible to apply for estimating cost of both mechanical demolition and blasting demolition. The biggest advantage of this system is to estimate cost to utilize standard WBS which is linked with standard unit table and each DB. This can help unskilled users use easily for it.

A Study on the Evaluation of Value Indicator and Importance of Prototype Landscape in Rural Areas (농촌 원형경관의 문화재적 가치 속성 및 중요도 연구)

  • Kang, Young-Eun;Choi, Dong-Wook;Hong, Sung-Hee;Min, Su-Hui;Kim, Sang-Bum;Im, Seung-Bin
    • Journal of Korean Society of Rural Planning
    • /
    • v.16 no.4
    • /
    • pp.117-129
    • /
    • 2010
  • This study is to make value estimating system to valuate prototype landscape of rural and to derive itemized importance to select priority preservable object The results of the study are summarized as follows, It is examined value estimating standard by analyzing prototype landscape related previous study, law and order. Also, It is derived conclusive prototype landscape value estimating system by doing attribute assessment of preserving objects while surveying the site and interviewing professionals, Value estimating system is classified into five items of physical value which are integration, harmony, diversity, symbolism and aesthetics, The historical-cultural value are divided into four categories which are religious value, originality, historicity and scarcity, The communal values are divided into three categories which are sociality, continuing and regional locality and also divided into three categories which are rarity, primitiveness and diversity as the ecological value, Relative priority of prototype landscape value estimating system result is derived as historical-cultural value as the superior position and physical value, communal value and ecological value as the priority order. In the subordinate, historical categories are derived to be the most valuable and originality, symbolism, integration, regional locality, continuing, harmony, aesthetics, religious value, primitiveness, diversity of physical values and diversity of ecological value in order of the priority assessment The results of the study have the meaning of practical use in prior selection and preservation plan of preserving prototype landscape as practical alternative plan for systematical preservation of damaging prototype landscape.

Comparison of results between modified-Angoff and bookmark methods for estimating cut score of the Korean medical licensing examination

  • Yim, Mikyoung
    • Korean journal of medical education
    • /
    • v.30 no.4
    • /
    • pp.347-357
    • /
    • 2018
  • Purpose: The purpose of this study was to apply alternative standard setting methods for the Korean Medical Licensing Examination (KMLE), a criterion-referenced written examination, and to compare them to the conventional cut score used on the KMLE. Methods: The process and results of criterion-referenced standard settings (i.e., the modified-Angoff and bookmark methods) were evaluated. The ratio of passing and failing examinees determined using these alternative standard setting methods was compared to the results of the conventional criteria. Additionally, the external, internal and procedural evaluation of these methods were reviewed. Results: The modified-Angoff method yielded the highest cut score, followed sequentially by the conventional method and the bookmark method. The classification agreement between the modified-Angoff and bookmark methods was 0.720 measured by Cohen's ${\kappa}$ coefficient. The intra-panelist classification consistency of modified-Angoff method was higher than bookmark method. However, the inter-panelist classification consistency was vice versa. The standard setting panelists' survey results showed that the procedures of both methods were satisfactory, but panelists had more confidence in the results of the modified-Angoff method. Conclusion: The modified-Angoff method showed results that were more similar to those of the conventional method. Both new methods showed very high concordance with the conventional method, as well as with each other. The modified-Angoff method was considered feasible for adoption on the KMLE. The standard setting panelists responded positively to the modified-Angoff method in terms of its practical applicability, despite certain advantages of the bookmark method.

Investigation on the Pollutant Delivery Characteristics using Physically Based Watershed Model (물리적 기반의 유역모형을 이용한 오염물질 유달 특성 규명)

  • Kim, Chul-Gyum;Kim, Nam-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.2
    • /
    • pp.256-267
    • /
    • 2009
  • A method of estimating pollutant delivery ratios considering watershed physical and meteorological characteristics and flow conditions using SWAT-K watershed model was described, and pollutant delivery characteristics during dry and rainy seasons, for monthly and seasonally, and with flow regimes were investigated for the Chungju dam watershed. Delivery ratios for sediment, T-N, and T-P showed higher values over 100% during dry and winter seasons with low pollutant loads and flows, and showed relatively uniform ones under 100% during rainy and summer seasons with concentrated loads and flows. It was found that mainly wet flows during summer seasons played very important roles in investigating the delivery characteristics of total or nonpoint pollutant loads, because more than 90% of total loads were influenced by nonpoint source, and discharged with the flows. From the results, we could find out the delivery characteristics with various watershed and flow conditions which are difficult to consider by actual measurement, and could get a foothold of estimating more reasonable and scientific allocated loads for water quality standard using the reliable method of estimating delivery ratios with a watershed model.

Comparison of methods for the proportion of true null hypotheses in microarray studies

  • Kang, Joonsung
    • Communications for Statistical Applications and Methods
    • /
    • v.27 no.1
    • /
    • pp.141-148
    • /
    • 2020
  • We consider estimating the proportion of true null hypotheses in multiple testing problems. A traditional multiple testing rate, family-wise error rate is too conservative and old to control type I error in multiple testing setups; however, false discovery rate (FDR) has received significant attention in many research areas such as GWAS data, FMRI data, and signal processing. Identify differentially expressed genes in microarray studies involves estimating the proportion of true null hypotheses in FDR procedures. However, we need to account for unknown dependence structures among genes in microarray data in order to estimate the proportion of true null hypothesis since the genuine dependence structure of microarray data is unknown. We compare various procedures in simulation data and real microarray data. We consider a hidden Markov model for simulated data with dependency. Cai procedure (2007) and a sliding linear model procedure (2011) have a relatively smaller bias and standard errors, being more proper for estimating the proportion of true null hypotheses in simulated data under various setups. Real data analysis shows that 5 estimation procedures among 9 procedures have almost similar values of the estimated proportion of true null hypotheses in microarray data.