• Title/Summary/Keyword: Standard Work Process

Search Result 523, Processing Time 0.029 seconds

A Study on Standard Process of Risk Management for Defense Systems Test Works (무기체계 시험업무에 대한 리스크 관리 표준 프로세스 연구)

  • Taeheum Na;Dongeun Heo;Youngmin Kim;Jooyeoun Lee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.27 no.3
    • /
    • pp.364-374
    • /
    • 2024
  • Today, risks created by uncertainty must be managed for successful project execution. From this perspective, applying a risk management process is very important for successful defense systems test works. This paper describes 'the implentation of risk management process for test work' carried out by DTERI's process improvement activities. In this study, the concept of risk management process, and details of the risk management process are examined through PMBOK and ISO/IEC/IEEE 15288, CMMI. After that, we defined 'Standard Process for Risk Management' of defence systems test works. And, we describe 'Risk Management Function' of DTERI's Project Management System(PMS) and the risk management process of DTERI. Finally, the effectiveness of the risk management standard process is verified through quantitative analysis.

A Study on the Development of a Work Operation Process Chart for Smart Distribution Board Fabrication (스마트 분전반 제작을 위한 작업 공정도 개발에 관한 연구)

  • Lee, Byung-Seol;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.3
    • /
    • pp.15-20
    • /
    • 2017
  • This study presented the strength of the materials and parts for smart distribution board fabrication, and developed a work operation process chart for smart distribution board fabrication. This work operation process chart for smart distribution board fabrication complied with SPS-KEMC regulations, and the applicable range and object are less than 1,000 V and 1,000 Hz for the AC distribution board and less than 1,500 V for the DC distribution board. The power supply is 3 phase 4 wires ($3{\Phi}$ 4W), divided into a single phase circuit and a 3 phase circuit. In addition, the circuit was configured so that the leakage current flowing through the distribution line of the load could be monitored in real time by using the sensor module installed at the rear end of the circuit breaker. Therefore, the administrator can easily find the risk factor of the load since engineer can check the leakage current of each distribution line. In addition, if a leakage current greater than standard value flows, it is possible to generate an alarm against a short circuit and cut off the leakage current. The work operation process chart for the smart distribution board fabrication consists of the following steps: raw and subsidiary materials, sheet metal work, tube making, welding, painting, busbar fabrication, assembly and wiring, product inspection, shipment, etc. Moreover, symbols, ${\Delta}$, ${\nabla}$, ${\bigcirc}$, ${\Rightarrow}$, etc. were used according to the type of work and work progress so that workers can easily understand the progress of the work.

Standardization of the Work Classification System in Spatial Data Construction - Laying Stress on the Basic Surveying - (공간데이터 구축의 공종분류체계 표준화 - 기본측량을 중심으로 -)

  • Choi, Byoung-Gil;Cho, Kwang-Hee;Kim, Sung-Soo
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.2 s.36
    • /
    • pp.69-75
    • /
    • 2006
  • This study aims to standardize the work classification system in spatial data. It is the base frame to classify the general information systematically in spatial data construction process. Work process of the surveying firm and rules for basic surveying which is being accomplished in the NGII(National Geographic Information Institute) are investigated and analysed. Therefore, types, individual process, and results of surveying work is standardized. If the work classification system from this study is adopted as the national standard and is also advanced by construction methodology, the spatial data will be managed futuristically and systematically.

  • PDF

Applications of the Time Study to Establish Standard Times for a Small-Sized Manufacturing Company (중소제조 업체의 표준시간 산정을 위한 시간연구의 적용)

  • Kee, Do-Hyung;Ko, Hyun-Jeung;Lee, Dae-Joo
    • IE interfaces
    • /
    • v.10 no.2
    • /
    • pp.115-125
    • /
    • 1997
  • The main purpose of this study is to establish standard times of several manufacturing processes in a small-sized manufacturing company located in Taegu. This company produces two types of products; single parts and part assemblies of bicycles. Due to lack of the standards on daily or hourly production volumes, the production manager could not assign workers daily production volume at the start of production, and could not exercise tight supervision. The standard times established in this study were much less than the average production times found in the daily production report. Based on these standard times, we calculated the number of machines that a worker can operate properly without bringing overload on him, and established a line balanced production system in each manufacturing process to minimize work-in-process inventory.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

Status quo Analysis on the Wearing Conditions of Working Clothes according to the Working Environment and Working Process -With reference to the Shipbuilding Industry Workers- (작업환경 및 공정에 따른 작업복 착의실태 분석 -조선업 근로자를 중심으로-)

  • Bae, Hyun-Sook;Park, Hye-Won;Park, Gin-Ah;Kim, Jie-Kwan
    • Fashion & Textile Research Journal
    • /
    • v.12 no.2
    • /
    • pp.203-213
    • /
    • 2010
  • This study examined the wearing conditions of working clothes of shipbuilding industry workers according to the working environmental factors and working process features. It was also investigated the relationship between the wearing sense of working clothes and the overall comfort according to work processes. In the working process of shipbuilding industry, the process of fitting, welding, grinding and painting were chosen by considering work environmental factors, disaster types, hazardous materials, work process features, working clothes and safety equipments of each work categorized. The workers of fitting process usually wore the standard working clothes, while more than 60% of the workers of welding, grinding and painting wore the specialized protective clothes. The hazardous work environmental factors such as noise, heavy dust, high temperature and noxious fumes affected to the workers of fitting, welding and grinding. However, the workers of painting were greatly damaged by organic solvent. The dissatisfaction with the wearing performance of working clothes was highly shown in the sweat absorbency, moisture permeability and body protection. In respect of the correlation between the overall comfort and the wearing sense of working clothes, the satisfaction was decreased in orders of movement comfort> sensual comfort> physiological comfort.

A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost (표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

Analysis of the Risk Factors and Design of the Safety Management Application for the Panel Line in a Shipyard (조선소 판넬라인의 위험요인 분석 및 안전관리 Application 개발)

  • Oh, Hyunsoo;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.6
    • /
    • pp.160-165
    • /
    • 2012
  • The process of panel line in the shipyard produce the panel of outside planking which is located the side and bottom of a ship. The stiffeners or plates are welded onto the plates in this process. In this study, the panel line was performed to work process analysis and was analyzed into the IDEF0(Integration Definition) model that is functional modeling methodology. Also the panel line was analyzed to find out the risk factor and expected accident/safety guide from each process. And then this outputs were applied to the IDEF0 model. The mobile application which is designed by ooCBD(Object-oriented Component Based Development) method is able to use the output data of the process analysis in the panel line. This mobile application could be used by employees and safety managers without regard for working location and time.

A Study on the Risk Index Model of Work Type in Architectural Construction Work (건축공사 공종별 위험지수 산정모델에 관한 연구)

  • Chang, Seong-Rok;Go, Seong-Seok;Lee, Jong-Bin
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.6
    • /
    • pp.63-68
    • /
    • 2007
  • The purpose of this study is to verify the relation between the risk index using AHP(Analytic Hierarchy Process) and the risk index using Computing Model. For doing the objective, this research classified 22 work types in architectural construction work from the analysis Korean architectural standard specification and Korea occupational safety & health agency code. Based on the classified 22 work types in architectural construction work, the risk index of each work type was calculated by AHP and Computing Model. For verifying the correlation of risk index between AHP and Computing Model methods, SAS version 8.0 System, which is one of the statistics programs, was used.