• 제목/요약/키워드: Standard Construction Period

검색결과 202건 처리시간 0.024초

Development of reference materials for mortar: Determination of the components and relation with mixing ratio

  • Lim, Dong Kyu;Choi, Myoung Sung
    • Advances in concrete construction
    • /
    • 제10권5호
    • /
    • pp.381-391
    • /
    • 2020
  • This study aimed to develop reference materials (RMs) for mortar that can simulate the initial flow characteristics with constant quality over a long period. Through the previous research on the development of RMs for cement paste, the combination of limestone, glycerol, and water was used as the basic matrix for developing RMs for mortar in this study. In addition, glass beads of three particle sizes (0.5, 1.0, and 2.0 mm) and ISO standard sand were selected as tentative candidates to derive fine aggregate substitutes. The mixture of glass beads could simulate the initial flow characteristics of mortar, but under the same mixing ratio, replicates showed an unstable tendency to indicate inconsistent values due to the generation of electrostatic properties between materials and equipment. On the other hand, the mixture using ISO standard Sand not only simulates the constant flow characteristics for a long period of time, but also shows stable results with little error in replicates. Therefore, limestone, glycerol, ISO standard sand, and water were finally determined as components that met the required properties of RMs for mortar. The effect of each component on the flow characteristics of RMs was analyzed. It was found that glycerol increased the cohesion between the particles of standard sand, resulting in a constant increase both in the plastic viscosity and yield stress. Both limestone and standard sand had a dominant effect on the yield stress. The relationships between various mortar mixing ratios and the corresponding mixing ratios of RMs were established. In addition, the results of the verification experiment showed that the rheological properties of the RMs obtained through the relationships correlated with various water/cement ratios and the fine aggregate volume fractions of mortar obtained with same manner. In other words, the RMs for mortar developed in this study can be used as standard samples because they can simulate the initial flow characteristics of mortar of various mixing ratios for a long period without any chemical changes.

조경공사 표준시방서 변화특성과 개선방향 연구 - 식재공사를 중심으로 - (A Study on Improvement and Change Properties of Landscape Construction Standard Specification - Focused on Planting -)

  • 유주은;전진완;이상석
    • 한국조경학회지
    • /
    • 제41권1호
    • /
    • pp.60-70
    • /
    • 2013
  • 본 연구는 조경공사 표준시방서 식재공사의 분류체계, 기술방식, 품질기준의 개정시기별 변화특성을 분석하고, 국외 사례와의 비교를 통하여 개선방향을 제시하고자 하였다. 이에 본 연구의 결과 및 제언은 다음과 같다. 1. 개정을 통해 다양한 세부공종이 신설 수정되었으나 상 하위분류가 맞지 않아 시방내용이 상충되고 있으므로 비슷한 공사끼리의 재분류가 필요하다. 2. 시방서 내용을 용이하게 전달하기 위한 기술방식으로 수정이 이루어졌다. 그러나 구체성이 떨어지는 애매모호한 표현과 용어로 유지되고 있는 굴취시 뿌리분의 깊이, 지주재 강도에 관한 내용은 수정이 필요하다. 또한 표토의 채취시기, 약제 살포시기 등은 계량화될 필요가 있으며, 시방규정의 공정성을 고려하여 감독자의 지시에 따르도록 작성된 기준은 수정되어야 한다. 3. 시대적 패러다임과 사용자의 요구를 반영한 품질기준이 제 개정되었으나 구체적이지 않아 수정이 필요하며, 관련 기준들의 국외 사례를 참고하여 수목재료의 품질수준, 식재적기, 굴취시 뿌리분의 크기, 성능기준 등을 개선해야 한다. 개정을 통해 식재공사의 세부공종별 재료 및 시공방법에 대한 내용은 갖춰졌다. 그러나 구체성이 떨어지고 명확하지 않은 기준들로 시방서의 현장 활용을 저해하고 있다. 이에 표준시방서의 분류체계, 기술방식, 품질기준의 문제점 도출과 개선방향의 제시가 필요하며, 이는 향후 표준시방서 개정시 참고자료가 될 수 있다.

지하구조물 계측센서의 내구연한 기준에 대한 규정 분석 연구 (A study on the regulation of durability standard of underground structures monitoring sensors)

  • 우종태
    • 한국터널지하공간학회 논문집
    • /
    • 제20권1호
    • /
    • pp.73-81
    • /
    • 2018
  • 본 논문은 지하구조물 계측센서의 내구연한 기준에 대한 규정 분석 연구로 국내 건설공사 발주기관의 건설 계측센서에 대한 내구연한 기준을 조사 분석하고, 법인세 시행규칙에서 건축물 등의 기준 내용연수 및 조달청의 건설계측 및 건설기계 관련 내용연수 기준을 분석하였다. 지하 구조물에 설치되기 전 조달청에서 물품 자체로 구매하는 경사계와 변형률계 등의 내구연한 기준은 8년에서 10년을 제시하고 있으나, 건설공사 시 원 지반 및 콘크리트 구조물 내에 설치된 계측센서는 지하수 영향 및 다짐 등 여러 가지 불리한 요인으로 물품 자체의 내용연수보다는 상당 기간 단축될 것으로 판단된다.

공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구 (Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension)

  • 정기창;이재섭;박양호
    • 한국건설관리학회논문집
    • /
    • 제13권6호
    • /
    • pp.33-44
    • /
    • 2012
  • 본 연구는 공공공사 공기연장 시 발생하는 추가간접비의 지급개선방안에 관한 연구이다. 현장사례를 통해 공기연장 추가 간접비 미지급 원인을 분석한 결과 실비의 인정범위에 대한 다툼 및 증빙의 어려움이 있는 것으로 조사되었으며, 전문가 의견조사 실시결과 통계적 기준이 명확하다면 공기연장 추가간접비의 인정범위를 합의하는 '공기연장 사전합의 제도'를 실시할 수 있을 것으로 조사되었다. 따라서 본 연구는 다수의 현장 실비자료를 집계하여 공사프로젝트의 공종별, 공사금액별, 공사기간별 측면에서 산정하였다. 산정한 결과 공종 및 공사기간별 요인은 공사기간연장 추가간접비 발생금액에 직접적 영향을 미치는 것으로 볼 수 없으나 도급계약금액요인에 따라서는 직접적 연관성이 있는 것으로 나타났다. 이에 계약금액별 공사기간연장에 따른 추가비용인 '공기연장 표준추가간접비'를 제시하였으며, 공기연장비용 사전합의 제도를 시행하기 위한 제도적 개선방안을 제시하였다.

중국의 정신의료시설 및 지원체계에 관한 법제도 연구 (A Study on the Regulation for Mental Healthcare Facility and Delivery System in China)

  • 고문매;윤우용;채철균
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제24권1호
    • /
    • pp.7-14
    • /
    • 2018
  • Purpose: This study analyzes mental healthcare delivery services and types of facilities, the status of installation and operation, and planning standard. The purpose of the study is to propose a basic data for the performance of related research and work tasks, along with an understanding of the Chinese mental healthcare facility type and support system. Furthermore, it will show a lack of current function management as the changes of mental health concept and demand for services increases, and it is intended to provide implications for the construction of mental health facilities. Methods: This study was conducted by a research on law and regulation of China's mental healthcare delivery service system and mental healthcare facility. The analyzed data are the national standard GB, the optional national standard GB/T, the building construction standard JGJ, and the report issued by the Health Planning and Development Committee. Results: At present mental healthcare facility construction in China is in the period of rapid development and it exposes the layout of medical facilities, which is not currently reasonable and the service does not reach the designated position and so on. Overall, it requires more detailed guidelines to enhance the quality of mental healthcare service. Implications: It is expected that the research of this paper will provide effective reference for future research on Chinese Mental healthcare system and facilities, and can promote construction of Chinese mental healthcare facility theory in perfect condition.

축열식 열원시스템 적용에 의한 전력부하 평준화의 경제성 검토 (Feasibility Study on Leveling Method of Electric Power Load by Applying Thermal Storage Air Conditioning System)

  • 이철구
    • 한국지열·수열에너지학회논문집
    • /
    • 제15권1호
    • /
    • pp.9-17
    • /
    • 2019
  • Reducing global warming potential has become important, and as one of those methods for reducing it, economic evaluation by applying ice thermal storage air conditioning system was performed. The floor area and height of the subject building was assumed $5,000m^2$ and 20 m. Absorption chillerheater system and air source heat pump system was used for comparing to the subject system, and payback period method was used to perform economic evaluation. Although the running cost of ice thermal storage system is reduced compared to two systems, the ratio is not significant compared to the increase of initial construction expenses, and payback period was calculated to be about 7.7 and 79.3 years. However, the heat storage system should be approached from the viewpoint of long term rather than the economic standard in the present standard.

대기행렬 모형을 활용한 아파트 골조공사 기준층 인적 자원관리 선정사례에 관한 연구 (A Case Study on the Appropriate Construction Personnel of the Typical Floor of Apattment Frame Construction Using the Queueing Model)

  • 이정원;김보희;함남혁;김재준
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.3-14
    • /
    • 2022
  • 현장에서 발생하는 정량적인 공사 인원과 기간의 분석은 새로운 적정 인원의 기준을 제시할 수 있다. 본 연구는 업무효율 지표들 중 가장 중요한 요소인 업무절차의 수행시간을 예측하는 대기행렬 모형을 제시한다. 아파트 골조공사 작업 사이클은 같은 공정이 반복되는 특성을 가진다. 본 연구는 이러한 특성을 바탕으로 지연된 골조공사 기준층 사이클을 대기행렬 모형을 활용하고 그것을 분석하였다. 그리고 인원수와 공사 기간을 조정한 후 모형의 성능을 분석하였다. 본 연구는 대기행렬의 성능 분석을 실시하여 공정의 물량에 따른 인적자원관리 의사결정을 지원하고자 한다.

BIM기반 프로젝트의 WLCM (Whole Life-Cycle Management) 적용모델 개발을 위한 기초연구 (A Preliminary Study of the evaluating and improving WLCM for construction project based on BIM)

  • 이근호;임형철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.13-14
    • /
    • 2011
  • The main purpose of this research is to propose standardization of construction components design with BIM and to develop WLCM Framework and Application System for supply chain management on interaction of stakeholders based on proposed standard component. To accomplish main purpose of this research, we planned three years period, in first year, we will develop model for building lifecycle based on BIM, and this model can give the chance of collaboration with stakeholders of building project. In second year, we will develop WLCM system with model, and to improve performance of application model/system. This study can contribute on reduction of whole lifecycle cost, with preventing omission of factors on cost reduction possibility, develop concurrent engineering framework for construction stakeholders with proposed BIM.

  • PDF

건설공사 성능계약제도 도입방향에 관한 연구 (A Study on the Direction of the Warranty Contract in Constructions)

  • 김현;박성용;서용칠;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.153-157
    • /
    • 2008
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. However, the interior of a country encounter another problem result from defects liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF

건설공사의 성능계약 도입방안에 관한 연구 (A study on the Application Scheme of the Warranty contract in constructions)

  • 김대길;정호근;서용칠;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.89-92
    • /
    • 2007
  • Since 1960s, advanced constructions have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction. However, the interior of a country encounter another problem result from Defects Liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF