철근콘크리트 공사비산정기준 개정요인에 관한 연구 (A Study on the Factors for Revision of the Reinforced Concrete Construction Cost Estimation Standard)

  • 송태석;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.198-199
    • /
    • 2022
  • Reinforced concrete is the most widely used construction method for constructing structures. There is a lot of process for constructing Reinforced concrete structures such as installing rebars, molds and support, mixing and placing concrete, and curing. So the reinforced concrete work accounts for a large part of the total construction cost for constructing structure. For this reason a reasonable standard for estimating the cost of reinforced concrete construction has to be established and it will be possible to secure appropriate costs for construction work. In this study, we analyze the revision factors of the standard for estimating the cost of reinforced concrete construction and present them to secure reasonable construction costs.

  • PDF

표준원가계산에 있어서 제조간접비표준의 설정과 차이분석기법 (A Study on the Methods of the Overhead Standard Setting and the Overhead Variance Analysis in Standard Cost Accounting)

  • 김선정
    • 산업경영시스템학회지
    • /
    • 제6권8호
    • /
    • pp.81-91
    • /
    • 1983
  • In this study the methods of the overhead standard setting and the overhead variance analysis, which raise problems especially in business practice in case that small businesses introduce the standard cost accounting system, were examined by hypothetical examples. As the result of this study small businesses are advised to take the following in setting the overhead cost. (1) To divide the mixed cost into variable overhead and fixed overhead, it is desirable to take Beast square method. (2) In setting the overhead standard, it is desirable to fake the flexible budget system and to make a budget by the inspection method, after dividing the overhead into variable overhead and fixed overhead. (3) After dividing the overhead variance into variable overhead variance and fixed overhead variance, it is desirable to analyze them as follows. (A) Variable overhead variance is analyzed into spending variance and efficiency variance. (B) Fixed overhead valiance is analyzed into budget variance and denominator variance.

  • PDF

공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발 (Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects)

  • 강동완;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Web-based Daily Report for Data Repository of Standard Cost Data for Modernized Korean Housing (Hanok)

  • Kim, SuJi;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.595-596
    • /
    • 2015
  • Growing demand for traditional Korean housing, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. However, the standard cost data for Hanok has limitations, as it was developed based on single mock-up project actually constructed and verified by another mock-up Hanok. In order to meet these research objectives, daily report composition which is easy-to-use for on-site workers and managers and also easy-to-accumulate standard cost data was developed first. Secondly, access to the system was made easy through a web server. Finally, an automated calculation formula was inserted to allow the last inputted data to be automatically included for adjustment of standard costs. This system was designed from an industry perspective so that any unspecified and nonprofessional users can easily use. For the users, it has an advantage that on-site workers are provided with a daily report system through web server and also they are able to complete such reports through simple input and output without any additional forms.

  • PDF

OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구 (A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly)

  • 이정욱;이한수;이치호;노현석
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.89-100
    • /
    • 2022
  • 최근, OSC(Off-Site Construction)기반 PC구조의 활성화를 위한 제도적 기반 마련의 일환으로 적정공사비 산정에 필요한 품셈 개발을 요구받고 있다. PC공법의 공사비는 공장제작-운반-현장설치의 단계로 구성된다. 최근 운반과 현장 설치는 부재(subsidiary materials)별 현장실태 조사 결과를 반영한 표준품셈 체계(standard product calculation system)를 제시하는 등 관련 연구가 진행되고 있다(Lee et al., 2021). 반면, 공장 제작 공사비 산정과 관련된 연구는 전무한 실정이다. 본 연구에서는 PC 공법의 공장제작 공사비 산정기준 마련을 위해 공장 제작 환경에 활용할 수 있는 품셈 체계를 제시하였다. 이를 위해 시공절차에 따른 작업 공종을 도출하였으며, 공종별로 연계된 표준품셈을 분석하여 작업 특성에 적합한 표준 투입인력을 산출하였다. 품셈 체계는 PC부재의 현장설치와 동일하게 기둥, 보, 벽체, 슬래브 부재로 구성하였으며, 공종별 기능공을 기준으로 부재별 기본공수를 제시함으로서 직접노무비의 산출이 가능하도록 하였다. 또한, 개별 부재의 규격(m3)에 따라 생산성이 변화되는 특성을 고려하여 부재 크기를 품의 할증 요소로 제시하였다. 본 연구결과는 현재 견적에 의해 재료비료 계상되는 PC공법의 공장제작 비용을 객관적으로 검증할 수 토대 마련에 기여할 수 것이다.

공공하수처리시설의 총인기준 강화에 따른 비용효과분석 (Analysis of the cost effectiveness according to T-P standard enforcement of public sewage treatment facilities)

  • 정원구;임재명
    • 산업기술연구
    • /
    • 제31권A호
    • /
    • pp.135-145
    • /
    • 2011
  • This study was conducted to analyze the cost effectiveness in line with total phosphorus standard enforcement of public sewage treatment facilities. The additional cost for the total phosphorus removal process was calculated to analyze the cost effectiveness of the advanced water purification process. The analysis results showed that the T-P removal by coagulation sedimentation was more efficient than the advanced water purification facilities in terms of facilities investment cost, and if the coagulation filteration was used for T-P removal, the activated carbon process among the advanced water purification techniques was more efficient in terms of facilities investment cost. In this study, the effects of the T-P removal process that will be additionally introduced according to the tightening of the effluent T-P standard were analyzed within a limit. The actual benefits of improved T-P concentration in the water source will provide diverse values, including the leisure water, environment improvement water, eco-system in the water source and industrial water, in addition to the advanced water purification.

  • PDF

Cost-Effectiveness of Intensive Vs. Standard Follow-Up Models for Patients with Breast Cancer in Shiraz, Iran

  • Hatam, Nahid;Ahmadloo, Niloofar;Vazirzadeh, Mina;Jafari, Abdossaleh;Askarian, Mehrdad
    • Asian Pacific Journal of Cancer Prevention
    • /
    • 제17권12호
    • /
    • pp.5309-5314
    • /
    • 2016
  • Background: Breast cancer is the most common type of cancer amongst women throughout the world. Currently, there are various follow-up strategies implemented in Iran, which are usually dependent on clinic policies and agreement among the resident oncologists. Purpose: A cost-effectiveness analysis was performed to assess the cost-effectiveness of intensive follow-up versus standard models for early breast cancer patients in Iran. Materials and methods: This cross sectional study was performed with 382 patients each in the intensive and standard groups. Costs were identified and measured from a payer perspective, including direct medical outlay. To assess the effectiveness of the two follow-up models we used a decision tree along with indicators of detection of recurrence and metastasis, calculating expected costs and effectiveness for both cases; in addition, incremental cost-effectiveness ratios were determined. Results: The results of decision tree showed expected case detection rates of 0.137 and 0.018 and expected costs of US$24,494.62 and US$6,859.27, respectively, for the intensive and standard follow-up models. Tornado diagrams revealed the highest sensitivity to cost increases using the intensive follow-up model with an ICER=US$148,196.2. Conclusion: Overall, the results showed that the intensive follow-up method is not cost-effective when compared to the standard model.

원가산정을 위한 표준분류체계 활용한 지식체계 개발 (Knowledge Structure for Cost Estimates Based on Standardized Cost Database)

  • 임혜경;강남희;최재현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

지하철골공사 공사비산정기준 마련을 위한 현장조사 연구 (A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey)

  • 송태석;한상준;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

농어촌정비사업 공종별 실적공사비 적산시스템개발 (Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects)

  • 김현영;이정재;김영기;오상원;전효묵
    • 한국농공학회지
    • /
    • 제40권3호
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF