Abstract
This study is to present a method of compiling consistently accurate construction cost estimates in minimum of time. There are two kind of applications for estimating system based on quantity-per-unit and the daily work-crew. The former system is still applied 45% as a estimating method to construction job site by the second half of 2010. However, it is necessary for quantity-per-unit to complement the defect of standard integrating specification and improve the integrating method to the various construction conditions. The later system is intended to represent a standard or basic core which can be adopted in many type of construction estimating used across the wide variety of construction in advanced countries. In this study daily work-crew based on productivity is applied to the representative B.O.Q Item in road project. These results are compared to productivity of Japan and U.S.A estimated under the similar circumstances.
2004년 예정가격 산정방법으로 실적공사비 적산제도가 본격적으로 시행되면서 상대적으로 표준품셈 적산제도의 적용이 하락하였다. 그러나 2010년 하반기 예정가격 산정시 표준품셈 적산제도의 적용비중은 45%이며, 여전히 높은 적용비중을 유지하고 있다. 현행 표준품셈은 예정가격의 산정에 과도한 시간이 소요되고, 시공계획과 자원분배에 적용하기 어려운 단점이 있다. 이와 같은 단점을 개선하기 위하여 본 연구에서는 국내외 품셈의 형식을 고찰하여 이를 국내 도로분야 대표공종에 적용하여 기존 품셈을 일단위 작업조 기반 생산성 정보로 산출하여 유사한 조건하에서 일본 미국의 생산성 정보 및 현장자문을 통한 정보와 비교하였다. 본 연구를 통해 적용된 작업조기반 생산성 정보 산출 방법과 산출 정보의 효용성을 확인하고자한다. 이러한 과정을 통하여 표준품셈을 통한 작업조기반 생산성 정보 산정 방법'과 일단위 작업조 기반 생산성 정보를 제시하고자 한다.