A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project - (프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 -)

  • Yoon Jun-Seon;Kwon Gi-Beom;Seo Choon-Taek;Paek Joon-Hong
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF

Modelling the Estimation Process of Greenhouse Gas Emission in the Construction of Buildings

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.266-274
    • /
    • 2012
  • The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. To meet the government's greenhouse gas reduction targets, the construction sector has until 2020 to cut its emissions by 7.1%. Unlike other high-tech industrial sectors, the construction sector has a fairly limited scope for technological improvements, which hampers its capacity to achieve the reduction target. To reduce emissions, it is necessary to establish an energy and emissions strategy at the project planning stage, and energy use and the resulting emissions must be estimated. This research aims to establish an estimation methodology for greenhouse gas emissions at the planning stage of construction projects. To estimate the project-related emissions, this research indentified the relationship among the types of emissions in a cross-sectional matrix form, and then provided a set of calculation methods for total project related emissions.

A Fundamental Study on Management Plan of Occurrence Data in Accordance with Engineering & Construction of Pipeline in Frozen Soil Region (동토지역 파이프라인 설계/시공에 따른 발생 데이터의 관리방안에 관한 기초연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.20-21
    • /
    • 2014
  • Recently, activation of related construction projects due to the large traditional gas resource development of frozen soil region of Russia are expected. It is necessary to provide a plan that can be utilized and collectively managed the occurrence data in the engineering & construction stage for continued contracts of the pipe construction. Therefore, this research is aimed to provide a management plan of occurrence data for efficient management in engineering & construction stage of pipeline business in frozen soil region. The data of the engineering & construction(related pipe construction projects) can be accumulated each version and multiply managed. Furthermore, I will be expected to be the foundation of the systematic management of the classifying based on metadata and the optimizing operations using big data method.

  • PDF

A Study on the Review Methods of Design Errors in Construction Phase of BIM Project (BIM 프로젝트 시공단계의 설계오류 검토 방안에 관한 연구)

  • Lee, Se-Ip;Sim, Un-Jun;Ahn, Young-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.25-27
    • /
    • 2012
  • The domestic construction industry recognize that review of design and construct-ability has the devastating effects. The way to take advantage of BIM for increase the possibility of discovered the design errors in advance are being discussed a lot recently. Since 2012, Public procurement published that the Turn-key project which is the more than 50 billion won in construction have to let the BIM-based design be mandatory. However, people expected the advent of BIM technology can resolve the existing design errors. But the situation is the connection of design stage and construction stage is very insufficient in domestic. Therefore, in this study understanding the types of design errors in construction phase. according the review of design errors before construction. Then can acceleration the application of BIM to improve the workability in a construction site.

  • PDF

Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods - (초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 -)

  • Hyun, Dong-Myung;Jeon, SangHoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

ICT IMPLEMENTATION FOR MATERIALS MANAGEMENT IN CONSTRUCTION PROJECTS

  • N.B. Kasim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.195-200
    • /
    • 2011
  • Construction materials usually constitute a major portion of the total cost in a building construction project. Despite the potential benefit of ICT, convincing construction organisations to embrace its use and implementation has proved a difficult task. This study seeks to identify the implementation of ICT for materials management processes in construction projects. The findings from the interviews reveal that the implementation of ICT in the materials management processes for construction projects in Malaysia is at early stage. Microsoft Excel Spreadsheet and handheld devices are found to be the common ICT tools adopted in the materials management processes. The main barrier is found to be the cost involvement at the initial stage or overall implementation of ICT in the materials management processes. Finally, this paper concludes the finding from interviews towards the ICT implementation of materials management in the construction projects.

  • PDF

The Application and Development Method of Construction Lines for Conceptions of Clothes Design (의상디자인 발상을 위한 구성선의 응용과 전개방법)

  • Kong, Mi-Ran
    • Fashion & Textile Research Journal
    • /
    • v.10 no.6
    • /
    • pp.848-856
    • /
    • 2008
  • In today's world where a preference for prestigious brands prevails, it's essential to have creative design conceptions rather than try simple mimicking or following in order to be recognized for creative and objective design works. In that sense, the development of clothes design using construction lines offers a great approach towards the ideas of reinterpreting and creating new designs since it creates new forms by understanding lines as signs of conception and transforming them. That approach allows a designer to improve his or her imagination, creativity and expression in a freer and richer manner, think of many original ideas through diverse changing processes, and develop the skill to visualize the ideas by incorporating geometric forms of abstract lines into clothes. When approaching the conception of clothes design from the standpoint of construction lines, you need to adopt more specific and systematic design methods instead of vague imagination to introduce simple facts or theories to a new design process. That's one of the ways you can approach clothes design easily and enhance your conception skills. The process of clothes design according to the conception of construction lines is composed of the following stages; the preparation stage involves an understanding of the principles and the entire process of clothes design conception based on construction lines; the idea stage requires a designer to make free alterations of the given basic construction lines by moving and replacing the lines and sides in diverse ways; in the creation and expression stage, the designer uses the newly reconstructed construction lines to create clothes design; and in the evaluation stage, the designer makes a presentation of his or her subjective design works and has his or her works assessed and tested in an objective fashion. In today's modern society that demands new and original globalized design, the results of the study will help to invigorate the development of new fashion design in a more systematic and practical manner by suggesting a feasible and gradual educational program for the development of design based on the technique of construction lines.

Construction Stage Analysis of Hybrid Composite Cable-Stayed Girder Bridge Using Eccentrically Loaded Derrick Crane (편중 가능한 사장교 가설용 데릭 크레인을 이용한 합성형 복합 사장교 시공 단계 해석)

  • Park, Taekwun;Kim, Moon Kyum;Won, Jong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.277-286
    • /
    • 2010
  • Derrick or caterpillar crane is generally used for the long-span/cable-stayed bridge construction by pre-cast segment lifting from over-land or water transportation. The heavy weight of them, however, could make defects on unstable under-construction structure and, furthermore a method of conventional segment transportation is also able to occur additional time and cost. In this study, in order to improve conventional construction method, the newly developed derrick crane is mainly considered. It could be not only eccentrically loadable on constructing girder but having rotatable boom for segment transportation from back-side. A series of construction stage using developed derrick crane is defined and also its numerical analysis is conducted. To reflect load characteristics of developed derrick crane on construction stage analysis, on/out of service load is separately calculated by considering vertical/lateral rotation range of boom and it is loaded on 4 fixed positions of crane. The derrick crane on this study could be time and cost saving solution for cable-stayed bridge construction and also make contributions to construction load reduction in its process.

Analysis of the Effect of Seismic Loads on Residential RC Buildings using the Change in Building Size and Return Period (건물 규모 및 재현주기 변화에 따른 주거용 RC건물에 대한 시공 중 지진하중의 영향 분석)

  • Seong-Hyeon Choi;Jae-Yo Kim
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.36 no.2
    • /
    • pp.85-92
    • /
    • 2023
  • Unlike a completed building, a building under construction may be at risk in terms of safety if a load exceeds the value considered in the design stage owing to various factors, such as a load action different from that in the design stage and insufficient concrete strength. In addition, if an earthquake occurs in a building under construction, greater damage may occur. Therefore, this study studied example models with various sizes of 5, 15, 25, and 60 floors for typical building types and analyzed the effects of seismic load on buildings under construction using construction-stage models according to frame completeness. Because the construction period of the building is much shorter than the period of use after completion, applying same earthquake loads as the design stage to buildings under construction may be excessive. Therefore, earthquakes with a return period of 50 to 2,400 years were applied to the construction stage model to review the seismic loads and analyze the structural performances of the members. Thus, we reviewed whether a load exceeding that of the design stage was applied and the return period level of the earthquake that could ensure structural safety. In addition, assuming the construction period of each example model, the earthquake return period according to the construction period was selected, and the design appropriateness with the selected return period was checked.

Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.