Um Jeong-Hyo;Cho Seung-Hyun;Kang Ki-Suk;Kim Ki-Moon;Kim Chang-Duk
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.630-633
/
2003
In domestic construction industry, now demand for airport facilities, gymnastic facilities, mass meeting facilities, sales facilities is increasing. Because of this, demand for huge space is also increasing. In making huge space, existing PEB(Pre-Engineered Building) and Pipe Truss, As span is lager and larger, steel weight is increasing and hard to apply for large span. For solving this problem, Many program was proposed, and in that Space Frame was rising. But in domestic construction there are very rare practical use for Space Frame. In this study, we wish to introduce Space Frame that has several advantages in construction expense, construction time, constructibility and also with analyzing example for applying Space Frame, wish to investigate characteristic of Space Frame. Go forward better, through comparison of other different old method and basic character of Space Frame, confirm advantage of Space Frame that have infinite development possibility and revitalize the Space Frame in domestic study and further more wish to raise practical use for Space Frame.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.828-832
/
2008
In 2004, The U.S president Bush announces space Exploration Vision included in Lunar outpost plan. Following the Space Exploration Vision announced by Bush, NASA made Construction Roadmap and studied space construction varietly to construct Lunar Outpost in 2025. The purpose to construct Lunar outpost is to develop space science and hitech industry and to secure the lunar materials. Especially, Lunar has more than 5billion ton He-3. In this reason, The countries advanced in Space Industry like U.S., Japan, Europe and China is studying space construction to mine Lunar materials and shelter to live. In this paper, We will make definition and necesarity of space construction and research Space Construction research trends to use for the preparation of Korea's space construction roadmap.
International conference on construction engineering and project management
/
2007.03a
/
pp.573-582
/
2007
Working spaces in the construction site are much more complicated than completed spaces in the building. There are many researches focus on partition of building spaces. However, few discussed partition sequencing in building construction sites. Space syntax is a set of techniques for analyzing spatial configurations. It has become a useful tool in a variety of researches. Partition sequencing of working spaces should be related to the working direction. However, with convex space and axial line, the partition sequencing became unrelated to the working direction. When critical space is blocked, the partition sequencing with axial line will be changed. It is significant to reveal the impact of the entire spatial structure when some of the working spaces are blocked. This paper discussed the improved partition sequencing theory and highlighted the importance of critical space and analyzed the spatial structure of working space. A real case project was demonstrated in this paper.
Journal of The Korea Institute of Healthcare Architecture
/
v.11
no.1
/
pp.33-41
/
2005
The construction can proceed in different ways according to the acquired profitability of the hospital during the construction and to the features of departments or areas. This study is an analysis of remodeling construction processes to resolve major tasks of remodeling. The remodeling strategies gained from this study can be summed up as follows: 1) Remodeling work in hospitals involves the acquire relocation of space through extensive area renovations and then moving back to the space, and lastly working on the empty space. Thus, it is more advantageous in terms of construction work to demolish the existing buildings than to acquire the relocation space through extensions or renovations. That is, demolition after the maximum utilization of the existing buildings is the most desirable in terms of space availability. 2) The construction methods for remodeling are two: a method of carrying out construction by dividing the plane areas into several individual ones and of working on it floor by floor. In case of ward areas, and the outpatient area, the construction proceeds after securing the relocation space and partially setting construction areas in order to minimize the decrease in profitability due to the smaller number of beds and treatment rooms during construction. If the outpatient diagnosis/ treatment area and the supply area relocate together with the ward areas, there may be extra expenses. Thus, doing construction by area, while partially operating those areas or after relocating the whole areas.
International conference on construction engineering and project management
/
2013.01a
/
pp.509-512
/
2013
An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).
Proceedings of the Korean Institute of Building Construction Conference
/
2013.11a
/
pp.11-12
/
2013
It is required to response to the demand for new space due to high density of population and buildings in urban area. In particular, in case of big cities such as Seoul where the lack of new construction site due to the depletion of available space, existing buildings must be demolished for new construction. Utilization of urban underground space can be an alternative to solve for urban space problems. There are applications of underpinning methods using micropiles for existing buildings. Sometimes, the difficulties come from the compact space available for new foundation underneath the existing ones. In this paper, a novel underpinning method is introduced which can solve the space restriction problems underneath existing columns.
Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
International conference on construction engineering and project management
/
2009.05a
/
pp.1161-1165
/
2009
Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.
Early in the communist era, many cities in modern China experienced a special period of passive industrialization during which the construction of urban spaces laid the spatial urban foundation. During this period, the city construction was carried out rapidly under the administrative intervention of the government. The passive industrialization caused by taking economic construction as the center made the city construction deviate from the correct track and resulted in a variety of problems. Focusing on ecological space change, this paper selects Zhengzhou as an example of many similar cities in China, and analyzes the impact of passive industrialization on urban ecological spaces from the perspectives of city scale, city layout and city construction management system. The analysis results reveal that the construction of urban ecological space under the influence of passive industrialization induced a lagging characteristic, led to insufficient integrity of urban ecological space, and placed great pressure on the urban environment. Finally, the paper puts forward some methods to optimize the urban ecological space.
Journal of the Korean Institute of Landscape Architecture
/
v.22
no.1
/
pp.135-148
/
1994
When we put a construction on the space organization form of Seyeon-jong garden through a consequence of drawing analysis, we were able to certify that a certain space construction principle was applied as following. First, the arrangement and organization of space construction element embodied systematic order y clearing the character of space, and heightening the degree of cognizance with the means of functionability, scale, height, decorationability, an inclination of artificiality and nature, systemetic approchability. Second, the space construction element of Seyeon-jong garden pursued a harmony of human work and nature for creating a various atmosphere and visual quality. Third, Seyeon-jong garden constructed the space by establishing the measurement of human scale that introduced a conception of near, middle, distant view on the visual angle. Forth, Yun go san introduced the natural shape of 'The song of five friends' as a construction element, and represented the symbolism that he had seeked for throught he arrangement method, christening, composing technique of the space construction element for expressing ideal space which is described in 'The four season song of fishermen' spatially at Seyeon-jong garden. As the results of this study, that Yun go san created his own ideal space that he longed for at Seyeon-jong garden with applying fixed design system, and he realized his will that he strived to form a complete whole in perfect harmony.
Today, The representation of the modern space is experimented with shape and surface of the de-structural point of view to make architecture and space, in terms of not being able to make defined by single regulation. However, it can correspond to the rapidly changing modern, but it is easy to fade of architecture fundamental meaning. Along with the need for the rise of the construction of fundamental space, should be built a 'tectonic' spatial, which is said to be building of logos. Tectonic, as norms for expressing the fundamental meaning of architecture, as to expression of construction, be unfolded with dualism such as science and art, technology and express, structure and formation, and it was introduced into the architecture through the construction expression of space that was a tectonic discussion of 19c german architects. On the other hand Constructivism which is avant-garde formative movement with Russia revolution, constructed 'sculpture' with the formative principles as tectonic. Tectonic's Formative characteristics can draw a conclusion with of tectonic characteristics of constructivism sculpture, space of logos will be realized through its study. Other hand, The pavilion, as symbol space, can be analyzed by tectonic properties, Pavilion, meaning the space is expressed in a variety of tectonic expression. As tectonic construction, fundamental ideology and symbolization of space is revealed metaphorically and visually.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.